Designs

HTR-10

NNSA's 2014 description of the HTR-10 test reactor at Tsinghua's INET gives 10 MW thermal and 2 MW electric for its single modular pebble-bed unit. The thermal rating is recorded here; the electrical rating remains unassigned because an IAEA 2020 catalog describes 2.5 MWe and the basis or configuration difference was not resolved. The linked project carries the regulator's 2 MWe figure with its source. This is an operating research reactor, not a commercial design approval.

Reactor type
High-temperature gas-cooled reactor. How it works, with a 3D view.
Projects
Operating: HTR-10 high-temperature gas-cooled test reactor, Tsinghua INET. Development status as stated in the catalog dated 17 Oct 2024: Operational.
Evidence
4 sources; first primary source: ARIS original status report — HTR-10 (2024-10-17). Record reviewed 8 Oct 2026.
Schematic of HTR-PM, this type's example. On the left, a tall reactor vessel holds a bed of fuel spheres inside a graphite reflector, with fuel tubes above and below.
Schematic of HTR-PM, this type's example.

Catalog identity snapshot: 17 Oct 2024 (ARIS report publication). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
High-temperature gas-cooled reactor (HTGR)
Coolant
Helium
Spectrum
Thermal
Developer / vendor(s) as of 17 Oct 2024
INET, Tsinghua University
Module thermal
10 MWth (nameplate; basis unspecified)
Fuel form
spherical elements with TRISO particles (UO2 kernel)
Development status (as stated)
Operational
Reactor vessel
11.1 m tall, 4.2 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 217.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
10 m bar; a person 1.8 m tall
HTR-10
11.1 m tall, 4.2 m across
All vessels to scale
Inclusion basis
SMR by design class
Confidence
medium
Record reviewed
8 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(1 without a known value)
Module electrical
Not recorded

Tracked deployment projects

Design sources

(4)

Evidence and open questions

(1 note)
  • Evidence review. China's National Nuclear Safety Administration letter of 25 February 2014 seeks opinions on its intention to issue Tsinghua University an operating license for the 10 MW high-temperature gas-cooled test reactor (HTR-10) at INET in Nankou, Changping district, Beijing; it is a consultation on a proposed license, not the license itself. Its attached description calls HTR-10 a modular pebble-bed reactor with overall parameters of 10 MW thermal and 2 MW electric, coated-particle fuel, helium coolant and graphite moderator, and says it reached full power of 10 MW on 26 January 2003. The IAEA 2024 SMR Technology Catalogue (printed June 2025), repeating the 2020 SMR booklet, names INET, Tsinghua University as technology developer and lists the pebble-bed modular HTGR test reactor at 10 / 2.5 MW(t)/MW(e), operational, built to demonstrate HTGR safety and test electricity, district heating and process heat. The ARIS report (published 17 October 2024) classifies its neutron spectrum as thermal. The sources describe the single test reactor that is the linked INET deployment. Stored vendor, HTGR family, helium coolant, thermal spectrum, 10 MWth and TRISO pebble fuel stay supported; the electrical rating remains unassigned because the regulator's 2 MWe and the IAEA editions' 2.5 MWe still differ. Last checked 19 Oct 2026. NNSA: letter on the HTR-10 operating licence (Guohe Anhan [2014] No. 25); Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition); ARIS original status report — HTR-10 (2024-10-17)
    What would change this

    An NNSA or INET document (for example the issued HTR-10 operating license or a current INET facility description) stating the electrical rating and whether it is gross or net, which would resolve 2 versus 2.5 MWe. Next scheduled check: 19 Jan 2027.

Regulatory actions

Compare reviews and approvals across designs

Operating-license applications and decisions