Shearwater NuScale Wylfa feasibility proposal (2021)
Documented 2021 Shearwater feasibility proposal for twelve 77-MW NuScale modules at Wylfa Magnox, distinct from Rolls-Royce Wylfa.
Current status
- How current
- General record check . Bounded evidence review . 1 of 2 listed sources has a publication or document date recorded here: 23 Sep 2021. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
No dated development is recorded. Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- No actual dated development is recorded.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Thermal output is not recorded on this project.
- The mapped point is not an exact surveyed coordinate.
- Same design
- 4 tracked: 1 licensing, 1 announced. Separately: 1 canceled, 1 earlier-plan record. 96 tracked at announced across all designs. Recorded stages, not proof of current activity.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
- Reactor type
- Integral pressurized water reactor. How it works, with a 3D view.
View on the map · View on the 3D globe · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
Current disposition after 2021 is not established; catalog cancellation was not imported.
Key facts
- Design
- NuScale VOYGR (US460 / NPM) (SMR)
- Technology
- Integral pressurized water reactor (iPWR) · light water
- Operator(s)
- Shearwater Energy
- Vendor for linked design
- NuScale Power
- Design origin
- United States: where the design's vendor is recorded, not where parts are made · See designs from this origin on a 3D globe
- Location
- Wylfa Magnox — Shearwater NuScale feasibility proposal · United Kingdom · precision: site area (named plant, laboratory, base, port, campus or parcel)
NuclearChain export station point (derived from GEM's tracker) for the retired Wylfa Magnox station, the named host; used as a plant-area pin because the NuScale module layout was never fixed. Near, but distinct from, the Rolls-Royce Wylfa Newydd site pin. - Coordinates
- 53.4161, -4.4808 · site-area point (approximate)
- Electrical capacity
- 924 MWe (gross/net unspecified) · scope: plant
- Thermal capacity
- Not recorded
- Inclusion basis
- Earlier-plan record (historical SMR program)
- Confidence
- medium
- Record reviewed
- 2 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes
Shearwater NuScale Wylfa feasibility proposal (2021) is recorded at Wylfa Magnox — Shearwater NuScale feasibility proposal, Wales, United Kingdom. Operator: Shearwater Energy. Recorded vendor: NuScale Power. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).
Coordinate source: NuclearChain reactors.csv export (unit coordinates), NuclearChain reactors.csv row 'wylfa-nuclear-power-plant-1' (53.4161, -4.4808)
Recorded electrical output is 924 MWe (gross/net unspecified), scope plant. Modules planned: 12. Thermal output is not recorded on this project. The linked design record states 250 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project. The linked design record states 77 MWe (gross); the project figure is kept separate.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Operator or intended licensed owner
- OperatorShearwater Energy
- Reactor supplier
- Vendor for the linked designNuScale Power
- Contractor
Source-backed project statement On 23 September 2021, UK Parliament oral evidence says Shearwater teamed with NuScale to study small reactors at the Wylfa Magnox site, and Forster said the feasibility study was pretty much complete apart from the financial piece and construction duration. That is preparatory study work, not a construction or engineering award. The ten BWRX-300 units he described are a separate proposal for the Wylfa Newydd site. Welsh Affairs Committee oral evidence: One-off session on Wylfa Newydd, HC 622
Not found in the sources we checked (4): Customer or offtaker; Funding and government decisions; Fuel; Comparable schedule revision
- Customer or offtaker
On 23 September 2021, UK Parliament oral evidence says NuScale was looking at twelve 77-megawatt reactors on the Wylfa Magnox site and that the Magnox program under study would produce almost 1 gigawatt. Forster said this particular development at Wylfa would look to decarbonise the north Wales and north-western grid by about 2035. The hearing names no offtaker, heat user, or research customer and states no purchase terms. An informal price channel and pension-fund interest are not a customer. Welsh Affairs Committee oral evidence: One-off session on Wylfa Newydd, HC 622
- Funding and government decisions
On 23 September 2021, UK Parliament oral evidence records Shearwater calling development finance a problem and saying pension funds were keen to invest in small modular reactors, while a BEIS director said the Shearwater talks were exploratory and there was not a defined budget at that stage. Those statements do not identify money paid or a signed amount for the Magnox proposal. A regulated-asset-base remark covering a first reactor, or the first three, and then the remaining seven follows his ten-unit Newydd count and is not treated as Magnox funding. Welsh Affairs Committee oral evidence: One-off session on Wylfa Newydd, HC 622
- Fuel
- No fuel form or enrichment is recorded on the linked design profile.No project-specific fuel supply arrangement is recorded as a structured fact.
