Projects / Ukraine · Announced

Energoatom / Holtec Rivne SMR-160 proposal (MoU-era)

Holtec/Energoatom MoU-era materials describe an SMR-160 proposal referencing Rivne NPP replacement.

Current status

Stage
Announced
How current
General record check . Bounded evidence review . The listed source has no publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.
  • State or province is not recorded.
Same design
2 tracked. Separately: 2 earlier-plan records. 96 tracked at announced across all designs. Recorded stages, not proof of current activity.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Pressurized water reactor. How it works, with a 3D view.
Schematic of Rolls-Royce SMR, this type's example. On the left, a reactor vessel holds a core of fuel assemblies, with control rod drives above its head.
Schematic of Rolls-Royce SMR, this type's example.

Description

Later site-specific disposition is not established. Dated SMR-160 / Holtec identity is preserved; a newer design (including SMR-300) is not substituted.

Key facts

Design
Holtec SMR-160 (SMR)
Technology
Pressurized water reactor (PWR) · light water. The IAEA's 2016 SMR booklet lists the SMR-160 among integral designs, but its 2020 edition describes a steam generator joined to the reactor vessel by a single connection; with these conflicting descriptions, the type is recorded as a pressurized water reactor without an integral claim.
Operator(s)
Not recorded
Vendor for linked design
Holtec International
Design origin
United States: where the design's vendor is recorded, not where parts are made · See designs from this origin on a 3D globe
Location
Rivne NPP — historical SMR-160 replacement proposal · Ukraine · precision: site area (named plant, laboratory, base, port, campus or parcel)
NuclearChain export station point (derived from GEM's tracker) for Rivne NPP, the plant whose two VVER-440 units the SMR-160 pilot proposal would replace; plant-area pin only. The plant is at Varash, not Rivne city.
Coordinates
51.3245, 25.8974 · site-area point (approximate)
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Earlier-plan record (historical SMR program)
Confidence
medium
Record reviewed
2 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes

Energoatom / Holtec Rivne SMR-160 proposal (MoU-era) is recorded at Rivne NPP — historical SMR-160 replacement proposal, state or province not recorded, Ukraine. Operator: No operator is recorded. Recorded vendor: Holtec International. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: NuclearChain reactors.csv export (unit coordinates), NuclearChain reactors.csv row 'rivne-nuclear-power-plant-smr-1' (51.3245, 25.8974)

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project. The linked design record states 525 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Reactor supplier
Fuel
  • Fuel form stated for Holtec SMR-160UO2 pellet / square array
No project-specific fuel supply arrangement is recorded as a structured fact.

Holtec's 28 February 2018 release names the SMR-160 and the Rivne pilot but no fuel supplier, enrichment, allocation or delivery. A site navigation heading about nuclear fuel is not a commitment. Holtec: Energoatom MoU to build SMR-160 plants in Ukraine

Programs and agreements naming the project
Not found in the sources we checked (4): Customer or offtaker; Contractor; Funding and government decisions; Comparable schedule revision
Customer or offtaker

Holtec's 28 February 2018 release says Energoatom intends, as a pilot, to replace two Rivne VVER-440 units with SMR-160 reactors and that SMR-160s would likely also supply steam and power at Ukraine's industrial sites, none named. No buyer, quantity or agreement for a Rivne unit's output is stated. Holtec: Energoatom MoU to build SMR-160 plants in Ukraine

Contractor

Holtec's 28 February 2018 release says Holtec and Energoatom signed a memorandum envisaging Ukraine's adoption of the SMR-160, that Ukraine would become a manufacturing hub for its components, and that Holtec was in talks with unnamed Ukrainian machinery suppliers. A vendor memorandum with the proposer and unnamed supplier talks are not a contractor appointment, and no engineering or construction contractor is named for Rivne. Holtec: Energoatom MoU to build SMR-160 plants in Ukraine

Funding and government decisions

Holtec's 28 February 2018 release states no amount, funder or financing instrument for the Rivne SMR-160 proposal. Its mention of Holtec's chief executive serving on Ukraine's National Investment Council is a relationship statement, not funding. Holtec: Energoatom MoU to build SMR-160 plants in Ukraine

Comparable schedule revision

Comparable schedule revision not established. Holtec's 28 February 2018 release gives no construction or operation date for a Rivne SMR-160, only a national horizon for clean-power needs and a mid-2020s date for Holtec's own factory plans. There is no Rivne target to revise. Holtec: Energoatom MoU to build SMR-160 plants in Ukraine

