Projects / United States · Announced
Standard Power NuScale SMR facility in Ohio (site not disclosed)
Standard Power's NuScale SMR facility in Ohio is one announced facility, described by NuScale in October 2023, with no site disclosed.
Current status
- How current
- General record check . Bounded evidence review . The listed source has no publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
Newest recorded development . Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- Announced 6 Oct 2023 · Announcement: NuScale announces the Standard Power Ohio facility. Announcement of one Ohio facility. Source: NuScale: Standard Power plans SMR-powered facilities in Ohio and Pennsylvania (6 October 2023). Updates entry
More on this development
The 24-module and 1,848 MWe figures are combined with Pennsylvania and are not stored on this record.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Electrical output is not recorded.
- Thermal output is not recorded on this project.
- No operator is recorded.
- No map pin is shown for this record.
- Expected for this stage but not recorded as a structured fact: Design identified (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions); Site location recorded as disclosed (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
View on the map · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
NuScale's 6 October 2023 release describes Standard Power plans for facilities in Ohio and Pennsylvania using NuScale SMR technology with ENTRA1 Energy. It states 77 MWe modules but does not identify a named design version, so no specific design profile is linked. No site, county or host property is named for Ohio, and no map pin is shown. The combined 24 modules and 1,848 MWe cover both facilities; they are not allocated to this one. NuScale's full-year 2024 results and full-year 2025 results of 26 February 2026 do not mention Standard Power and do not record a termination.
Key facts
- Design
- Design profile not linked (SMR)
- Technology
- Not recorded on a linked design profile — see the description
- Operator(s)
- Not recorded
- Vendor for linked design
- NuScale Power
- Location
- Standard Power Ohio facility (site not disclosed) · United States · precision: region only
Searchable without an invented map pin. Ohio is the state named in the announcement, not a host property. - Coordinates
- Region only, no map pin
- Electrical capacity
- Not recorded · scope: plant
- Thermal capacity
- Not recorded
- Modules planned
- Not recorded
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Record reviewed
- 5 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes
Standard Power NuScale SMR facility in Ohio (site not disclosed) is recorded at Standard Power Ohio facility (site not disclosed), Ohio, United States. Operator: No operator is recorded. Recorded vendor: NuScale Power. Stage: Announced. Location precision: region only; region only, no map pin.
Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Project proposer or applicant
- Project proposerStandard Power · source
- Reactor supplier
- Vendor named for this project (no design profile is linked)NuScale Power
- Customer or offtaker
Source-backed project statement NuScale's 6 October 2023 release says Standard Power, a provider of infrastructure to data-processing companies, aims to use the energy from its Ohio and Pennsylvania SMR facilities to power nearby data centers. That is the developer's own intended use, not a power purchase agreement, and no data-center operator, quantity or Ohio site is named. NuScale: Standard Power plans SMR-powered facilities in Ohio and Pennsylvania (6 October 2023)
- Contractor
Source-backed project statement NuScale's 6 October 2023 release says Standard Power chose ENTRA1 Energy, an energy development and production company with exclusive rights to develop, own and operate plants using NuScale technology, to support its Ohio and Pennsylvania projects, with NuScale as technology provider. That is a prospective development partnership, not an engineering or construction contract, and no Ohio site is named. NuScale: Standard Power plans SMR-powered facilities in Ohio and Pennsylvania (6 October 2023)
Not found in the sources we checked (3): Funding and government decisions; Fuel; Comparable schedule revision
- Funding and government decisions
NuScale's 6 October 2023 release refers to ENTRA1's strengths in project development and investment but states no investor commitment, amount or financing for the Ohio facility. NuScale: Standard Power plans SMR-powered facilities in Ohio and Pennsylvania (6 October 2023)
- Fuel
- No design profile is linked, so no stated fuel is shown.No project-specific fuel supply arrangement is recorded as a structured fact.
NuScale's 6 October 2023 release describes the NuScale technology and module ratings but names no fuel supplier, fabrication or delivery for the Ohio facility. NuScale: Standard Power plans SMR-powered facilities in Ohio and Pennsylvania (6 October 2023)
- Comparable schedule revision
Comparable schedule revision not established. NuScale's 6 October 2023 release states one plan, Standard Power operational by 2029, for the two facilities. No later source read restates or moves it, so no revision is shown. NuScale: Standard Power plans SMR-powered facilities in Ohio and Pennsylvania (6 October 2023)
Not recorded in SMRMap's reviewed evidence (3): Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
- Operator or intended licensed owner
- Reviewed 20 Oct 2026: not disclosed in the reviewed evidence.
