Projects / United States · Announced
USNC MMR Idaho National Laboratory demonstration proposal (2020 ARDP)
Ultra Safe Nuclear Corporation proposed deploying its Micro Modular Reactor at Idaho National Laboratory, according to a World Nuclear News report of 13 Oct 2020.
Current status
- How current
- General record check . Bounded evidence review . The listed source has no publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
No dated development is recorded. Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- No actual dated development is recorded.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Electrical output is not recorded.
- Thermal output is not recorded on this project.
- No operator is recorded.
- The mapped point is not an exact surveyed coordinate.
- Expected for this stage but not recorded as a structured fact: Design identified (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions); Primary source (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
View on the map · View on the 3D globe · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
The report placed the proposal under the DOE Advanced Reactor Demonstration Program. A USNC-specific award/site agreement and successor disposition are not established. Distinct from Oklo Aurora-INL, Project Pele, UAMPS CFPP, and UIUC KRONOS. Proposal is not treated as reactor construction.
Key facts
- Design
- Design profile not linked (Microreactor)
- Technology
- Not recorded on a linked design profile — see the description
- Operator(s)
- Not recorded
- Vendor for linked design
- No selected-design vendor recorded
- Location
- USNC MMR Idaho National Laboratory demonstration proposal (site agreement undisclosed) · United States · precision: town or locality only
USNC never published a pad and the site agreement is undisclosed. The pin is the recorded OpenStreetMap point for Idaho National Laboratory at its Central Facilities Area (43.5306324, −112.94046): a laboratory-wide point, not a project site. - Coordinates
- 43.5306324, -112.94046 · town-level point (approximate)
- Electrical capacity
- Not recorded · scope: plant
- Thermal capacity
- Not recorded
- Modules planned
- Not recorded
- Inclusion basis
- Labeled microreactor
- Confidence
- medium
- Record reviewed
- 2 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes
USNC MMR Idaho National Laboratory demonstration proposal (2020 ARDP) is recorded at USNC MMR Idaho National Laboratory demonstration proposal (site agreement undisclosed), Idaho, United States. Operator: No operator is recorded. Recorded vendor: No selected-design vendor is recorded. Stage: Announced. Location precision: town or locality only; town-level point (approximate).
Coordinate source: OpenStreetMap Nominatim geocoder, OpenStreetMap Nominatim result: 'Idaho National Laboratory, East Ogden Avenue, Central Facilities Area' (amenity=research_institute), 43.5306324, −112.94046
Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Project proposer or applicant
- Project proposerUltra Safe Nuclear Corporation · source
Not found in the sources we checked (5): Customer or offtaker; Contractor; Funding and government decisions; Fuel; Comparable schedule revision
- Customer or offtaker
World Nuclear News of 13 October 2020 says the proposed MMR Energy System at Idaho National Laboratory would demonstrate integrated energy systems with renewables, but names no user or buyer of its heat or power. The campus heating and power use described in the same article belongs to the separate University of Illinois proposal. WNN: USNC MMR proposed for Idaho and Illinois
- Contractor
World Nuclear News of 13 October 2020 says Ultra Safe Nuclear Corporation, the proposer, planned to deploy its MMR at Idaho through a partnership with Idaho National Laboratory, the host site, under DOE's Advanced Reactor Demonstration Program. No engineering or construction contractor is named, and the Ontario Power Generation joint venture in the article concerns Chalk River. WNN: USNC MMR proposed for Idaho and Illinois
- Funding and government decisions
World Nuclear News of 13 October 2020 says the USNC proposals were part of DOE's Advanced Reactor Demonstration Program, which offered US$160 million of initial funding for two demonstration reactors, but it does not say the Idaho MMR received an award or share. USNC's reference to private investment is company strategy, not an Idaho amount. WNN: USNC MMR proposed for Idaho and Illinois
- Fuel
- No design profile is linked, so no stated fuel is shown.No project-specific fuel supply arrangement is recorded as a structured fact.
World Nuclear News of 13 October 2020 says the MMR uses USNC's proprietary FCM TRISO fuel, which is the design's fuel. No fabrication, allocation or delivery for the Idaho demonstration is stated. WNN: USNC MMR proposed for Idaho and Illinois
- Comparable schedule revision
Comparable schedule revision not established. World Nuclear News of 13 October 2020 gives one target, deployment at Idaho and Illinois by 2026, and no later source read restates it. The program's five-to-seven-year horizon and USNC's 2026 manufacturing remark are different scopes, so no revision is shown. WNN: USNC MMR proposed for Idaho and Illinois
Not recorded in SMRMap's reviewed evidence (4): Operator or intended licensed owner; Reactor supplier; Site host or owner; Programs and agreements naming the project
- Operator or intended licensed owner
- Reactor supplier
- Site host or owner
- Programs and agreements naming the project
Timeline
This timeline has no entries yet. Other dated information may appear in the description and checking notes.