On 23 September 2021, UK Parliament oral evidence describes a feasibility study of twelve 77-megawatt reactors at Wylfa Magnox and does not name a fuel supplier, fabrication order, delivery, or loading for that proposal. Comments elsewhere in the session about other fuel plants belong to other witnesses and other projects. No supply commitment for this proposal is stated. Welsh Affairs Committee oral evidence: One-off session on Wylfa Newydd, HC 622
- Comparable schedule revision
Comparable schedule revision not established. On 23 September 2021, UK Parliament oral evidence gives one Shearwater timescale: first ground-breaking in 2025, first nuclear concrete in late 2026 or early 2027, first power in 2028, and a final reactor about 2035-36. That is one sequence of different milestones, not two dated forecasts of the same milestone, and the answer is not labeled as the twelve-module unit alone. A delay Forster attributed to NuScale's first-of-a-kind project in North America is a different project. The hope for Magnox costs and a construction program in 2021 is a study output, not a second operation date. Welsh Affairs Committee oral evidence: One-off session on Wylfa Newydd, HC 622
Not recorded in SMRMap's reviewed evidence (3): Project proposer or applicant; Site host or owner; Programs and agreements naming the project
- Project proposer or applicant
- No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
- Site host or owner
- Programs and agreements naming the project
Timeline
This timeline has no entries yet. Other dated information may appear in the description and checking notes.
New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Assessments of the design (not of this site)
(1)
- NRC standard design approval for the NuScale US460 — applies to the design, not to a site
Design assessment · Issued / approved · NRC · decided 29 May 2025 · ADAMS ML25129A004, ML25086A073 · 90 FR 23716
The NRC issued a standard design approval to NuScale Power for the US460 small modular reactor design on 29 May 2025, completing its staff technical review. NuScale submitted the application in stages: the first part by letter dated 23 November 2022 and the remaining portions in stages between 29 November and 31 December 2022. The NRC notified NuScale by letter dated 31 July 2023 that the application was acceptable for docketing. The approval lets an applicant reference the design in a construction permit, operating license, combined license or manufacturing license application. It is a design approval only: it grants no permission for any site, construction or operation.
Sources: Federal Register 90 FR 23716 (4 Jun 2025): NuScale US460 standard design approval; Federal Register FR Doc. 2023-05457 (17 Mar 2023): NuScale US460 standard design approval application received; Federal Register FR Doc. 2023-16679 (4 Aug 2023): NuScale US460 standard design approval application accepted for docketing
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(4 notes, 1 not yet reviewed)
- Evidence review. The only attached source is the UK Parliament oral-evidence page, and the saved capture is an access challenge rather than the hearing text. Ledger status 403. The page was not retried. The stored twelve-module feasibility figures are neither confirmed nor revised from this capture. Last checked 20 Oct 2026. UK Parliament oral evidence: Shearwater NuScale Wylfa feasibility (2021)
What would change this
A readable copy of the 2021 Shearwater oral evidence, or a later decision on that feasibility proposal. Next scheduled check: 20 Jan 2027.
- Next decision and prerequisites. On 23 September 2021, UK Parliament oral evidence says the Magnox feasibility study still needed its financial piece and construction duration, with a hope of definite costs and a construction program that year. Forster said NuScale, GE Hitachi, the Government, and pension funds still had to take a collective decision. A BEIS director described the Shearwater discussions as exploratory and said there was not a defined budget at that stage. No dated statutory decision on the Magnox proposal is named. Last checked 23 Oct 2026. Welsh Affairs Committee oral evidence: One-off session on Wylfa Newydd, HC 622
What would change this
A government or company decision that says whether the Magnox feasibility study proceeded. Next scheduled check: 21 Jan 2027.
- Permissions and public process. On 23 September 2021, the Welsh Affairs Committee heard Shearwater on Wylfa, and Forster said planning work had not progressed as much as they would like. He described discussions with Anglesey councils and some members of the Welsh Parliament, plus a reply from the Welsh Government without direct communication. A BEIS director called the Shearwater conversations exploratory. No application, license, consent, or completed inquiry for the Magnox proposal is stated. Last checked 23 Oct 2026. Welsh Affairs Committee oral evidence: One-off session on Wylfa Newydd, HC 622
What would change this
A filed application or a decision on a license or consent for the Magnox proposal. Next scheduled check: 21 Jan 2027.
- Site dependencies (land, grid, water): Not disclosed in the reviewed evidence. On 23 September 2021, UK Parliament oral evidence identifies the decommissioning Wylfa Magnox site as the NuScale study location and does not state a land right, grid connection, or cooling-water arrangement for that study. Forster said getting land from Hitachi would be done with great difficulty, then described ten BWRX-300 reactors on part of the Wylfa Newydd site. He also described Wylfa Newydd transmission capacity as something a coastal link to Deeside could overcome, which is not a secured Magnox connection. Last checked 23 Oct 2026. Welsh Affairs Committee oral evidence: One-off session on Wylfa Newydd, HC 622
What would change this
A land, grid, or water instrument for the Magnox site. Next scheduled check: 21 Jan 2027.
Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.
Evidence dates
(1 of 2 sources with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(2)
- UK Parliament oral evidence: Shearwater NuScale Wylfa feasibility (2021) (government, accessed 2 Oct 2026)
- Welsh Affairs Committee oral evidence: One-off session on Wylfa Newydd, HC 622 (government, published 23 Sep 2021, accessed 23 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: Shearwater NuScale Wylfa feasibility proposal (2021) — https://smrmap.com/projects/wylfa-nuscale-shearwater/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “Shearwater NuScale Wylfa feasibility proposal (2021)”. Record reviewed 2 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/wylfa-nuscale-shearwater/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.