Projects / Poland · Suspended

SGP Industria Rolls-Royce SMR plant (2024 decision in principle)

Poland granted SGP Industria a decision in principle in May 2024 for a plant using Rolls-Royce SMR technology, a project now recorded as suspended.

Current status

Stage
Suspended
How current
General record check . Bounded evidence review . None of the 4 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • No map pin is shown for this record.
  • Expected for this stage but not recorded as a structured fact: Site location recorded as disclosed (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Same design
6 tracked: 5 siting. Separately: 1 suspended. 6 tracked at suspended across all designs. Recorded stages, not proof of current activity.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Pressurized water reactor. How it works, with a 3D view.
Schematic of Rolls-Royce SMR. On the left, a reactor vessel holds a core of fuel assemblies, with control rod drives above its head.
Schematic of Rolls-Royce SMR.

Description

The location is left to later decisions (press reports name Chmielnik or Daleszyce; WNA gives a different area). In 2026 the ministry told parliament the project is not currently being implemented. The program text says "Projekt Świętokrzyskiej Grupy Przemysłowej Industria – aktualnie zawieszony." Capacity reports conflict and are not stored.

Key facts

Design
Rolls-Royce SMR (SMR)
Technology
Pressurized water reactor (PWR) · light water. The 2024 SMR Technology Catalogue describes a three-loop pressurized water reactor, so no integral layout is recorded.
Reactor vessel of this design
7.82 m tall, 4.2 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 79.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
All vessels to scale
Operator(s)
Not recorded
Vendor for linked design
Rolls-Royce SMR
Design origin
United Kingdom: where the design's vendor is recorded, not where parts are made · See designs from this origin on a 3D globe
Location
Industria SMR location (not fixed) · Poland · precision: region only
Searchable without an invented map pin.
Coordinates
Region only, no map pin
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
2 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes

SGP Industria Rolls-Royce SMR plant (2024 decision in principle) is recorded at Industria SMR location (not fixed), Świętokrzyskie, Poland. Operator: No operator is recorded. Recorded vendor: Rolls-Royce SMR. Stage: Suspended. Location precision: region only; region only, no map pin.

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project. The linked design record states 1358 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Reactor supplier
Fuel
  • Fuel form stated for Rolls-Royce SMRUO2
No project-specific fuel supply arrangement is recorded as a structured fact.

The climate ministry's 13 May 2024 announcement says the decision in principle covers a spent-fuel store as an integral part of the plant, which is not a fresh-fuel supply. No opened page names a fuel manufacturer, quantity or delivery for Industria's Rolls-Royce SMR units. Ministry of Climate: decision in principle for an SMR plant in Rolls-Royce SMR technology

Not found in the sources we checked (4): Customer or offtaker; Contractor; Funding and government decisions; Comparable schedule revision
Customer or offtaker

Poland's nuclear program text says some potential investors, including Industria, reported plans to use heat from nuclear units for industry and municipal district-heating systems, but it names no plant, factory, network or buyer for Industria. The 13 May 2024 ministry announcement, the 14 May 2024 nuclear.pl report and the 10 August 2026 Gramwzielone article name no buyer either, and the project is currently suspended. Government of Poland: Polish Nuclear Power Programme update attachment

Contractor

The climate ministry's 13 May 2024 announcement says the 10 May 2024 decision in principle for Industria covers a plant using Rolls-Royce SMR technology and allows it to seek later decisions such as a location decision. That is a government permission for the developer, and Rolls-Royce SMR is the technology vendor. No engineering or construction contractor is named in the opened pages, and the project is now suspended. Ministry of Climate: decision in principle for an SMR plant in Rolls-Royce SMR technology; Government of Poland: Polish Nuclear Power Programme update attachment

Funding and government decisions

Poland's nuclear program text says projects outside the national program mobilise private capital, and the 10 August 2026 Gramwzielone article says a planned SMR roadmap would list possible kinds of public aid decided case by case. Neither, nor the 2024 ministry and nuclear.pl pages, states an amount, investor or award for the Industria project. Government of Poland: Polish Nuclear Power Programme update attachment; Gramwzielone: two SMR projects in Poland no longer being developed

Comparable schedule revision

Comparable schedule revision not established. The decision in principle is dated 10 May 2024, and in 2026 the energy ministry described the Industria project as not currently being implemented and suspended, according to the 10 August 2026 Gramwzielone article and the program text. No source read gives a construction or operation target, so a suspension is a status change, not a revised date. Ministry of Climate: decision in principle for an SMR plant in Rolls-Royce SMR technology; Gramwzielone: two SMR projects in Poland no longer being developed; Government of Poland: Polish Nuclear Power Programme update attachment

Not recorded in SMRMap's reviewed evidence (3): Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
Operator or intended licensed owner
Reviewed 20 Oct 2026: not disclosed in the reviewed evidence.
Site host or owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Assessments of the design (not of this site)

(2)
  • Rolls-Royce SMR Generic Design Assessment — applies to the design, not to a site
    Design assessment sought · Under review · ONR/EA (UK)
    Generic Design Assessment of the Rolls-Royce SMR design by the UK regulators. ONR's page (read 3 October 2026) shows Step 1 from April 2022 to April 2023, Step 2 to July 2024 with published Step 2 statements, and Step 3 under way since July 2024. A GDA assesses the generic design only; it is not permission for any site, construction or operation, and no Step 3 conclusion is recorded here. The reactors index, fetched 5 October 2026, still lists this as the active assessment and does not record a Step 3 conclusion. Re-read on 28 October 2026, ONR's page still describes the assessment as ongoing.
    Sources: ONR Generic Design Assessment: Rolls-Royce SMR

    Status confirmed on against ONR Generic Design Assessment: Rolls-Royce SMR. This confirms the recorded status only; the general record check date remains separate.

  • Rolls-Royce SMR UK Generic Design Assessment, Step 2 — applies to the design, not to a site
    Design assessment · Review completed (not an approval) · ONR/EA (UK) · completed 30 Jul 2024
    The UK regulators completed Step 2 of their three-step Generic Design Assessment of the Rolls-Royce SMR on 30 July 2024 and issued Step 2 statements. Step 2 began on 3 April 2023, after Step 1 from April 2022 to April 2023. Step 3, the detailed assessment, began in July 2024 and is recorded separately as under way. Completing Step 2 is not a Design Acceptance Confirmation or permission for any site.
    Sources: Environment Agency: assessing new nuclear reactor designs; ONR Generic Design Assessment: Rolls-Royce SMR; Environment Agency and Natural Resources Wales: GDA Step 2 of the Rolls-Royce SMR

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(7 notes)

Evidence dates

(0 of 4 sources with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated recorded event: no date recorded.4 of 4 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(4)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: SGP Industria Rolls-Royce SMR plant (2024 decision in principle) — https://smrmap.com/projects/industria-rr-smr/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “SGP Industria Rolls-Royce SMR plant (2024 decision in principle)”. Record reviewed 2 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/industria-rr-smr/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.