Projects / Kazakhstan · Suspended
VBER-300 nuclear plant project near Aktau, Mangystau (2006)
A VBER-300 nuclear plant near Aktau, Kazakhstan, is a historical proposal, recorded as suspended.
Current status
- How current
- General record check . Bounded evidence review . The listed source has no publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
No dated development is recorded. Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- No actual dated development is recorded.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Electrical output is not recorded.
- Thermal output is not recorded on this project.
- No operator is recorded.
- No map pin is shown for this record.
- Expected for this stage but not recorded as a structured fact: Developer or proposer (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
- Reactor type
- Pressurized water reactor. How it works, with a 3D view.
View on the map · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
In 2006 the Kazakh-Russian joint company Atomnye Stantsii was formed to build a nuclear plant near Aktau. Its feasibility study for a plant with VBER-300 reactors in Mangystau region passed the required approvals, including the state environmental review; work was then suspended pending an intergovernmental agreement on joint design and construction. That account names no reactor vendor. Afrikantov OKBM remains the designer on the linked VBER-300 profile and is not stored as the vendor of this plant. Unit count and output are not stored. Kurchatov was later named only as a suitable area.
Key facts
- Design
- VBER-300 (SMR)
- Technology
- Pressurized water reactor (PWR) · light water. The 2024 SMR Technology Catalogue labels the VBER-300 an integral PWR, while its description and the IAEA's 2020 SMR booklet describe steam-generator and pump vessels and a primary loop connected directly to the reactor vessel; with these conflicting descriptions, the type is recorded as a pressurized water reactor without an integral claim.
- Reactor vessel of this design
- 9.3 m tall, 3.9 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 171.overall height diameter basis not stated verified against section 25: overall height 9.3 m and diameter 3.9 mSMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
All vessels to scale - Operator(s)
- Not recorded
- Vendor for linked design
- —
- Design origin
- Russia: where the design's vendor is recorded, not where parts are made · See designs from this origin on a 3D globe
- Location
- Aktau area, Mangystau region · Kazakhstan · precision: town or locality only
The sources name this place but publish no coordinate for it, so no pin is shown. - Coordinates
- Town named, no map pin
- Electrical capacity
- Not recorded · scope: plant
- Thermal capacity
- Not recorded
- Modules planned
- Not recorded. The study title uses the plural reactor units and gives no number.
- Inclusion basis
- Earlier-plan record (historical SMR program)
- Confidence
- medium
- Record reviewed
- 19 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes
VBER-300 nuclear plant project near Aktau, Mangystau (2006) is recorded at Aktau area, Mangystau region, Mangystau, Kazakhstan. Operator: No operator is recorded. Recorded vendor: No vendor is recorded. Stage: Suspended. Location precision: town or locality only; town named, no map pin.
Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Fuel
- Fuel form stated for VBER-300 (catalog profile as of 18 Oct 2024)UO2
The National Scientific Portal of Kazakhstan says the Kazakh-Russian joint company Atomnye Stantsii was formed in 2006 to build a plant near Aktau and prepared a feasibility study for VBER-300 reactors in Mangystau region that passed the required approvals, before work was suspended pending an intergovernmental agreement with Russia. It names no fuel supplier or delivery for the Aktau plant. National Scientific Portal of Kazakhstan: history of nuclear plant plans
Not found in the sources we checked (4): Customer or offtaker; Contractor; Funding and government decisions; Comparable schedule revision
- Customer or offtaker
The National Scientific Portal of Kazakhstan says the Kazakh-Russian joint company Atomnye Stantsii was formed in 2006 to build a plant near Aktau and prepared a feasibility study for VBER-300 reactors in Mangystau region that passed the required approvals, before work was suspended pending an intergovernmental agreement with Russia. It names no buyer of the plant's power or heat. National Scientific Portal of Kazakhstan: history of nuclear plant plans
- Contractor
The National Scientific Portal of Kazakhstan says the Kazakh-Russian joint company Atomnye Stantsii was formed in 2006 to build a plant near Aktau and prepared a feasibility study for VBER-300 reactors in Mangystau region that passed the required approvals, before work was suspended pending an intergovernmental agreement with Russia. The joint company prepared the study itself, and no engineering or construction contractor is named. National Scientific Portal of Kazakhstan: history of nuclear plant plans
- Funding and government decisions
The National Scientific Portal of Kazakhstan says the Kazakh-Russian joint company Atomnye Stantsii was formed in 2006 to build a plant near Aktau and prepared a feasibility study for VBER-300 reactors in Mangystau region that passed the required approvals, before work was suspended pending an intergovernmental agreement with Russia. It states no amount, funder or financing for the Aktau plant. National Scientific Portal of Kazakhstan: history of nuclear plant plans
- Comparable schedule revision
Comparable schedule revision not established. The National Scientific Portal of Kazakhstan says the Kazakh-Russian joint company Atomnye Stantsii was formed in 2006 to build a plant near Aktau and prepared a feasibility study for VBER-300 reactors in Mangystau region that passed the required approvals, before work was suspended pending an intergovernmental agreement with Russia. It gives no construction or operation date, so no schedule revision is shown. National Scientific Portal of Kazakhstan: history of nuclear plant plans
Not recorded in SMRMap's reviewed evidence (5): Project proposer or applicant; Operator or intended licensed owner; Reactor supplier; Site host or owner; Programs and agreements naming the project
- Project proposer or applicant
- Reviewed 19 Oct 2026: not disclosed in the reviewed evidence.
