Projects / United Kingdom · Announced

Holtec / EDF SMR-300 proposal at Cottam

Holtec, EDF and Tritax plan small modular reactors at the former Cottam coal station (UK Government, February 2026).

Current status

Stage
Announced
How current
General record check . Bounded evidence review . None of the 2 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.
Same design
5 tracked: 1 licensing, 4 announced. 96 tracked at announced across all designs. Recorded stages, not proof of current activity.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Pressurized water reactor. How it works, with a 3D view.
Schematic of Rolls-Royce SMR, this type's example. On the left, a reactor vessel holds a core of fuel assemblies, with control rod drives above its head.
Schematic of Rolls-Royce SMR, this type's example.

Description

In June 2026 Holtec and EDF submitted a joint proposal for up to four SMR-300 units, aimed at 2030s operation. Plant output is not stated and is not inferred.

Key facts

Design
Holtec SMR-300 (SMR)
Technology
Pressurized water reactor (PWR) · light water. The 2024 SMR Technology Catalogue describes a two-loop pressurized water reactor, so no integral layout is recorded.
Operator(s)
Not recorded
Vendor for linked design
Holtec International
Design origin
United States: where the design's vendor is recorded, not where parts are made · See designs from this origin on a 3D globe
Location
Former Cottam power station · United Kingdom · precision: site area (named plant, laboratory, base, port, campus or parcel)
OpenStreetMap Nominatim feature 'Cottam Power Station' (landuse industrial) for the named former station; site-area point, not a reactor plot.
Coordinates
53.3035, -0.7761 · site-area point (approximate)
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
2 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

Holtec / EDF SMR-300 proposal at Cottam is recorded at Former Cottam power station, England, United Kingdom. Operator: No operator is recorded. Recorded vendor: Holtec International. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: OpenStreetMap Nominatim geocoder, OpenStreetMap Nominatim result: 'Cottam Power Station' (landuse=industrial)

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Reactor supplier
Fuel
  • Fuel form stated for Holtec SMR-300UO2 pellet / square array
No project-specific fuel supply arrangement is recorded as a structured fact.

World Nuclear News of 24 June 2026 names Framatome fuel fabrication and services only as investment the Cottam project would enable. It does not describe a supply, fabrication or delivery contract for the Cottam units, and the UK government's 4 February 2026 notice names no fuel supplier. WNN: Holtec and EDF submit UK SMR project proposal; Government to unlock advanced nuclear to grow economy

Not found in the sources we checked (4): Customer or offtaker; Contractor; Funding and government decisions; Comparable schedule revision
Customer or offtaker

The UK government's 4 February 2026 notice and World Nuclear News of 24 June 2026 say the Cottam reactors would power new data centers on the site, but neither names a data-center operator, buyer, quantity or power purchase agreement. The 1 GW figure is the data-center project's target, and Tritax is described as a real-estate partner, not a buyer. WNN: Holtec and EDF submit UK SMR project proposal; Government to unlock advanced nuclear to grow economy

Contractor

World Nuclear News of 24 June 2026 and the UK government's 4 February 2026 notice name no engineering or construction contractor for Cottam. The report says the two proposers, Holtec and EDF, submitted a joint proposal for up to four SMR-300 units and signed heads of terms to form a joint venture, and Tritax is named as a real-estate partner. The SMR-300's completed Generic Design Assessment step 2 is not a site license. WNN: Holtec and EDF submit UK SMR project proposal

Funding and government decisions

World Nuclear News of 24 June 2026 says the Cottam project would enable foreign direct investment, including in Framatome fuel fabrication and Arabelle Solutions turbine manufacture, but states no amount, investor commitment or award for Cottam. The UK government's 4 February 2026 notice states no Cottam sum. WNN: Holtec and EDF submit UK SMR project proposal; Government to unlock advanced nuclear to grow economy

Comparable schedule revision

Comparable schedule revision not established. World Nuclear News of 24 June 2026 gives one target, the SMR element becoming operational in the 2030s, alongside an end-of-decade target for the separate 1 GW data-center project. The UK government's 4 February 2026 notice gives no date. No source read restates the Cottam operation target, so no revision is shown. WNN: Holtec and EDF submit UK SMR project proposal; Government to unlock advanced nuclear to grow economy

