Holtec SMR-160
Dated Holtec SMR-160 light-water SMR identity referenced in Holtec/Energoatom MoU-era materials. Module rating shown as the design's stated figure; not evidence of a licensed Rivne deployment or present commercial availability.
- Reactor type
- Pressurized water reactor. How it works, with a 3D view.
- Projects
- No live project recorded here; 2 earlier-plan records.
- Evidence
- 3 sources; first primary source: Holtec: Energoatom MoU to build SMR-160 plants in Ukraine. Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Agreements · Sources · Evidence · Regulatory actions · Its projects in the table · Compare with other designs
Key facts
- Class
- SMR
- Technology
- Pressurized water reactor (PWR)
The IAEA's 2016 SMR booklet lists the SMR-160 among integral designs, but its 2020 edition describes a steam generator joined to the reactor vessel by a single connection; with these conflicting descriptions, the type is recorded as a pressurized water reactor without an integral claim. - Coolant
- Light water
- Spectrum
- Thermal
- Developer / vendor(s)
- Holtec International
- Module electrical
- 160 MWe (gross/net unspecified)
- Module thermal
- 525 MWth (nameplate; basis unspecified)
- Fuel form
- UO2 pellet / square array
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
Tracked deployment projects
- Energoatom / Holtec Rivne SMR-160 proposal (MoU-era) — Announced · Ukraine
- Holtec SMR-160 proposal at Savannah River Site (2012) — Announced · United States
Agreements naming this design (2)
Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.
- Energoatom and Holtec cooperation agreement for up to 20 SMR-160 plants in Ukraine — Fleet agreement · Active · announced 21 Apr 2023
Concerns Ukraine - KGHM Polska Miedź SMR program (suspended) — Fleet agreement · Paused · announced 2023
Concerns Poland
Design sources
(3)
- Holtec: Energoatom MoU to build SMR-160 plants in Ukraine (company, accessed 2 Oct 2026)
- IAEA 2020 SMR book: HTR-10 technical table (IAEA/NEA, accessed 8 Oct 2026)
- IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition) (IAEA/NEA, accessed 3 Oct 2026)
Catalog source date: 2021. Catalog basis: designer publication.
Evidence and open questions
(2 notes)
- Evidence review. The IAEA 'Advances in Small Modular Reactor Technology Developments' 2020 edition (September 2020) describes the SMR-160, developed by Holtec International, as an advanced PWR SMR producing 525 MW thermal or 160 MW electric power (basis unspecified), with light water coolant and moderator, a natural-circulation primary loop and UO2 pellets in a square array at up to 4.95% enrichment, primarily for electricity with optional cogeneration. That 2020 edition dates its status as developing a preliminary safety analysis report with CNSC vendor design review Phase 1 completed, and projected first operation by the mid-2020s, an edition-dated projection that is now stale. Holtec's release dated February 28, 2018 announces an MoU with NAEK Energoatom envisaging Ukraine's adoption of SMR-160 technology and Energoatom's stated intention to replace, as a pilot, 2 VVER-440 units of the Rivne NPP with SMR-160 reactors (the Rivne proposal); no opened source names the 2012 Savannah River proposal. Stored vendor, light-water coolant, 160 MWe (unspecified basis) and UO2 square-array fuel stay supported; the recorded 525 MWth thermal rating matches the 2020 edition's 525 MWt, and the thermal spectrum is not stated. Last checked 19 Oct 2026. IAEA 2020 SMR book: HTR-10 technical table; Holtec: Energoatom MoU to build SMR-160 plants in Ukraine
What would change this
A dated Holtec or regulator statement on the SMR-160's current status (for example whether it has been superseded by the SMR-300 in Holtec's offering, or a CNSC VDR record), or an Energoatom update on the Rivne MoU. Next scheduled check: 19 Jan 2027.
- Technology family. The IAEA's 2016 SMR booklet lists the SMR-160 among integral designs, but its 2020 edition describes a steam generator joined to the reactor vessel by a single connection; with these conflicting descriptions, the type is recorded as a pressurized water reactor without an integral claim. Last checked 1 Nov 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition); IAEA 2020 SMR book: HTR-10 technical table
What would change this
A developer, regulator or IAEA document that states this design's primary-circuit layout. Next scheduled check: 1 Feb 2027.
Regulatory actions
Compare reviews and approvals across designs
Design assessment
- CNSC vendor design review, Phase 1 (SMR-160) — applies to the design, not to a site
Design assessment · Review completed (not an approval) · CNSC · completed Aug 2020
CNSC lists Phase 1 of its pre-licensing vendor design review of the SMR-160 by SMR, LLC (Holtec International) among completed reviews, with an executive summary dated August 2020. No later phase is listed. CNSC says a vendor design review does not certify a design, issue a license or bind later Commission decisions.
Sources: CNSC: vendor design review service agreements and completed reviews