Projects / United States · Announced
Surry Green Energy Center SMR campus proposal
POWER Magazine describes the Surry Green Energy Center as an industrial campus adjacent to Dominion Surry proposing on-site renewables and four to six SMRs for data-center and hydrogen loads.
Current status
- How current
- General record check . Bounded evidence review . 1 of 3 listed sources has a publication or document date recorded here: 13 Feb 2024. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
No dated development is recorded. Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- No actual dated development is recorded.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Electrical output is not recorded.
- Thermal output is not recorded on this project.
- No operator is recorded.
- The mapped point is not an exact surveyed coordinate.
- Expected for this stage but not recorded as a structured fact: Design identified (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions); Developer or proposer; Primary source (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
View on the map · View on the 3D globe · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
Selected design/vendor and independently verified current property/contract status are not established. Kept distinct from Dominion Surry operating units. DCD reported on 13 February 2024 that Surry County supervisors had voted 3-2 on 8 February to rezone the campus site. The developer said the site would eventually host four to six SMRs of up to 250 MW each. DCD said they were not likely to be running for 10 to 15 years. No vendor selection, NRC filing or later SMR step is recorded. Global Energy Monitor lists the plant as shelved, a status it marks as inferred in June 2026.
Key facts
- Design
- Design profile not linked (SMR)
- Technology
- Not recorded on a linked design profile — see the description
- Operator(s)
- Not recorded
- Vendor for linked design
- No selected-design vendor recorded
- Location
- Surry Green Energy Center SMR campus proposal · United States · precision: site area (named plant, laboratory, base, port, campus or parcel)
Approximate coordinates of the named Surry Green Energy Center from the NuclearChain reactors export (CC BY 4.0; derived from GEM's tracker). Distinct from Dominion Surry operating units; adjacent campus identity from POWER Magazine. Exact parcel not verified. Same point as GEM public map layer (August 2026) feature L100000500520 (approx 37.1667, -76.6852); workbook/NOTICE not retrieved. GEM status labels not imported as project disposition. - Coordinates
- 37.1667, -76.6852 · site-area point (approximate)
- Electrical capacity
- Not recorded · scope: plant
- Thermal capacity
- Not recorded
- Modules planned
- Not recorded
- Inclusion basis
- Vendor SMR claim, capacity checked
- Confidence
- medium
- Record reviewed
- 2 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes
Surry Green Energy Center SMR campus proposal is recorded at Surry Green Energy Center SMR campus proposal, Virginia, United States. Operator: No operator is recorded. Recorded vendor: No selected-design vendor is recorded. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).
Coordinate source: NuclearChain reactors.csv export (unit coordinates), NuclearChain reactors.csv row 'surry-green-energy-center-nuclear-power-plant-1' (37.1667, -76.6852)
Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
Not found in the sources we checked (5): Customer or offtaker; Contractor; Funding and government decisions; Fuel; Comparable schedule revision
- Customer or offtaker
POWER Magazine reported on 20 August 2023 that the Surry Green Energy Center's SMRs could supply 20 to 30 data centers and hydrogen production, and that IP3's chief executive planned to sell lots to data center providers. No data center company or other buyer is named. POWER: Hydrogen production and SMRs touted for Virginia data-center hub
- Contractor
POWER Magazine reported on 20 August 2023 that Green Energy Partners and IP3 International formed a joint venture to develop the Surry Green Energy Center. They are the project's developers, not contractors, and the article names no reactor vendor, engineering or construction contractor. Dominion appears only as operator of the neighbouring Surry plant. POWER: Hydrogen production and SMRs touted for Virginia data-center hub
- Funding and government decisions
POWER Magazine reported on 20 August 2023 that the first phase of data centers would create a customer base that could support private investment in the SMRs, and that the venture would access private capital markets. No funder, amount or instrument for the Surry campus is stated. POWER: Hydrogen production and SMRs touted for Virginia data-center hub
- Fuel
- No design profile is linked, so no stated fuel is shown.No project-specific fuel supply arrangement is recorded as a structured fact.
POWER Magazine's 20 August 2023 report says the SMRs' heat would support hydrogen production for backup generators. That is a hydrogen product, not nuclear fuel, and no nuclear fuel supplier is named for the Surry campus. POWER: Hydrogen production and SMRs touted for Virginia data-center hub
- Comparable schedule revision
Comparable schedule revision not established. POWER Magazine's 20 August 2023 report says the SMRs would come in a second phase and that IP3 expected nuclear power within a decade, a single horizon. Global Energy Monitor lists the plant as shelved, inferred in June 2026, which is a status label, not a revised date. No earlier and later dates for the same milestone appear. POWER: Hydrogen production and SMRs touted for Virginia data-center hub; GEM Global Nuclear Power Tracker public map ? Surry Green Energy Center
Not recorded in SMRMap's reviewed evidence (5): Project proposer or applicant; Operator or intended licensed owner; Reactor supplier; Site host or owner; Programs and agreements naming the project
- Project proposer or applicant
- Operator or intended licensed owner
- Reactor supplier
- Site host or owner
- Programs and agreements naming the project
Timeline
This timeline has no entries yet. Other dated information may appear in the description and checking notes.
