Projects / United States · Announced

Purdue / Duke Energy SMR feasibility study for the Purdue campus

Purdue University and Duke Energy's small modular reactor feasibility study for the Purdue campus in West Lafayette is at the announced stage.

Current status

Stage
Announced
How current
General record check . Bounded evidence review . 1 of 2 listed sources has a publication or document date recorded here: 10 May 2023. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.
  • Expected for this stage but not recorded as a structured fact: Design identified (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Description

Purdue and Duke Energy announced in April 2022 that they would study power from small modular reactors for the West Lafayette campus. No site, design or license is established.

Key facts

Design
Design profile not linked (SMR)
Technology
Not recorded on a linked design profile — see the description
Operator(s)
Not recorded
Vendor for linked design
No selected-design vendor recorded
Location
Purdue University campus, West Lafayette · United States · precision: site area (named plant, laboratory, base, port, campus or parcel)
Campus point from the Wikipedia article for Purdue University; the study concerns supplying the West Lafayette campus and names no plant plot, so this is a campus point (Penn State precedent).
Coordinates
40.425, -86.92306 · site-area point (approximate)
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
low
Record reviewed
2 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes

Purdue / Duke Energy SMR feasibility study for the Purdue campus is recorded at Purdue University campus, West Lafayette, Indiana, United States. Operator: No operator is recorded. Recorded vendor: No selected-design vendor is recorded. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: Wikipedia: Purdue University (article coordinates), Article coordinate 40.425, -86.92306 on 'Purdue University', read 30 October 2026

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Customer or offtaker

Source-backed project statement Duke Energy's 27 April 2022 release says an SMR could meet current and future needs of Purdue's West Lafayette campus and provide excess power to the state grid, and Purdue's 10 May 2023 release says the study asked whether advanced reactors could power the campus in the 2030s and beyond. The intended user is Purdue's own campus, at study stage. No power purchase agreement or other buyer is named, and no decision to build has been made. Purdue and Duke Energy to explore potential for clean nuclear power source for campus; Feasibility study: Advanced nuclear technology is a potential option to achieve zero carbon emissions for Purdue University - News

Not found in the sources we checked (4): Contractor; Funding and government decisions; Fuel; Comparable schedule revision
Contractor

Duke Energy's 27 April 2022 release says Purdue and Duke Energy will jointly explore feasibility, and Purdue's 10 May 2023 release says no technology has been selected and no decision to build has been made. The two partners are the project's proposers, and neither release names an engineering, study or construction contractor. Purdue and Duke Energy to explore potential for clean nuclear power source for campus; Feasibility study: Advanced nuclear technology is a potential option to achieve zero carbon emissions for Purdue University - News

Funding and government decisions

Purdue's 10 May 2023 release lists cost and economic studies as next steps and recommends federal and state support measures as policy items. It states no funder, amount or allocation for the campus study or a campus reactor. Feasibility study: Advanced nuclear technology is a potential option to achieve zero carbon emissions for Purdue University - News

Fuel
No design profile is linked, so no stated fuel is shown.No project-specific fuel supply arrangement is recorded as a structured fact.

Purdue's 10 May 2023 release lists a fuel availability program among federal policy recommendations, and Duke Energy's 27 April 2022 release describes Purdue's teaching reactor as too small to power the campus. Neither names a fuel supplier, quantity or delivery for a campus reactor. Feasibility study: Advanced nuclear technology is a potential option to achieve zero carbon emissions for Purdue University - News; Purdue and Duke Energy to explore potential for clean nuclear power source for campus

Comparable schedule revision

Comparable schedule revision not established. Duke Energy's 27 April 2022 release announced the study, and Purdue's 10 May 2023 release published an interim report with a 2030s horizon and a roughly ten-year development duration. These are different acts and general horizons, not two dates for one campus construction or operation milestone. Purdue and Duke Energy to explore potential for clean nuclear power source for campus; Feasibility study: Advanced nuclear technology is a potential option to achieve zero carbon emissions for Purdue University - News

Not recorded in SMRMap's reviewed evidence (4): Operator or intended licensed owner; Reactor supplier; Site host or owner; Programs and agreements naming the project
Operator or intended licensed owner
Reviewed 20 Oct 2026: not disclosed in the reviewed evidence.
Reactor supplier
Site host or owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(8 notes)
  • Evidence review. The 27 April 2022 Duke Energy release says Purdue University and Duke Energy will jointly explore the feasibility of advanced nuclear energy for the campus, and that they intend to study power from small modular reactors. It says an SMR could meet needs for the West Lafayette campus. It names no reactor design, no plant plot, and no license application. Duke's statement that it is the largest regulated nuclear plant operator in the nation is about Duke's existing fleet, not an appointment for this study. No output is stated for this campus study. The participating organizations retain only their source-supported roles; a reactor operator is not assigned from the study, proposer, parent, existing-fleet or proposed-owner relationship. Last checked 20 Oct 2026. Purdue and Duke Energy to explore potential for clean nuclear power source for campus
    What would change this

    A Purdue or Duke notice that names a reactor design, a plant location on the campus, or a license application. Next scheduled check: 20 Jan 2027.