- Site host or owner
- Programs and agreements naming the project
Timeline
Recorded developments
- Announced · Announcement
NuScale announces the Standard Power Ohio facility
This project’s dated entries are in Updates, filtered to this project. New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(7 notes, 1 not yet reviewed)
- Evidence review. NuScale's 6 October 2023 release says Standard Power plans two facilities, one in Ohio and one in Pennsylvania, using NuScale's NRC design-approved SMR technology and ENTRA1 Energy. It says the two facilities together would use 24 modules of 77 MWe, collectively 1,848 MWe, and nearly 2 GW. Those figures cover both facilities. They are not split onto this record and are not stored. No county or host property is named. The page does not name a design version. No specific design profile is linked from this announcement alone. Operation by 2029 is stated as a plan. The NRC wording is design approval of the technology, not a site permit. The participating organizations retain only their source-supported roles; a reactor operator is not assigned from the study, proposer, parent, existing-fleet or proposed-owner relationship. Last checked 20 Oct 2026. NuScale: Standard Power plans SMR-powered facilities in Ohio and Pennsylvania (6 October 2023)
What would change this
A notice that names the host property in this state, or that separates this facility's module count from the other state's facility. Next scheduled check: 20 Jan 2027.
- Site location recorded as disclosed: Not disclosed in the reviewed evidence. The release says the facilities will be located in Ohio and Pennsylvania and names no county or property for Ohio. The stored location is region only, with no pin. Last checked 20 Oct 2026. NuScale: Standard Power plans SMR-powered facilities in Ohio and Pennsylvania (6 October 2023)
What would change this
A siting notice that names a property in Ohio. Next scheduled check: 20 Jan 2027.
- Operator or intended licensed owner: Not disclosed in the reviewed evidence. The reviewed sources establish other participant roles, but do not appoint the recorded party as this reactor’s operator. The operator remains unassigned; this does not assert that no operator exists. Last checked 20 Oct 2026. NuScale: Standard Power plans SMR-powered facilities in Ohio and Pennsylvania (6 October 2023)
What would change this
A project-specific filing, operating agreement or developer statement explicitly names the proposed reactor operator. Next scheduled check: 20 Jan 2027.
- Design identified: Not disclosed in the reviewed evidence. The release describes NuScale SMR technology and 77 MWe modules, but does not name a selected design version. No specific design profile is linked. Last checked 20 Oct 2026. NuScale: Standard Power plans SMR-powered facilities in Ohio and Pennsylvania (6 October 2023)
What would change this
A project-specific announcement or filing identifies the named reactor design version. Next scheduled check: 20 Jan 2027.
- Next decision and prerequisites: Not disclosed in the reviewed evidence. NuScale's October 2023 release says Standard Power plans to be operational by 2029, a target, but it does not name the next step for the Ohio facility, such as a site choice, a contract with ENTRA1 or NuScale, or a license application, or give dates for any such step. The next decision is therefore not disclosed in this source. Last checked 23 Oct 2026. NuScale: Standard Power plans SMR-powered facilities in Ohio and Pennsylvania (6 October 2023)
What would change this
A Standard Power site announcement, definitive contract or NRC filing for the Ohio facility. Next scheduled check: 23 Apr 2027.
- Permissions and public process: Not disclosed in the reviewed evidence. NuScale's 6 October 2023 release announcing Standard Power's two planned SMR facilities in Ohio and Pennsylvania refers only to the NRC's earlier design approval for NuScale technology. It names no site-specific NRC application, state permit or local consultation for the Ohio facility, so no project permission is established in this source. Last checked 23 Oct 2026. NuScale: Standard Power plans SMR-powered facilities in Ohio and Pennsylvania (6 October 2023)
What would change this
An NRC filing or state or local permit application for Standard Power's Ohio SMR facility. Next scheduled check: 23 Apr 2027.
- Site dependencies (land, grid, water): Not disclosed in the reviewed evidence. NuScale's October 2023 release says only that Standard Power's facilities will be located in Ohio and Pennsylvania and will power nearby data centers. It names no county, host property, grid connection or cooling arrangement for the Ohio facility, so its site arrangements are not disclosed in this source. Last checked 23 Oct 2026. NuScale: Standard Power plans SMR-powered facilities in Ohio and Pennsylvania (6 October 2023)
What would change this
A Standard Power or NuScale announcement naming the Ohio site. Next scheduled check: 23 Apr 2027.
Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.
Evidence dates
(0 of 1 source with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(1)
- NuScale: Standard Power plans SMR-powered facilities in Ohio and Pennsylvania (6 October 2023) (company, accessed 2 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: Standard Power NuScale SMR facility in Ohio (site not disclosed) — https://smrmap.com/projects/standard-power-ohio/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “Standard Power NuScale SMR facility in Ohio (site not disclosed)”. Record reviewed 5 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/standard-power-ohio/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.