Not recorded in SMRMap's reviewed evidence (3): Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
Operator or intended licensed owner
Site host or owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Assessments of the design (not of this site)

(1)
  • Holtec SMR-300 UK Generic Design Assessment (two steps) — applies to the design, not to a site
    Design assessment · Review completed (not an approval) · ONR/EA (UK) · completed 31 Mar 2026 · submitted Jan 2023
    Holtec submitted the design, then named SMR-160, to the UK government for entry into Generic Design Assessment in January 2023, according to the Environment Agency's Step 1 summary; it was renamed SMR-300 in January 2024. The UK regulators began a two-step Generic Design Assessment of Holtec's SMR-300 on 18 October 2023 at the government's request. Step 1 ran from October 2023 to August 2024 and Step 2 from August 2024 to March 2026. The Environment Agency records completing Step 2 on 31 March 2026, and ONR's page records the assessment as completed that month with no Step 3 and no Design Acceptance Confirmation. The assessment is not permission for any site, construction or operation.
    Sources: Environment Agency: assessing new nuclear reactor designs; ONR, Holtec SMR-300 Generic Design Assessment; Environment Agency: GDA Step 1 of the Holtec SMR, statement of findings public summary

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(4 notes, 1 not yet reviewed)
  • Evidence review. The UK government notice published 4 February 2026 welcomes small modular reactors at the former Cottam coal station in Nottinghamshire to supply data centers on the site. World Nuclear News reported on 24 June 2026 that Holtec and EDF submitted a joint proposal for up to four SMR-300 units at Cottam and signed heads of terms for a joint venture. Up to four is a ceiling, not a selected count. The same report says the project would enable investment including nuclear fuel fabrication by Framatome, which is an investment prospect, not a fuel contract. No license or licensed operator is named. The stored SMR-300 design, Holtec as vendor and announced stage stay. EDF is a joint proposer in this article, not identified as the operator. Last checked 19 Oct 2026. Government to unlock advanced nuclear to grow economy; WNN: Holtec and EDF submit UK SMR project proposal
    What would change this

    A planning or nuclear-site application naming the Cottam plot and a selected unit count would change this record. Next scheduled check: 19 Jan 2027.

  • Next decision and prerequisites. After the June 2026 joint proposal and heads of terms, the next steps reported are forming the Holtec-EDF joint venture and the site-specific regulatory assessment that World Nuclear News says is still needed. The data center is targeted for the end of the decade and the SMRs for the 2030s; no decision date is given in the sources reviewed. Last checked 23 Oct 2026. WNN: Holtec and EDF submit UK SMR project proposal
    What would change this

    Formation of the Holtec-EDF joint venture or a site-specific regulatory application for Cottam. Next scheduled check: 23 Apr 2027.

  • Permissions and public process. World Nuclear News reported on 24 June 2026 that Holtec and EDF submitted a joint proposal for up to four SMR-300 units at Cottam and signed heads of terms for a joint venture; the article does not say which body received the proposal. It notes the SMR-300 completed step 2 of the UK Generic Design Assessment and that further site-specific regulatory assessment is still needed. No site license, planning application or consultation is shown in the sources reviewed. Last checked 23 Oct 2026. WNN: Holtec and EDF submit UK SMR project proposal
    What would change this

    An ONR site license application, planning application or public consultation for the Cottam SMR-300 project. Next scheduled check: 23 Apr 2027.

  • Site dependencies (land, grid, water). World Nuclear News reports that the Cottam project would use the former coal power station site, which stopped generating in 2019 and has existing grid infrastructure, and the UK Government's February 2026 release says the reactors would supply data centers on the site. Existing grid infrastructure is not a connection agreement, and the sources reviewed describe no land agreement terms or cooling-water arrangement. Last checked 23 Oct 2026. WNN: Holtec and EDF submit UK SMR project proposal; Government to unlock advanced nuclear to grow economy
    What would change this

    A grid connection agreement, land agreement or planning documents for the Cottam SMR-300 project. Next scheduled check: 23 Apr 2027.

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(0 of 2 sources with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated recorded event: no date recorded.2 of 2 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(2)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Holtec / EDF SMR-300 proposal at Cottam — https://smrmap.com/projects/cottam-smr300/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Holtec / EDF SMR-300 proposal at Cottam”. Record reviewed 2 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/cottam-smr300/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.