- Operator or intended licensed owner
- Reactor supplier
- Site host or owner
- Programs and agreements naming the project
Timeline
This timeline has no entries yet. Other dated information may appear in the description and checking notes.
New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(8 notes, 1 not yet reviewed)
- Evidence review. The national scientific portal supports the 2006 company, the approved VBER-300 feasibility study, and the later suspension pending an intergovernmental agreement. It does not name OKBM, a unit count, or an output. A 1997 Ulken VVER-640 study and a later 600 to 1,000 MW recommendation on the same page are different propositions and are not stored here. Last checked 20 Oct 2026. National Scientific Portal of Kazakhstan: history of nuclear plant plans
What would change this
An intergovernmental agreement, or a notice that restarts or closes the Aktau VBER-300 project. Next scheduled check: 20 Jan 2027.
- Developer or proposer: Not disclosed in the reviewed evidence. The account names Atomnye Stantsii as the company formed to build the plant. That company is not an organization record here. The design profile's designer is not the plant vendor. Last checked 19 Oct 2026. National Scientific Portal of Kazakhstan: history of nuclear plant plans
What would change this
A company or state document that identifies the plant vendor or a successor to Atomnye Stantsii. Next scheduled check: 19 Jan 2027.
- Plant capacity (scope qualified): Not disclosed in the reviewed evidence. The feasibility-study title names VBER-300 reactor units and states no plant output. Last checked 19 Oct 2026. National Scientific Portal of Kazakhstan: history of nuclear plant plans
What would change this
A feasibility study or agreement that states the plant output and unit count. Next scheduled check: 19 Jan 2027.
- Module/unit count: Not disclosed in the reviewed evidence. The study title uses the plural reactor units and gives no number. No count is stored. Last checked 19 Oct 2026. National Scientific Portal of Kazakhstan: history of nuclear plant plans
What would change this
A document that states how many VBER-300 units the Aktau plant comprised. Next scheduled check: 19 Jan 2027.
- Site location recorded as disclosed: Not disclosed in the reviewed evidence. The account names the Aktau area in Mangystau and gives no coordinates. The stored location names only the Aktau area. Last checked 19 Oct 2026. National Scientific Portal of Kazakhstan: history of nuclear plant plans
What would change this
A siting decision with a location inside Mangystau. Next scheduled check: 19 Jan 2027.
- Next decision and prerequisites. The National Scientific Portal says work on the Aktau VBER-300 project was suspended because an intergovernmental agreement with Russia on joint design and construction was needed. It then says later national studies concluded that 600-1,000 MW light-water units were appropriate for a future plant, so a resumed VBER-300 project at Aktau would first require that agreement. No later decision on this project is recorded. Last checked 23 Oct 2026. National Scientific Portal of Kazakhstan: history of nuclear plant plans
What would change this
An intergovernmental agreement on the VBER-300 plant, or a statement formally closing the Aktau project. Next scheduled check: 23 Apr 2027.
- Permissions and public process. Kazakhstan's National Scientific Portal says the feasibility study prepared by the Kazakh-Russian company Atomnye Stantsii for a VBER-300 plant in Mangystau region passed the approvals and conclusions required by law, including the state environmental review. That is approval of a feasibility study and its environmental review, not a construction license, and the source describes no later licensing step. Last checked 23 Oct 2026. National Scientific Portal of Kazakhstan: history of nuclear plant plans
What would change this
A record of a siting or construction license application for a VBER-300 plant near Aktau. Next scheduled check: 23 Apr 2027.
- Site dependencies (land, grid, water). The National Scientific Portal says the joint company was created in 2006 to build a nuclear plant in the area of the city of Aktau, with a feasibility study for VBER-300 units in Mangystau region. It names no specific plot, grid connection or cooling-water source for the plant. Last checked 23 Oct 2026. National Scientific Portal of Kazakhstan: history of nuclear plant plans
What would change this
A document naming the plant site near Aktau or its grid and cooling arrangements. Next scheduled check: 23 Apr 2027.
Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.
Evidence dates
(0 of 1 source with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(1)
- National Scientific Portal of Kazakhstan: history of nuclear plant plans (government, accessed 3 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: VBER-300 nuclear plant project near Aktau, Mangystau (2006) — https://smrmap.com/projects/vber300-aktau/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “VBER-300 nuclear plant project near Aktau, Mangystau (2006)”. Record reviewed 19 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/vber300-aktau/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.