Policy and licensing / Ohio
Ohio: SMR policy and licensing
Selected federal, state, territory, and national measures whose official text was opened. This is not a complete list of laws, rules, programs or guidance for any jurisdiction. A jurisdiction without a page here is not a finding that it has no policy, and these pages do not rate or prefer any jurisdiction. Nothing here implies that a project is eligible for, or approved under, any measure.
89 projects in United States →
Federal measures apply in Ohio as everywhere in the United States and are listed once on the federal page. They are not counted here.
Where licensing stands
Built only from the records on this page. It is not a complete account of the law and not legal advice.
- Authorities named in recorded applications, reviews and decisions
- None recorded: no application or decision for a tracked project here is recorded.
- Licensing law or framework in the record
- NRC licensing measures are recorded once, on the federal page (9 records).
- Latest recorded step
- Took effect : Ohio power-siting definition of a major utility facility
- Open coverage gaps
- Governor or energy instruments (access blocked). What the review of 5 Oct 2026 read.
Laws, rules and executive directives
- Ohio Revised Code Chapter 4164: Nuclear Development Authority · In effect
Ohio Rev. Code Chapter 4164 (official compilation, sections effective 3 October 2023) · Ohio General Assembly · affects: State program administration
Ohio Revised Code Chapter 4164 creates the Ohio Nuclear Development Authority and states purposes that include advanced-nuclear-research reactors and isotope work. The opened powers do not include licensing a reactor. The text is not limited to small modular reactors. The enrolled House Bill 33 text was opened. An approval line was not isolated.
Not approved or pending: Enrolled Amended Substitute House Bill 33 was opened and lists the chapter 4164 sections. An approval line was not isolated in that text. No appointment, strategic plan, annual report, appropriation or award was opened. Section 3748.03 was not opened. No project is linked. The chapter does not approve a reactor. (Record checked .) - Ohio certificate required before major-utility construction · In effect
Ohio Rev. Code § 4906.04 · Ohio General Assembly · affects: Siting
Ohio requires a power-siting certificate before construction of a major utility facility. The official page dates this duty 15 November 1981. Whether a particular nuclear plant meets the fifty-megawatt definition is a separate question, and this section does not certificate one.
Not approved or pending: A certificate under this section was not opened for any tracked project. The section does not name Elementl Letart or the Pike County proposal. The like-facility exception is the board's determination, not a nuclear exemption. (Record checked .) - Ohio power-siting definition of a major utility facility · In effect
Ohio Rev. Code § 4906.01 · Ohio General Assembly · affects: Siting
Ohio's current power-siting definition treats an electric generating plant of fifty megawatts or more as a major utility facility. The official page dates this section text 14 August 2025. The certificate duty in section 4906.04 has a different effective date and is a separate record.
Not approved or pending: The definition is general generation siting law. It does not name a nuclear technology or certificate any project. House Bill 15 itself was not opened. The Ohio nuclear chapter already published separately is Chapter 4164. (Record checked .)
Bills, proposed rules and consultations
- None recorded.
Funding and support programs
- None recorded.
Regulatory guidance and inspector policies
- None recorded.
Recorded permissions and applications for tracked projects located in Ohio
Listed by project location only, with each action's issuing authority recorded. The jurisdiction measures above do not themselves authorize reactor construction or operation.
- None recorded.
What this review has read for Ohio
As of 5 Oct 2026. Bounded review concluded with access gaps. A published record above is separate from research coverage: a class can be blocked or unreviewed even where records are published. Coverage for every state and territory.
- Statutes, session laws and bills: Evidence read. Revised Code chapter 4164 (Nuclear Development Authority, effective 3 October 2023), enrolled House Bill 33 and sections 4906.01 and 4906.04 were read.
- Governor or energy instruments: Access blocked. The governor's executive-order pages returned a not-found error (HTTP 404) on 4 and 5 October 2026, and a Department of Development page returned a not-found error (HTTP 404).
- Commission or siting instruments: None found in sources checked. Power Siting Board rule 4906-3-01 (certificate application procedure) was read. It sets no nuclear-specific policy. A board fees page returned a not-found error (HTTP 404).
- Funding measures and awards: Evidence read. Revised Code section 4937.05 (effective 17 October 2019) was read: assessments on nuclear utilities for a nuclear safety fund.
Sources read (4):
- codes.ohio.gov/ohio-revised-code/chapter-4164 · checked 4 Oct 2026
- codes.ohio.gov/ohio-revised-code/section-4937.05 · checked 4 Oct 2026
- codes.ohio.gov/ohio-administrative-code/rule-4906-3-01 · checked 4 Oct 2026
- search-prod.lis.state.oh.us/api/v2/general_assembly_135/legislation/hb33/06… · checked 4 Oct 2026
Sources that could not be read (4):
- development.ohio.gov/business/third-frontier-and-technology/innovation-hubs · checked 4 Oct 2026 · a not-found error (HTTP 404)
- opsb.ohio.gov/processes/application-fees-and-billing · checked 4 Oct 2026 · a not-found error (HTTP 404)
- governor.ohio.gov/media/executive-orders/executive-order-2022-02d · checked 4 Oct 2026 · a not-found error (HTTP 404)
- governor.ohio.gov/media/executive-orders · checked 5 Oct 2026 · a not-found error (HTTP 404)