INET, Tsinghua University
Tsinghua University's Institute of Nuclear and New Energy Technology. Its HTR-10 project page, updated April 2026, describes the institute's historical experimental-reactor program, including construction from 1995, criticality in 2000 and full-power operation in 2003. These historical milestones do not establish a recent power run or continuing operating authority. The ARIS report separately attributes the HTR-10 design to INET.
- Projects
- Operating: HTR-10 high-temperature gas-cooled test reactor, Tsinghua INET. Furthest recorded stage of 2 as vendor, developer or operator, including 1 earlier-plan record. 1 design.
- Evidence
- 2 sources; first primary source: ARIS original status report — HTR-10 (2024-10-17). Record reviewed 14 Oct 2026.
Key facts · Designs · Tracked projects · Agreements · Ownership · Milestones · Sources · Its projects in the table · Who is involved
Key facts
- Organization type
- Research, Reactor developer
- Category
- research institution
- Country
- China
- Confidence
- medium
- Record reviewed
- 14 Oct 2026 (record review date, not proof of current activity)
All fields
(5 without a known value)
- Aliases
- None recorded in this release
- Listing status
- Unknown (no listing is recorded here; this does not mean the organization is private)
- Exchange / ticker
- None recorded in this release
- Ownership / control
- Unknown (no owner or controller is recorded here)
- Website
- None recorded in this release
Linked designs
- HTR-10 — High-temperature gas-cooled reactor (HTGR) · SMR
Tracked deployment projects
2 linked project records: 1 licensing, 1 operating, counting every project that names this organization in any recorded role (vendor, operator or participant); the developer table counts only projects that use its designs. These include proposals and historical canceled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.
- HTR-10 high-temperature gas-cooled test reactor, Tsinghua INET — Operating · China
Recorded link: vendor/developer field, operator/host field, intended licensed owner, construction contractor · project record checked 18 Oct 2026 · timeline · 2 recorded project actions · sources - Daqing NHR-200 nuclear heating plant (1990s) — Licensing · China
Recorded link: operator/host field · project record checked 18 Oct 2026 · timeline · permission status · sources
Agreements (1)
Agreements, plans, studies and government programs that name this organization as a participant. They are not deployment projects and are not counted above.
- CGN and Tsinghua NHR200-II nuclear district-heating demonstration: NEA-approved preliminary work (2018) — Feasibility or siting study · Status not established · announced Jan 2018
Recorded role: Developer or vendor
Ownership & relationships
- No dated parent/JV relationships recorded beyond ownership notes.
Milestones
- No organization-level milestones recorded. See the linked project timelines for dated developments and targets.
Organization-level unresolved information
- None noted for this organization; linked projects may still have open evidence.
Sources
(2)
- ARIS original status report — HTR-10 (2024-10-17) (IAEA/NEA, accessed 2 Oct 2026)
- INET Tsinghua: HTR-10 project page (academic, page updated Apr 2026, accessed 14 Oct 2026)