Projects / China · Operating
HTR-10 high-temperature gas-cooled test reactor, Tsinghua INET
HTR-10 is a high-temperature gas-cooled test reactor (10 MWt, 2 MWe per NNSA) at Tsinghua University's INET in Changping, China, listed as operating.
Current status
- How current
- General record check . Bounded evidence review . 8 of 15 listed sources have a publication or document date recorded here; the newest is 7 Apr 2024. A listed page was last updated Apr 2026. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
Newest recorded development . Next general check: . Next evidence or detail review: .
- Permissions
- Recorded: HTR-10 operating license issued in 2014, valid through June 2024 (15 Jul 2014); NNSA first fuel loading license for HTR-10 (2000). All permissions and applications
- Latest development
- 15 Jul 2014 · Operating authority recorded: HTR-10 operating license valid through June 2024; operation listed, not confirmed. NNSA's notice of 15 July 2014 issued the reactor's operating license, valid through 30 June 2024. Source: NNSA notice issuing the HTR-10 operating licence (Guohe Anfa [2014] No. 158) (dated 15 Jul 2014); NNSA operating licence for HTR-10 (Guohe Anzheng Zi No. 1405) (dated 15 Jul 2014). Updates entry
More on this development
Operation after that date required a new application twelve months before expiry. No successor license was opened and no dated recent power run was found, so operation is listed rather than confirmed. The stage is unchanged, and the reactor is not recorded as stopped.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- The mapped point is not an exact surveyed coordinate.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
- Reactor type
- High-temperature gas-cooled reactor. How it works, with a 3D view.
View on the map · View on the 3D globe · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
Built by Tsinghua University's INET, it reached criticality in December 2000 and full power in January 2003. The IAEA Research Reactor Database lists it as operational, but that record was last updated in February 2018, and no dated recent power run was found, so current operation is listed rather than confirmed. NNSA notice 国核安发〔2014〕158号, dated 15 July 2014, issued operating license 国核安证字1405号 to Tsinghua INET, valid through 30 June 2024. Continued operation after that date required a new application twelve months before expiry. No successor instrument was opened, so the stage is not changed and the reactor is not recorded as stopped. The February 2014 NNSA attachment states 10 MW thermal and 2 MW electric. A separate 2.5 MWe design figure is not collapsed into the stored 2 MW. The NNSA's public bureau-document list, screened on 16 October 2026 for items dated 8 September 2023 to 13 October 2026, shows no notice issuing or extending the HTR-10 operating license; it does record approval of the reactor's in-service inspection program, revision B, on 7 April 2024 (国核安发〔2024〕56号), before the license's June 2024 expiry. A separate 27 October 2026 title screen of the same NNSA bureau list for 14–27 October found no HTR-10 successor-license notice among the two new entries, and a 4 November 2026 screen found none among the five entries dated 29 October to 2 November. These limited listing screens do not establish continued authorization or prove that no other filing exists.
Key facts
- Design
- HTR-10 (SMR)
- Technology
- High-temperature gas-cooled reactor (HTGR) · helium
- Reactor vessel of this design
- 11.1 m tall, 4.2 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 217.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
All vessels to scale - Operator(s)
- INET, Tsinghua University
- Vendor for linked design
- INET, Tsinghua University
- Location
- INET, Tsinghua University (Changping) · China · precision: site area (named plant, laboratory, base, port, campus or parcel)
Approximate institute-area point from OpenStreetMap for the facility named by the regulator or operator; not the reactor building. - Coordinates
- 40.2596, 116.1506 · site-area point (approximate)
- Electrical capacity
- 2 MWe (gross/net unspecified) · scope: plant
- Thermal capacity
- 10 MWth (nameplate; basis unspecified)
- Purpose
- Research or test reactor
- Construction start
- Jun 1995HTR-10 construction begins
- Inclusion basis
- SMR by regulator classification
- Confidence
- medium
- Record reviewed
- 18 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes
HTR-10 high-temperature gas-cooled test reactor, Tsinghua INET is recorded at INET, Tsinghua University (Changping), Beijing, China. Operator: INET, Tsinghua University. Recorded vendor: INET, Tsinghua University. Stage: Operating. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).
Coordinate source: OpenStreetMap Nominatim geocoder, OpenStreetMap Nominatim result: institute-area point for INET, Tsinghua University, Changping (query not recorded)
Recorded electrical output is 2 MWe (gross/net unspecified), scope plant. Modules planned: 1. Recorded thermal output is 10 MWth (nameplate; basis unspecified).