Not recorded in SMRMap's reviewed evidence (2): Operator or intended licensed owner; Site host or owner
Operator or intended licensed owner
Reviewed 20 Oct 2026: not disclosed in the reviewed evidence.
Site host or owner

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Assessments of the design (not of this site)

(1)
  • CNSC vendor design review, Phase 1 (SMR-160) — applies to the design, not to a site
    Design assessment · Review completed (not an approval) · CNSC · completed Aug 2020
    CNSC lists Phase 1 of its pre-licensing vendor design review of the SMR-160 by SMR, LLC (Holtec International) among completed reviews, with an executive summary dated August 2020. No later phase is listed. CNSC says a vendor design review does not certify a design, issue a license or bind later Commission decisions.
    Sources: CNSC: vendor design review service agreements and completed reviews

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(5 notes, 1 not yet reviewed)
  • Evidence review. The 28 February 2018 Holtec release says Holtec and NAEK Energoatom signed a memorandum of understanding for Ukraine to adopt SMR-160 technology. In the same release, Energoatom's president states an intention to replace, as a pilot project, two VVER-440 units at the Rivne nuclear power plant with SMR-160 reactors. The figure two counts the VVER-440 units to be replaced. It is not stored as an SMR module count. The page does not state a megawatt rating for the Rivne proposal, a license, or a later site decision. The stored design remains SMR-160. A newer design is not substituted. The participating organizations retain only their source-supported roles; a reactor operator is not assigned from the study, proposer, parent, existing-fleet or proposed-owner relationship. Last checked 20 Oct 2026. Holtec: Energoatom MoU to build SMR-160 plants in Ukraine
    What would change this

    A later Energoatom or Holtec document that selects a Rivne site layout, a unit count, or a license application for this SMR-160 proposal. Next scheduled check: 20 Jan 2027.

  • Operator or intended licensed owner: Not disclosed in the reviewed evidence. The reviewed sources establish other participant roles, but do not appoint the recorded party as this reactor’s operator. The operator remains unassigned; this does not assert that no operator exists. Last checked 20 Oct 2026. Holtec: Energoatom MoU to build SMR-160 plants in Ukraine
    What would change this

    A project-specific filing, operating agreement or developer statement explicitly names the proposed reactor operator. Next scheduled check: 20 Jan 2027.

  • Next decision and prerequisites: Not disclosed in the reviewed evidence. Holtec's February 2018 release describes the memorandum, a manufacturing role for Ukraine and Energoatom's Rivne intention, but names no next decision, date or actor for a Rivne SMR-160 plant. No later Rivne-specific decision is recorded in the sources reviewed for this project. Last checked 23 Oct 2026. Holtec: Energoatom MoU to build SMR-160 plants in Ukraine
    What would change this

    An Energoatom or Holtec announcement on a Rivne SMR project, including any switch to a newer Holtec design. Next scheduled check: 23 Apr 2027.

  • Permissions and public process: Not disclosed in the reviewed evidence. Holtec's release of 28 February 2018 announces a memorandum under which Ukraine envisages adopting SMR-160 technology and reports Energoatom's stated intention to replace two Rivne VVER-440 units with SMR-160s as a pilot. It describes no license application to Ukraine's nuclear regulator, environmental assessment or public consultation for a Rivne SMR-160 plant. Last checked 23 Oct 2026. Holtec: Energoatom MoU to build SMR-160 plants in Ukraine
    What would change this

    A Ukrainian regulatory filing or environmental procedure for SMR-160 units at Rivne. Next scheduled check: 23 Apr 2027.

  • Site dependencies (land, grid, water). Holtec's February 2018 release reports Energoatom's president declaring the company's intention to replace, as a pilot project, two VVER-440 units of the Rivne nuclear plant with SMR-160 reactors. This is a stated intention tied to the existing Rivne site; the release names no land, grid or cooling arrangement for the new units. Last checked 23 Oct 2026. Holtec: Energoatom MoU to build SMR-160 plants in Ukraine
    What would change this

    An Energoatom site decision or feasibility study for SMR-160 units at Rivne. Next scheduled check: 23 Apr 2027.

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(0 of 1 source with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated recorded event: no date recorded.1 of 1 listed source has no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(1)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Energoatom / Holtec Rivne SMR-160 proposal (MoU-era) — https://smrmap.com/projects/rivne-smr160/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Energoatom / Holtec Rivne SMR-160 proposal (MoU-era)”. Record reviewed 2 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/rivne-smr160/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.