  • Design identified: Not disclosed in the reviewed evidence. The release says the parties intend to study small modular reactors and that advanced nuclear technology is still under development. It names no vendor design. The steel-plate work at Bowen Laboratory is a construction-research sentence, not a selected reactor. Last checked 20 Oct 2026. Purdue and Duke Energy to explore potential for clean nuclear power source for campus
    What would change this

    A study result that names a reactor design for the Purdue campus. Next scheduled check: 20 Jan 2027.

  • Site location recorded as disclosed: Not disclosed in the reviewed evidence. The dateline is West Lafayette, and the release says an SMR could meet needs for Purdue's West Lafayette campus. Could is not a chosen plant plot. The map shows a campus point, not a plant plot. Last checked 20 Oct 2026. Purdue and Duke Energy to explore potential for clean nuclear power source for campus
    What would change this

    A siting notice that identifies where a reactor would stand on or near the campus. Next scheduled check: 20 Jan 2027.

  • Operator or intended licensed owner: Not disclosed in the reviewed evidence. The reviewed sources establish other participant roles, but do not appoint the recorded party as this reactor’s operator. The operator remains unassigned; this does not assert that no operator exists. Last checked 20 Oct 2026. Purdue and Duke Energy to explore potential for clean nuclear power source for campus
    What would change this

    A project-specific filing, operating agreement or developer statement explicitly names the proposed reactor operator. Next scheduled check: 20 Jan 2027.

  • Next decision and prerequisites. Purdue's May 2023 release says Purdue intends to continue with Duke Energy into the next phase of the study, recommending policy advocacy, further stakeholder engagement, cost and economic studies, site evaluations and technology assessments while monitoring first-of-a-kind projects. No decision to build or technology choice had been made, and no date is given for one. Last checked 23 Oct 2026. Feasibility study: Advanced nuclear technology is a potential option to achieve zero carbon emissions for Purdue University - News
    What would change this

    The next-phase study results or a decision by Purdue and Duke Energy on a campus SMR. Next scheduled check: 23 Apr 2027.

  • Permissions and public process. Purdue's 10 May 2023 release on the interim feasibility report says no technology has been selected and no decision to build has been made, and that Purdue and Duke Energy held a six-part public lecture series from August 2022 to February 2023 reaching about 4,900 people, recommending further stakeholder engagement. That is public engagement, not a licensing or consultation procedure; no NRC filing is described. Last checked 23 Oct 2026. Feasibility study: Advanced nuclear technology is a potential option to achieve zero carbon emissions for Purdue University - News
    What would change this

    A Purdue or Duke Energy decision to pursue an NRC application for a campus SMR. Next scheduled check: 23 Apr 2027.

  • Site dependencies (land, grid, water). Purdue's May 2023 release says the study asks whether advanced reactors could power the West Lafayette campus and supply excess energy to Indiana's grid, and lists site evaluations among the recommended next steps. No site on or near campus had been identified, and no land, grid or water arrangement is described. Last checked 23 Oct 2026. Feasibility study: Advanced nuclear technology is a potential option to achieve zero carbon emissions for Purdue University - News
    What would change this

    Publication of a Purdue or Duke Energy site evaluation for a campus SMR. Next scheduled check: 23 Apr 2027.

  • Spent fuel, waste and closure: Not disclosed in the reviewed evidence. Purdue's May 2023 release says the interim feasibility report examined used-fuel management among the challenges for small modular reactors, but it states no arrangement for storing or disposing of spent fuel from a campus reactor or who would be responsible. The arrangement is not disclosed in this source. Last checked 23 Oct 2026. Feasibility study: Advanced nuclear technology is a potential option to achieve zero carbon emissions for Purdue University - News
    What would change this

    A later Purdue-Duke Energy report setting out used-fuel management for a campus SMR. Next scheduled check: 23 Apr 2027.

Evidence dates

(1 of 2 sources with a publication or document date)
Latest dated listed source publication: Feasibility study: Advanced nuclear technology is a potential option to achieve zero carbon emissions for Purdue University - News: 10 May 2023.Latest dated recorded event: no date recorded.1 of 2 listed sources has no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(2)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Purdue / Duke Energy SMR feasibility study for the Purdue campus — https://smrmap.com/projects/purdue-duke-smr/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Purdue / Duke Energy SMR feasibility study for the Purdue campus”. Record reviewed 2 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/purdue-duke-smr/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.