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Operator or intended licensed owner
- OperatorINET, Tsinghua University
- Intended licensed ownerINET, Tsinghua University · source
- Reactor supplier
- Vendor for the linked designINET, Tsinghua University
- Customer or offtaker
Source-backed project statement The NNSA's February 2014 introduction to HTR-10 says that during trial operation the reactor supplied heating to the INET site from December 2003 to April 2004 and ran heating and combined heat and power operation in later winters to 2007. The recorded recipient of its heat was INET's own site. No outside buyer of heat or electricity is named. NNSA: letter on the HTR-10 operating licence (Guohe Anhan [2014] No. 25)
- Contractor
- Construction contractorINET, Tsinghua University · sourceResponsible for the overall design, construction and operation of the test reactor (IAEA-TECDOC-1382).
Source-backed project statement
IAEA-TECDOC-1382 assigns INET overall design, construction and operating responsibility for HTR-10. This supports the recorded owner-built construction role, not a separate EPC award. The document does not name the system subcontractors. IAEA-TECDOC-1382, chapter 4: HTR-10 general information
- Funding and government decisions
Source-backed project statement IAEA-TECDOC-1382 says HTR-10 was part of China's High Technology R&D Programme and approved by the State Council in March 1992, and that its basic design and budget estimate were approved by the State Education Commission and the State Science and Technology Commission in 1994. This shows a state-approved budget under a national program. No amount or disbursement is given. IAEA-TECDOC-1382, chapter 4: HTR-10 general information
- Fuel
- Fuel form stated for HTR-10 (catalog profile as of 17 Oct 2024)spherical elements with TRISO particles (UO2 kernel)
Source-backed project statement
IAEA's December 2012 report identifies INET's laboratory-scale HTR-10 fuel-production line and describes fabrication of HTR-10's first-core fuel in 2000–2001. This establishes historical first-core fabrication, not a current supply contract, later delivery or today's supplier. IAEA-TECDOC-1674: Advances in High Temperature Gas Cooled Reactor Fuel Technology
- Comparable schedule revision
Source-backed project statement HTR-10's historical first-criticality expectations changed from the beginning of 1999 to the end of 2000. An INET-authored paper published in August 1996 gave the earlier target. A July 2000 paper by IAEA staff summarized INET's status with the later target. These concern the same 10 MWth test reactor; the later account is a secondary summary, not an INET-issued forecast. The papers are associated with conferences in 1995 and June 2000, but those conference dates do not establish when the quoted words were stated. This is a partial history, retaining the sources' part-of-year wording without calculating months of delay. The achieved December 2000 criticality in the record remains a separate event. IAEA-TECDOC-1382, chapter 4: HTR-10 general information; Progress of the HTR-10 project; Global trends in advanced reactor developments, and the role of the IAEA; Progress of the HTR-10 project (Conference) | ETDEWEB; Global trends in advanced reactor developments, and the role of the IAEA (Conference) | ETDEWEB
Not recorded in SMRMap's reviewed evidence (3): Project proposer or applicant; Site host or owner; Programs and agreements naming the project
- Project proposer or applicant
- No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
- Site host or owner
- Programs and agreements naming the project
Timeline
Recorded developments
- · Operating authority recorded
HTR-10 operating license valid through June 2024; operation listed, not confirmed - · Electricity generation
HTR-10 combined heat-and-power trial operation - · Recorded development
HTR-10 reaches full power (10 MW thermal) - · First criticality
HTR-10 initial criticality - · Fuel load
HTR-10 first fuel loading begins
Earlier developments (3)
- · Recorded development
HTR-10 system commissioning begins - · Operating authority recorded
Operating authority recorded: NNSA first fuel loading license for HTR-10 - · Construction start
HTR-10 construction begins
This project’s dated entries are in Updates, filtered to this project. New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
Operating-license applications and decisions
- HTR-10 operating license issued in 2014, valid through June 2024
Operating authority · Issued / approved · NNSA · decided 15 Jul 2014 · permit 国核安证字1405号
NNSA notice 国核安发〔2014〕158号, dated 15 July 2014, issued operating license 国核安证字1405号 to Tsinghua University's Institute of Nuclear and New Energy Technology for the 10 MW high-temperature gas-cooled experimental reactor. The license is valid through 30 June 2024. Continued operation after that date requires a new application twelve months before expiry. No successor instrument was opened. The extracted license pages do not print a separate issue date; the decision-letter date is used. Personal names on the license are not stored.
Sources: NNSA notice issuing the HTR-10 operating licence (Guohe Anfa [2014] No. 158); NNSA operating licence for HTR-10 (Guohe Anzheng Zi No. 1405) - NNSA first fuel loading license for HTR-10
Operating authority · Issued / approved · NNSA · decided 2000
Reported in NNSA's own 2014 letter attachment; the 2000 license instrument itself was not opened, so no license number.
