Projects / United States · Announced

Dominion North Anna SMR proposal

One or more SMRs under development at North Anna, without a selected design or commitment to build.

Current status

Stage
Announced
How current
General record check . Bounded evidence review . None of the 2 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.
  • Expected for this stage but not recorded as a structured fact: Design identified (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Description

This record does not inherit operating status or capacity from the existing large reactors.

Key facts

Design
Design profile not linked (SMR)
Technology
Not recorded on a linked design profile — see the description
Operator(s)
Not recorded
Vendor for linked design
No selected-design vendor recorded
Location
North Anna Power Station, Louisa County · United States · precision: site area (named plant, laboratory, base, port, campus or parcel)
Approximate coordinates for the named North Anna site from the NuclearChain reactors export (CC BY 4.0; derived from GEM's tracker); Dominion North Anna SMR proposal at that named plant.
Coordinates
38.0602, -77.7919 · site-area point (approximate)
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
2 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

Dominion North Anna SMR proposal is recorded at North Anna Power Station, Louisa County, Virginia, United States. Operator: No operator is recorded. Recorded vendor: No selected-design vendor is recorded. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: NuclearChain reactors.csv export (unit coordinates), NuclearChain reactors.csv row 'north-anna-nuclear-power-plant-smr' (38.0602308, -77.7918526)

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Not found in the sources we checked (5): Customer or offtaker; Contractor; Funding and government decisions; Fuel; Comparable schedule revision
Customer or offtaker

The page says Dominion is developing one or more SMRs on the existing North Anna Energy Center property. It names no buyer, quantity, or agreement for those SMRs. The homes figure on the page belongs to the operating station. Dominion North Anna SMR planning

Contractor

The page says a commitment to construction has not been made and that Dominion is in the development phase for one or more SMRs. Factory construction is described for SMRs in general. No engineering or construction firm is named. Dominion remains the proposer, not a newly appointed SMR operator. Dominion North Anna SMR planning

Funding and government decisions

The page says smaller factory-built designs can possibly reduce project cost. That is a general description of SMRs. It states no amount, application, allocation, or disbursement for this proposal. Dominion North Anna SMR planning

Fuel
No design profile is linked, so no stated fuel is shown.No project-specific fuel supply arrangement is recorded as a structured fact.

The page explains that SMRs, like the existing units, use fission by splitting uranium atoms. That is a description of the technology. It names no supplier, enrichment, quantity, or delivery for this proposal. Dominion North Anna SMR planning

Comparable schedule revision

Comparable schedule revision not established. The page says construction has not been committed and gives no date for an SMR milestone. There are not two dated statements of the same milestone. The 945 and 950 megawatt sentences describe the existing station, not an SMR schedule. Dominion North Anna SMR planning

Not recorded in SMRMap's reviewed evidence (4): Operator or intended licensed owner; Reactor supplier; Site host or owner; Programs and agreements naming the project
Operator or intended licensed owner
Reactor supplier
Site host or owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(5 notes, 1 not yet reviewed)
  • Evidence review. Dominion’s page says a commitment to construction has not been made and that it is in the development phase for one or more SMRs co-located with North Anna Power Station on the existing North Anna Energy Center property. No design is named. The statement that Dominion operates the station, the about 945 MW figure for each existing unit, and the about 300 MW figure for most SMRs describe the operating station or SMRs in general. They are not this proposal’s status, count, or output. Stored electrical output stays empty, the design stays unselected, and the announced stage stays. Dominion is recorded as the proposer rather than as the SMR operator inherited from the operating units. The Global Energy Monitor page that is attached does not mention this project. Last checked 19 Oct 2026. Dominion North Anna SMR planning
    What would change this

    A Dominion design selection, or a project-specific application, for the North Anna SMR proposal. Next scheduled check: 19 Jan 2027.

  • Design identified: Not disclosed in the reviewed evidence. The SMR section names no design. The about 300 MW sentence is a general comparison, not a selected rating. Last checked 19 Oct 2026. Dominion North Anna SMR planning
    What would change this

    A Dominion statement that selects the SMR design for North Anna. Next scheduled check: 19 Jan 2027.

  • Next decision and prerequisites. Dominion's North Anna page says no commitment to construction has been made and that it anticipates its first SMR could be operational by the early-to-mid 2030s. The next consequential step is therefore a Dominion decision to commit to an SMR at North Anna, including a design choice; the operating date is a target, not a decision. Last checked 23 Oct 2026. Dominion North Anna SMR planning
    What would change this

    A Dominion announcement selecting an SMR design or committing to build at North Anna. Next scheduled check: 23 Apr 2027.

  • Permissions and public process: Not disclosed in the reviewed evidence. Dominion Energy's North Anna page says Dominion has been evaluating small modular reactors since 2020 and is in the development phase for one or more SMRs at North Anna, without a commitment to build. The page does not mention any NRC application, environmental review or public meeting for the SMR project, and offers only an SMR project-team contact. Last checked 23 Oct 2026. Dominion North Anna SMR planning
    What would change this

    A Dominion NRC filing or public meeting for SMRs at North Anna. Next scheduled check: 23 Apr 2027.

  • Site dependencies (land, grid, water). Dominion's North Anna page says any SMRs would be co-located with the North Anna Power Station on Dominion's existing North Anna Energy Center property at Lake Anna in Louisa County, Virginia. That places the project on land Dominion already holds, but the page gives no exact location on the property and no grid-connection or cooling-water arrangement for the new units. Last checked 23 Oct 2026. Dominion North Anna SMR planning
    What would change this

    A Dominion filing or announcement locating the SMRs on the North Anna property or describing their cooling and grid connection. Next scheduled check: 23 Apr 2027.

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(0 of 2 sources with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated recorded event: no date recorded.2 of 2 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(2)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Dominion North Anna SMR proposal — https://smrmap.com/projects/north-anna-smr/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Dominion North Anna SMR proposal”. Record reviewed 2 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/north-anna-smr/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.