Rolls-Royce SMR

UK PWR SMR ~470 MWe. Electrical output is above the informal ~300 MWe band; included because it is regulated and marketed as an SMR / factory-fabricated PWR plant. ONR's assessment page records completion of UK Generic Design Assessment Step 2 in July 2024 and the start of Step 3 that month. The page captured 14 October 2026 describes assessment as ongoing; it does not establish Step 3 completion or a Design Acceptance Confirmation. Design assessment and selection for a project do not replace site-specific licensing, planning and environmental permissions. On 28 October 2025 BWXT announced a steam-generator detailed-design contract with Rolls-Royce SMR and a separate memorandum covering prospective manufacturing cooperation. The design contract does not establish a manufacturing order or hardware delivery under the memorandum.

Reactor type
Pressurized water reactor. How it works, with a 3D view.
Projects
Siting: 5 projects. Furthest recorded stage of 6 using this design, including 1 suspended. Development status as stated: Mature conceptual design.
Evidence
6 sources; first primary source: IAEA ARIS design record: Rolls-Royce SMR. Record reviewed 1 Oct 2026.
Schematic of Rolls-Royce SMR. On the left, a reactor vessel holds a core of fuel assemblies, with control rod drives above its head.
Schematic of Rolls-Royce SMR.

Key facts

Class
SMR
Technology
Pressurized water reactor (PWR)
The 2024 SMR Technology Catalogue describes a three-loop pressurized water reactor, so no integral layout is recorded.
Coolant
Light water
Spectrum
Thermal
Developer / vendor(s)
Rolls-Royce SMR
Module electrical
470 MWe (net)
Module thermal
1358 MWth (nameplate; basis unspecified)
Fuel form
UO2
Development status (as stated)
Mature conceptual design
Reactor vessel
7.82 m tall, 4.2 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 79.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
10 m bar; a person 1.8 m tall
Rolls-Royce SMR
7.82 m tall, 4.2 m across
All vessels to scale
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
1 Oct 2026 (record review date, not proof of current availability or a deployment)

Tracked deployment projects

Agreements naming this design

(7)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(6)

Evidence and open questions

(2 notes)
  • Evidence review. The 2024 SMR Technology Catalogue (third edition, June 2025) lists the Rolls-Royce SMR from Rolls-Royce SMR Limited, United Kingdom, as a 3-loop PWR with light-water coolant and moderator, 1358 MW(t)/470 MW(e), UO2 fuel enriched up to 4.95% in 17x17 assemblies and design status 'Mature conceptual design', primarily for baseload electricity. The October 2024 ARIS record gives a thermal neutron spectrum and 'Detailed Design' status. ONR's GDA page names Rolls-Royce SMR Limited as designer and says the 470 MWe design completed Step 2 (April 2023 to July 2024), Step 3 began in July 2024 and assessment is ongoing; this is a design-stage instrument, not a site permission. BWXT's 28 October 2025 release describes a steam-generator detailed-design contract and a memorandum, and says Rolls-Royce SMR was selected as preferred bidder in the Great British Energy - Nuclear competition and by CEZ in the Czech Republic. Stored vendor, light-water coolant, thermal spectrum, the 470 MWe figure and UO2 fuel stay; the catalog does not state the electrical basis. The catalog's 1358 MW(t) thermal rating is added. The WNA SMR page (updated 1 October 2026) no longer names this design. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition); ONR Generic Design Assessment: Rolls-Royce SMR; BWXT: Rolls-Royce SMR steam-generator design contract and separate memorandum
    What would change this

    ONR's GDA Step 3 conclusion for the Rolls-Royce SMR (a Design Acceptance Confirmation or a statement that Step 3 is complete), which would change the dated design status. Next scheduled check: 19 Jan 2027.

  • Technology family. The 2024 SMR Technology Catalogue describes a three-loop pressurized water reactor, so no integral layout is recorded. Last checked 1 Nov 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
    What would change this

    A developer, regulator or IAEA document that states this design's primary-circuit layout. Next scheduled check: 1 Feb 2027.

Regulatory actions

Compare reviews and approvals across designs

Design assessment

  • Rolls-Royce SMR UK Generic Design Assessment, Step 2 — applies to the design, not to a site
    Design assessment · Review completed (not an approval) · ONR/EA (UK) · completed 30 Jul 2024
    The UK regulators completed Step 2 of their three-step Generic Design Assessment of the Rolls-Royce SMR on 30 July 2024 and issued Step 2 statements. Step 2 began on 3 April 2023, after Step 1 from April 2022 to April 2023. Step 3, the detailed assessment, began in July 2024 and is recorded separately as under way. Completing Step 2 is not a Design Acceptance Confirmation or permission for any site.
    Sources: Environment Agency: assessing new nuclear reactor designs; ONR Generic Design Assessment: Rolls-Royce SMR; Environment Agency and Natural Resources Wales: GDA Step 2 of the Rolls-Royce SMR
  • Rolls-Royce SMR Generic Design Assessment — applies to the design, not to a site
    Design assessment sought · Under review · ONR/EA (UK)
    Generic Design Assessment of the Rolls-Royce SMR design by the UK regulators. ONR's page (read 3 October 2026) shows Step 1 from April 2022 to April 2023, Step 2 to July 2024 with published Step 2 statements, and Step 3 under way since July 2024. A GDA assesses the generic design only; it is not permission for any site, construction or operation, and no Step 3 conclusion is recorded here. The reactors index, fetched 5 October 2026, still lists this as the active assessment and does not record a Step 3 conclusion. Re-read on 28 October 2026, ONR's page still describes the assessment as ongoing.
    Sources: ONR Generic Design Assessment: Rolls-Royce SMR

    Status confirmed on against ONR Generic Design Assessment: Rolls-Royce SMR. This confirms the recorded status only; the general record check date remains separate.