Sources: NNSA: letter on the HTR-10 operating licence (Guohe Anhan [2014] No. 25)
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(6 notes)
- Evidence review. NNSA's attachment to its letter of February 2014 describes HTR-10 as a modular pebble-bed test reactor of 10 MW thermal and 2 MW electric at Tsinghua University's Institute of Nuclear and New Energy Technology (INET) in Nankou Town, Changping District, Beijing. The same attachment says construction began in June 1995 and system commissioning in April 2000, after which NNSA issued a first fuel-loading license; fuel loading began on 20 November 2000, the initial core loading was completed and initial criticality reached on 1 December 2000, full power of 10 MW was reached on 26 January 2003, and a 72-hour full-power test was completed on 29 January 2003. Trial operation from December 2003 included heating runs and combined heat-and-power operation from October 2004 to April 2005 and November 2005 to April 2006, totalling 568 days of power operation by March 2007; no grid connection or commercial service is stated. The IAEA Research Reactor Database gives criticality as 21 December 2000, which differs from NNSA's 1 December 2000. Tsinghua applied for an operating license in 2012, and NNSA notice 国核安发〔2014〕158号 of 15 July 2014 issued operating license 国核安证字1405号 to INET as holder and the operating organization with full nuclear-safety responsibility, valid until 30 June 2024; condition 7 required a new application twelve months before expiry if the reactor was to keep operating. NNSA approved the reactor's in-service inspection program (revision B) on 7 April 2024, which is not a license. No opened source shows a renewed or new operating license after 30 June 2024, the IAEA database entry listing it as operational was last updated on 20 February 2018, and INET's project page (updated April 2026) gives history but no current power run, so the current operating mode and authority are not established. Stored values (10 MWt, 2 MWe, INET as operator, operating stage) match the 2014 NNSA attachment; the operating stage rests on licensed operation through June 2024 without later confirmation. At that review the record had no participant roles or generation event although NNSA records combined heat-and-power operation in 2004 to 2006; both have been recorded since and are listed on this page. Last checked 19 Oct 2026. NNSA: letter on the HTR-10 operating licence (Guohe Anhan [2014] No. 25); NNSA notice issuing the HTR-10 operating licence (Guohe Anfa [2014] No. 158); NNSA operating licence for HTR-10 (Guohe Anzheng Zi No. 1405); NNSA notice approving the 10 MW HTR-10 in-service inspection programme, revision B (国核安发〔2024〕56号); NNSA bureau documents list (核安全局文件 / 文件), pages index to index_19 as displayed 16 October 2026; IAEA Research Reactor Database: HTR-10; INET Tsinghua: HTR-10 project page
What would change this
An NNSA notice issuing, renewing or ending HTR-10's operating license after 30 June 2024, or an INET or NNSA statement dating a recent power run, shutdown or decommissioning. Next scheduled check: 19 Jan 2027.
- Electricity generation or commercial service evidence. NNSA's attachment to its February 2014 letter records that HTR-10 began trial operation in December 2003 and ran in combined heat-and-power mode from October 2004 to April 2005 and from November 2005 to April 2006, within 568 days of power operation by March 2007. That is evidence of electricity generation in test operation; no grid connection or commercial service is stated. It is historical: no public NNSA notice issuing or renewing the operating license after 30 June 2024 was found in the regulator's document list (8 September 2023 to 13 October 2026, screened by title), the 7 April 2024 in-service inspection approval shows oversight shortly before expiry, and the IAEA Research Reactor Database entry listing it as operational was last updated on 20 February 2018. Current power operation is neither confirmed nor contradicted. Last checked 19 Oct 2026. NNSA: letter on the HTR-10 operating licence (Guohe Anhan [2014] No. 25); NNSA bureau documents list (核安全局文件 / 文件), pages index to index_19 as displayed 16 October 2026; NNSA notice approving the 10 MW HTR-10 in-service inspection programme, revision B (国核安发〔2024〕56号); IAEA Research Reactor Database: HTR-10
What would change this
An NNSA notice issuing, renewing or terminating HTR-10's operating license, or an INET or NNSA statement that the reactor is shut down or decommissioned. Next scheduled check: 19 Jan 2027.
- Next decision and prerequisites. The 2014 NNSA operating license ran to 30 June 2024 and required a new license application twelve months before expiry for continued operation, so the next consequential step is an NNSA decision on renewed operation. NNSA approved revision B of HTR-10's in-service inspection program in April 2024. Whether a renewed license has been issued, or operation has stopped, is not shown in the documents reviewed. Last checked 23 Oct 2026. NNSA operating licence for HTR-10 (Guohe Anzheng Zi No. 1405); NNSA notice approving the 10 MW HTR-10 in-service inspection programme, revision B (国核安发〔2024〕56号)
What would change this
An NNSA notice granting, extending or refusing an HTR-10 operating license, or an INET statement of shutdown. Next scheduled check: 23 Apr 2027.
