Projects / United States · Announced
Midpoint SMR Project #1 (Sawtooth / SEDC, Jerome County)
Sawtooth Energy & Development Corporation proposes Midpoint SMR Project #1 on BLM land in Jerome County, Idaho.
Current status
- How current
- General record check . Bounded evidence review . 1 of 4 listed sources has a publication or document date recorded here: 22 Aug 2025. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
No dated development is recorded. Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- No actual dated development is recorded.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Electrical output is not recorded.
- Thermal output is not recorded on this project.
- The mapped point is not an exact surveyed coordinate.
- Expected for this stage but not recorded as a structured fact: Design identified (reviewed: sources conflict; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
View on the map · View on the 3D globe · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
Utility Dive (14 July 2025) reports a proponent-proposed configuration of six 77-MW NuScale VOYGR modules (462 MWe) and notes no NuScale engagement or written deal; SEDC's current page describes three to six modules of 60–200 MWe each (up to 600 MWe). Treat VOYGR/462 MWe figures as a dated proposed configuration from secondary reporting, not confirmed vendor selection or an independently opened EIS docket. Formal NRC docketing and later disposition are not established here.
Key facts
- Design
- Design profile not linked (SMR)
- Technology
- Not recorded on a linked design profile — see the description
- Operator(s)
- Sawtooth Energy & Development Corporation
- Vendor for linked design
- No selected-design vendor recorded
- Location
- Midpoint SMR Project #1 (Jerome County BLM) · United States · precision: site area (named plant, laboratory, base, port, campus or parcel)
Approximate coordinates of the named Midpoint SMR Project #1 from the NuclearChain reactors export (CC BY 4.0; derived from GEM's tracker), cross-checked with SEDC description of ~320-acre BLM land in Jerome County (~14.5 miles NE of Jerome). Not a surveyed parcel centroid. Same point as GEM public map layer (August 2026) feature L100001047895 (approx 42.8179, -114.3741); workbook/NOTICE not retrieved. GEM status labels not imported as project disposition. - Coordinates
- 42.8179, -114.3741 · site-area point (approximate)
- Electrical capacity
- Not recorded · scope: plant
- Thermal capacity
- Not recorded
- Modules planned
- Not recorded
- Inclusion basis
- Vendor SMR claim, capacity checked
- Confidence
- medium
- Record reviewed
- 2 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes
Midpoint SMR Project #1 (Sawtooth / SEDC, Jerome County) is recorded at Midpoint SMR Project #1 (Jerome County BLM), Idaho, United States. Operator: Sawtooth Energy & Development Corporation. Recorded vendor: No selected-design vendor is recorded. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).
Coordinate source: NuclearChain reactors.csv export (unit coordinates), NuclearChain reactors.csv row 'midpoint-smr-nuclear-power-plant-1' (42.81786, -114.37406)
Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Operator or intended licensed owner
Not found in the sources we checked (5): Customer or offtaker; Contractor; Funding and government decisions; Fuel; Comparable schedule revision
- Customer or offtaker
Sawtooth Energy & Development Corporation's project page says Midpoint SMR Project #1 would connect to Idaho Power's Midpoint Substation and serve growing regional demand, including sectors such as AI development, but it names no buyer, quantity or power purchase agreement. A grid connection point is not an offtake. The Global Energy Monitor entry names no customer either. SEDC Midpoint Small Modular Reactor Project #1
- Contractor
Sawtooth Energy & Development Corporation's project page says the company proposes to construct and operate Midpoint SMR Project #1 itself and names no reactor vendor, engineering firm or construction contractor. The Global Energy Monitor table lists a NuScale model, which is directory text, not a vendor or engineering agreement. SEDC Midpoint Small Modular Reactor Project #1; GEM Global Nuclear Power Tracker public map ? Midpoint SMR
- Funding and government decisions
Sawtooth Energy & Development Corporation's project page says the project would provide long-term revenue to the US government through the Bureau of Land Management but states no cost, investor, loan or financing for Midpoint SMR Project #1. The Global Energy Monitor entry states no amount. SEDC Midpoint Small Modular Reactor Project #1
- Fuel
- No design profile is linked, so no stated fuel is shown.No project-specific fuel supply arrangement is recorded as a structured fact.
Sawtooth Energy & Development Corporation's project page describes three to six SMR modules and the site but does not mention fuel, and the Global Energy Monitor table lists only a reactor type and model. No fuel supplier, fabrication or delivery for Midpoint SMR Project #1 is named. SEDC Midpoint Small Modular Reactor Project #1; GEM Global Nuclear Power Tracker public map ? Midpoint SMR
- Comparable schedule revision
Comparable schedule revision not established. Sawtooth Energy & Development Corporation's project page gives a configuration and site but no construction or operation year, and the Global Energy Monitor entry lists the plant as announced with only a page-edit date. No dated target exists in these sources, so no schedule revision is shown. SEDC Midpoint Small Modular Reactor Project #1; GEM Global Nuclear Power Tracker public map ? Midpoint SMR
Not recorded in SMRMap's reviewed evidence (4): Project proposer or applicant; Reactor supplier; Site host or owner; Programs and agreements naming the project
- Project proposer or applicant
- No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
- Reactor supplier
- Site host or owner
- Programs and agreements naming the project
Timeline
This timeline has no entries yet. Other dated information may appear in the description and checking notes.