New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(7 notes, 1 not yet reviewed)
- Evidence review. POWER Magazine describes the Surry Green Energy Center as a park on 641 acres adjacent to Dominion's Surry plant, and says officials spoke of four to six SMRs of about 250 MW each, with the exact capacity depending on the technology. That is a range, not a committed count or rating, and this record has no count field. Global Energy Monitor calls the same plant shelved, with the status marked inferred in June 2026, and lists 250 MW units. That inferred label is not used to change the announced stage. No selected vendor is named. Dominion is the neighbouring operating plant, not the developer of this proposal. Last checked 20 Oct 2026. POWER: Hydrogen production and SMRs touted for Virginia data-center hub; GEM Global Nuclear Power Tracker public map ? Surry Green Energy Center
What would change this
A Green Energy Partners or IP3 filing, or a Dominion land record, that states the technology and whether the Surry proposal is still being pursued. Next scheduled check: 20 Jan 2027.
- Design identified: Not disclosed in the reviewed evidence. The magazine says four to six SMRs of about 250 MW each, and that the capacity would depend on the type of nuclear technology. No vendor or design is selected. GEM's 250 MW rows are not stored. Last checked 20 Oct 2026. POWER: Hydrogen production and SMRs touted for Virginia data-center hub
What would change this
A vendor selection for the Surry Green Energy Center. Next scheduled check: 20 Jan 2027.
- Developer or proposer. The magazine names Green Energy Partners and IP3 International as the parties that announced the park. These source-named participants do not yet have linked organization profiles. Dominion is identified only as the operator of the adjacent Surry plant and is not stored as this project's developer. Last checked 20 Oct 2026. POWER: Hydrogen production and SMRs touted for Virginia data-center hub
What would change this
An organization record for Green Energy Partners or IP3 tied to this park. Next scheduled check: 20 Jan 2027.
- Primary source: Not disclosed in the reviewed evidence. The two saved sources are a POWER Magazine article and a Global Energy Monitor page that marks its shelved status as inferred. No company release, regulator filing, or property record is in these captures. Last checked 20 Oct 2026. POWER: Hydrogen production and SMRs touted for Virginia data-center hub; GEM Global Nuclear Power Tracker public map ? Surry Green Energy Center
What would change this
A company or regulator document for the Surry Green Energy Center. Next scheduled check: 20 Jan 2027.
- Next decision and prerequisites. POWER magazine reports that the developers plan to build a data-center park first, powered from the local utility, and to deploy SMRs only in a second phase once that customer base can support private investment; no SMR design had been chosen. The next step is therefore the first-phase data-center park, not a nuclear decision, and the article gives no dates for either phase. Last checked 23 Oct 2026. POWER: Hydrogen production and SMRs touted for Virginia data-center hub
What would change this
Sale of first-phase data-center lots or a design selection for the SMR phase. Next scheduled check: 23 Apr 2027.
- Permissions and public process: Not disclosed in the reviewed evidence. POWER magazine's report on the Surry Green Energy Center quotes IP3's chief executive as saying the NRC would need to approve the SMR technology and that the site could run on nuclear power within a decade. The report describes no NRC application, county zoning decision or public consultation for SMRs at the campus. Last checked 23 Oct 2026. POWER: Hydrogen production and SMRs touted for Virginia data-center hub
What would change this
An NRC filing, or a Surry County land-use decision, for SMRs at the Surry Green Energy Center. Next scheduled check: 23 Apr 2027.
- Site dependencies (land, grid, water). POWER magazine reports that Green Energy Partners and IP3 announced a data-center hub on 641 acres adjacent to Dominion's Surry nuclear plant, with four to six SMRs of about 250 MW each in a second phase, and that the site along the James River would suit hydrogen shipping. The article does not establish who holds the land, a grid connection or cooling arrangements for the SMRs. Last checked 23 Oct 2026. POWER: Hydrogen production and SMRs touted for Virginia data-center hub
What would change this
A land, zoning or interconnection record for the Surry Green Energy Center's SMR phase. Next scheduled check: 23 Apr 2027.
Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.
Evidence dates
(1 of 3 sources with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(3)
- POWER: Hydrogen production and SMRs touted for Virginia data-center hub (news report, accessed 2 Oct 2026)
- GEM Global Nuclear Power Tracker public map ? Surry Green Energy Center (directory or tracker, accessed 2 Oct 2026)
- DCD: Nuclear-powered data center campus in Surry, Virginia, gets rezoning approval (13 February 2024) (news report, published 13 Feb 2024, accessed 28 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: Surry Green Energy Center SMR campus proposal — https://smrmap.com/projects/surry-gec/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “Surry Green Energy Center SMR campus proposal”. Record reviewed 2 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/surry-gec/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.