New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(7 notes, 1 not yet reviewed)
- Evidence review. World Nuclear News reported on 13 October 2020 that Ultra Safe Nuclear Corporation was proposing to deploy its Micro Modular Reactor at Idaho National Laboratory and at the University of Illinois by 2026 under the Advanced Reactor Demonstration Program. The Idaho sentence describes a proposed MMR Energy System for integrated energy demonstrations. The article gives 15 or 30 MW thermal as the reactor's generating figures, which is an either-or design statement and is not stored. The Illinois campus project and the Chalk River joint venture are different projects. No award, site agreement, or license is stated. Last checked 20 Oct 2026. WNN: USNC MMR proposed for Idaho and Illinois
What would change this
A USNC or DOE instrument that awards this Idaho proposal or names its pad and selected output. Next scheduled check: 20 Jan 2027.
- Design identified: Not disclosed in the reviewed evidence. The article names the MMR Energy System and says it generates 15 or 30 MW thermal. That either-or figure is not a selected rating, and the stored design stays empty. Last checked 20 Oct 2026. WNN: USNC MMR proposed for Idaho and Illinois
What would change this
A project document that selects one MMR configuration for the Idaho proposal. Next scheduled check: 20 Jan 2027.
- Developer or proposer. The article says Ultra Safe Nuclear Corporation is proposing the Idaho deployment. The existing organization record is used as project proposer. No operator is named. Last checked 20 Oct 2026. WNN: USNC MMR proposed for Idaho and Illinois
What would change this
A filing that names the licensed applicant for the Idaho proposal. Next scheduled check: 20 Jan 2027.
- Primary source: Not disclosed in the reviewed evidence. The only opened text is a World Nuclear News report. It is not a USNC filing or a Department of Energy award instrument for this site. Last checked 20 Oct 2026. WNN: USNC MMR proposed for Idaho and Illinois
What would change this
The USNC proposal or the DOE selection document for the Idaho site. Next scheduled check: 20 Jan 2027.
- Next decision and prerequisites: Not disclosed in the reviewed evidence. World Nuclear News reported in October 2020 that USNC proposed deploying MMRs in Idaho and Illinois by 2026 under DOE's demonstration program; for Idaho, that date has passed. The report sets no decision point or award for the INL unit, and no later decision on it is recorded in the source reviewed for this project. Last checked 23 Oct 2026. WNN: USNC MMR proposed for Idaho and Illinois
What would change this
A record of a DOE award, site agreement or termination for the USNC INL proposal. Next scheduled check: 23 Apr 2027.
- Permissions and public process: Not disclosed in the reviewed evidence. World Nuclear News reported on 13 October 2020 that USNC's Idaho proposal was part of its bid under DOE's Advanced Reactor Demonstration Program and that licensing work with Canada's regulator would be shared with the NRC. The report names no NRC application, DOE authorization or public process for an MMR at Idaho National Laboratory. Last checked 23 Oct 2026. WNN: USNC MMR proposed for Idaho and Illinois
What would change this
A record of an NRC or DOE filing for a USNC MMR at INL. Next scheduled check: 23 Apr 2027.
- Site dependencies (land, grid, water). World Nuclear News reported in October 2020 that USNC proposed an MMR Energy System at Idaho National Laboratory, through a partnership with the laboratory, to demonstrate integrated energy systems with renewables. The report names INL as host but gives no specific location, site agreement or utility arrangement. Last checked 23 Oct 2026. WNN: USNC MMR proposed for Idaho and Illinois
What would change this
A record of a site agreement between USNC and INL. Next scheduled check: 23 Apr 2027.
Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.
Evidence dates
(0 of 1 source with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(1)
- WNN: USNC MMR proposed for Idaho and Illinois (news report, accessed 2 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: USNC MMR Idaho National Laboratory demonstration proposal (2020 ARDP) — https://smrmap.com/projects/usnc-inl-mmr-proposal/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “USNC MMR Idaho National Laboratory demonstration proposal (2020 ARDP)”. Record reviewed 2 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/usnc-inl-mmr-proposal/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.