New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(6 notes)
- Evidence review. SEDC proposes to construct and operate Midpoint Project #1 on approximately 320 acres of BLM land in Jerome County. Its page describes three to six modules, each 60–200 MWe, with a plant ceiling of 600 MWe. These ranges and a ceiling do not select a rating or unit count. Secondary catalog wording identifies a NuScale proposal, but no opened vendor agreement establishes that selection. SEDC's assertion about an environmental impact statement is not an independently opened agency decision or NRC permission. Last checked 19 Oct 2026. SEDC Midpoint Small Modular Reactor Project #1; GEM Global Nuclear Power Tracker public map ? Midpoint SMR
What would change this
An agency docket or decision for Midpoint and a project-specific vendor agreement resolving its configuration and land rights. Next scheduled check: 19 Jan 2027.
- Design identified: Sources conflict. The proponent gives module ranges without selecting a model; secondary catalog NuScale wording does not establish a signed vendor selection. Last checked 19 Oct 2026. SEDC Midpoint Small Modular Reactor Project #1; GEM Global Nuclear Power Tracker public map ? Midpoint SMR
What would change this
An agency docket or decision for Midpoint and a project-specific vendor agreement resolving its configuration and land rights. Next scheduled check: 19 Jan 2027.
- Permissions and public process. SEDC's project page says an environmental impact statement evaluated the project against a no-action alternative and found no significant adverse impacts with mitigation. The page does not name the agency or document, and it names no BLM right-of-way grant, NRC application or public hearing, so no permission is established in the sources reviewed. Last checked 23 Oct 2026. SEDC Midpoint Small Modular Reactor Project #1
What would change this
A BLM or NRC record identifying the environmental review and any land or license application for Midpoint. Next scheduled check: 21 Jan 2027.
- Site dependencies (land, grid, water). SEDC proposes the plant on about 320 acres of BLM land in Jerome County, about 14.5 miles north-east of Jerome, with little available water, so it would rely on minimal-water cooling, and a direct connection to Idaho Power's Midpoint Substation 2.75 miles west. These are the developer's descriptions; no land grant or interconnection agreement is named. Last checked 23 Oct 2026. SEDC Midpoint Small Modular Reactor Project #1
What would change this
A BLM land decision or Idaho Power interconnection record for the Midpoint project. Next scheduled check: 21 Jan 2027.
- Next decision and prerequisites. Sawtooth Energy & Development Corporation's own August 2025 draft environmental impact statement says the decision to be made is whether to approve Midpoint SMR Project #1 under NEPA, Idaho environmental permitting and NRC licensing, with Bureau of Land Management land use authorization under an SF-299 right-of-way application. It targets power by mid-2031 or early 2032. The draft was written by the developer, and the sources reviewed identify no agency docket, accepted application or decision. Last checked 23 Oct 2026. Midpoint Small Modular Reactor Project #1 Draft Environmental Impact Statement (3rd amended, 22 August 2025)
What would change this
A Bureau of Land Management right-of-way record or an NRC docket for Midpoint SMR Project #1, or a decision by either agency. Next scheduled check: 23 Apr 2027.
- Spent fuel, waste and closure. The developer's 2025 draft environmental impact statement proposes on-site dry-cask storage for Midpoint, including an interim period of up to 60 years while awaiting federal action. It describes eventual offsite transfer to an approved facility at decommissioning. These are developer proposals. Naming NRC as lead agency on the cover does not establish agency issuance, review or acceptance, and the cited text supplies no approved destination or executed transfer agreement. Last checked 23 Oct 2026. Midpoint Small Modular Reactor Project #1 Draft Environmental Impact Statement (3rd amended, 22 August 2025)
What would change this
An NRC-docketed application or NRC environmental document for the Midpoint project that confirms or changes its spent-fuel storage plan. Next scheduled check: 21 Jan 2027.
Evidence dates
(1 of 4 sources with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(4)
- SEDC Midpoint Small Modular Reactor Project #1 (company, accessed 2 Oct 2026)
- Utility Dive: Midpoint SMR / Lava Ridge nuclear proposal reporting (news report, accessed 2 Oct 2026)
- GEM Global Nuclear Power Tracker public map ? Midpoint SMR (directory or tracker, accessed 2 Oct 2026)
- Midpoint Small Modular Reactor Project #1 Draft Environmental Impact Statement (3rd amended, 22 August 2025) (company, published 22 Aug 2025, accessed 23 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: Midpoint SMR Project #1 (Sawtooth / SEDC, Jerome County) — https://smrmap.com/projects/midpoint-smr/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “Midpoint SMR Project #1 (Sawtooth / SEDC, Jerome County)”. Record reviewed 2 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/midpoint-smr/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.