- Permissions and public process. NNSA's July 2014 notice issued Tsinghua University's INET the HTR-10 operating license, valid to 30 June 2024, after a 2012 application and technical review. The license says operation beyond that date needs a fresh application twelve months before expiry. A renewed or extended license was not found in the NNSA documents reviewed, and no public consultation step is described in them. Last checked 23 Oct 2026. NNSA notice issuing the HTR-10 operating licence (Guohe Anfa [2014] No. 158); NNSA operating licence for HTR-10 (Guohe Anzheng Zi No. 1405); NNSA: letter on the HTR-10 operating licence (Guohe Anhan [2014] No. 25)
What would change this
Publication of an NNSA notice renewing, extending or ending the HTR-10 operating license. Next scheduled check: 23 Apr 2027.
- Site dependencies (land, grid, water). NNSA's February 2014 project note places HTR-10 inside Tsinghua University's INET campus in Nankou town, Changping District, Beijing, and the 2014 license requires INET to report major changes in site conditions such as population or nearby industry. The reviewed NNSA documents do not describe grid connection, cooling-water supply or other site infrastructure arrangements. Last checked 23 Oct 2026. NNSA: letter on the HTR-10 operating licence (Guohe Anhan [2014] No. 25); NNSA operating licence for HTR-10 (Guohe Anzheng Zi No. 1405)
What would change this
An INET or NNSA document describing the reactor's grid, heat-use or cooling arrangements, or a site-condition change report. Next scheduled check: 23 Oct 2027.
- Spent fuel, waste and closure. The December 2012 IAEA account describes intermediate spent-fuel storage inside the HTR-10 reactor building and a strategy for temporary on-site radioactive-solid-waste storage followed by transport to national regional repositories. The report also says that questions concerning spent-fuel handling and intermediate and final storage remained under study. It does not establish a named final destination, completed shipments or current 2026 implementation. Last checked 27 Oct 2026. IAEA-TECDOC-1674: Advances in High Temperature Gas Cooled Reactor Fuel Technology
What would change this
A current INET/NNSA waste-implementation or decommissioning document establishing actual storage, shipments and long-term destinations or responsibilities. Next scheduled check: 25 Jan 2027.
Evidence dates
(8 of 15 sources with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(15)
- NNSA: letter on the HTR-10 operating licence (Guohe Anhan [2014] No. 25) (regulator, accessed 15 Oct 2026)
- IAEA-TECDOC-1382, chapter 4: HTR-10 general information (IAEA/NEA, accessed 27 Oct 2026)
- IAEA Research Reactor Database: HTR-10 (IAEA/NEA, accessed 2 Oct 2026)
- INET Tsinghua: HTR-10 project page (academic, page updated Apr 2026, accessed 14 Oct 2026)
- NNSA notice issuing the HTR-10 operating licence (Guohe Anfa [2014] No. 158) (regulator, dated 15 Jul 2014, accessed 15 Oct 2026)
- NNSA operating licence for HTR-10 (Guohe Anzheng Zi No. 1405) (regulator, dated 15 Jul 2014, accessed 15 Oct 2026)
- NNSA notice approving the 10 MW HTR-10 in-service inspection programme, revision B (国核安发〔2024〕56号) (regulator, dated 7 Apr 2024, accessed 16 Oct 2026)
- NNSA bureau documents list (核安全局文件 / 文件), pages index to index_19 as displayed 16 October 2026 (regulator, accessed 16 Oct 2026)
- Progress of the HTR-10 project (IAEA/NEA, published Aug 1996, accessed 24 Oct 2026)
- Global trends in advanced reactor developments, and the role of the IAEA (IAEA/NEA, published Jul 2000, accessed 24 Oct 2026)
- Progress of the HTR-10 project (Conference) | ETDEWEB (IAEA/NEA, published Aug 1996, accessed 24 Oct 2026)
- Global trends in advanced reactor developments, and the role of the IAEA (Conference) | ETDEWEB (IAEA/NEA, published Jul 2000, accessed 24 Oct 2026)
- IAEA-TECDOC-1674: Advances in High Temperature Gas Cooled Reactor Fuel Technology (IAEA/NEA, published Dec 2012, accessed 27 Oct 2026)
- NNSA bureau-document listing: HTR-10 title screen for 14–27 October2026 (regulator, accessed 27 Oct 2026)
- NNSA bureau-document listing: title screen to 2 November 2026 (regulator, accessed 4 Nov 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: HTR-10 high-temperature gas-cooled test reactor, Tsinghua INET — https://smrmap.com/projects/htr-10-inet/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “HTR-10 high-temperature gas-cooled test reactor, Tsinghua INET”. Record reviewed 18 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/htr-10-inet/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.