Operating SMR projects

6 tracked projects and proposals in this directory. Named proposals, demonstrations and achieved deployments retain their recorded stages.

Reactor operation is documented, including heat-only or experimental operation where specified.

The recorded stage is separate from permission and does not guarantee current activity. Read each project’s dated evidence.

Of these, 2 power-plant projects and 4 research or test reactor projects (how purpose is assigned). Output, construction start and next target for each.

China: 3 · Japan: 1 · Russia: 1 · United States: 1

Open these projects in Projects (on the map) · Coverage and stage definitions · Dated developments for all projects (Updates)

Counts describe the selected dataset, not a complete national or worldwide census. Sources and check dates are linked from each record.

Projects

Showing 6 of 6 projects

Project and categoryCountryDesignCapacityRecorded organizationsLocationRecord reviewed
Akademik Lomonosov floating NPPSMRRussiaKLT-40S70 MWe (gross) · plant · 300 MWth (nameplate; basis unspecified)Pevek floating NPP berthChukotka · site-area point (approximate)18 Oct 2026Latest source 19 Aug 2026Latest event 22 May 2020
HTR-10 high-temperature gas-cooled test reactor, Tsinghua INETSMRChinaHTR-102 MWe (gross/net unspecified) · plant · 10 MWth (nameplate; basis unspecified)INET, Tsinghua University (Changping)Beijing · site-area point (approximate)18 Oct 2026Latest source, document dated 7 Apr 2024Latest event Oct 2004
HTR-PM Shidaowan demonstrationSMRChinaHTR-PM210 MWe (gross) · plant · 500 MWth (nameplate; basis unspecified)Shidaowan / Shidao BayShandong · site-area point (approximate)19 Oct 2026Latest source, document dated 20 Aug 2021Latest event 6 Dec 2023
HTTR test reactor with planned hydrogen coupling, OaraiSMRJapanHTTR30 MWth (thermal only; nameplate; basis unspecified)JAEA Oarai Nuclear Engineering InstituteIbaraki · site-area point (approximate)18 Oct 2026Latest source 27 Mar 2025Latest event 26 Sep 2025
TMSR-LF1 thorium molten-salt experimental reactor, WuweiSMRChinaTMSR-LF1 experimental molten-salt reactor2 MWth (thermal only; nameplate; basis unspecified)Hongshagang industrial cluster, Minqin countyGansu · site-area point (approximate)18 Oct 2026Latest source 13 Jan 2026Latest event 1 Nov 2025
Valar Atomics Ward 250MicroreactorUnited StatesWard 250MWe not recorded · module · 250 kWth (nameplate; basis unspecified)Utah San Rafael Energy LabUtah · site-area point (approximate)18 Oct 2026Latest source 19 Jun 2026Latest event 2 Jul 2026

Research coverage for the 6 matching projects: of 54 answers to nine review questions, 41 have a supported statement, 13 were reviewed with a stated limit and 0 are not reviewed yet. This counts recorded research, not readiness or the likelihood of construction.

Coverage by question

Each project is asked the same nine questions: five commercial questions and four reader questions. Only completed source reviews are counted. A supported statement can describe a conditional plan or preparatory work; read it on the project page. Not disclosed, not applicable, conflicting evidence and source unavailable are reviewed limits. Not reviewed is unfinished research, not a finding that nothing exists. The counts cover every page of matching projects, not only the page shown or the projects chosen for comparison.

QuestionSupported statementNot disclosedNot applicableConflicting evidenceSource unavailableNot reviewedProjects
Customer or offtaker2400006
Contractor4200006
Funding4200006
Project fuel commitment5100006
Comparable schedule revision2400006
Permissions and public process6000006
Site dependencies (land, grid, water)6000006
Spent fuel, waste and closure6000006
Next decision and prerequisites6000006
All nine questions4113000054