BWXT BANR
BWXT Advanced Nuclear Reactor — modular factory-fabricated helium-cooled HTGR microreactor (company materials: ~75 MWt). DOE ARDP risk-reduction program.
- Reactor type
- High-temperature gas-cooled reactor. How it works, with a 3D view.
- Projects
- Announced: 3 projects.
- Evidence
- 3 sources; first primary source: BWXT Advanced Nuclear Reactor (BANR) product page. Record reviewed 1 Oct 2026.
Key facts · Tracked projects · Agreements · Sources · Evidence · Its projects in the table · Compare with other designs
Key facts
- Class
- Microreactor
- Technology
- High-temperature gas-cooled reactor (HTGR)
- Coolant
- Helium
- Spectrum
- Thermal
- Developer / vendor(s)
- BWX Technologies
- Module thermal
- 75 MWth (nameplate; basis unspecified)
- Fuel form
- TRISO-coated fuel particles
- Enrichment
- 19.75%
- Inclusion basis
- Labeled microreactor
- Confidence
- medium
- Record reviewed
- 1 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(1 without a known value)
- Module electrical
- Not recorded
Tracked deployment projects
- Belledune Prodigy transportable nuclear proposal — Announced · Canada
- Tata / BWXT BANR Green River, Wyoming proposal — Announced · United States
- BWXT BANR at Fort Campbell (Army Janus) — Announced · United States
Agreements naming this design (1)
Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.
- BWXT and Wyoming Energy Authority contract to assess BANR microreactor deployment in Wyoming — Feasibility or siting study · Status not established · announced 12 Sep 2023
Concerns United States
Design sources
(3)
- BWXT Advanced Nuclear Reactor (BANR) product page (company, accessed 1 Oct 2026)
- BWXT Commercial Nuclear Operations brochure (2025) (company, accessed 1 Oct 2026)
- Tata Green River BANR letter of intent (company, accessed 1 Oct 2026)
Evidence and open questions
(1 note)
- Evidence review. BWXT's BANR product page (undated, captured 2026-10-19) describes the BWXT Advanced Nuclear Reactor as a modular, factory-fabricated, transportable 75 MW thermal high-temperature gas reactor (HTGR) for remote power and industrial heat, using TRISO-coated fuel particles with uranium enriched to 19.75%, able to run as cogeneration or all-electricity, and part of DOE's Advanced Reactor Demonstration Program. BWXT's 2025 Commercial Nuclear Operations brochure says BANR employs mature high-temperature gas reactor technology with passive cooling and TRISO fuel; neither BWXT document gives an electrical rating, a licensing status or names the coolant gas or neutron spectrum. Tata Chemicals' 12 December 2024 release announces an LOI between Tata Chemicals Soda Ash Partners and BWXT Advanced Technologies LLC to explore up to eight BANR microreactors at Green River, Wyoming by the early 2030s (the Green River proposal); no opened source names Fort Campbell/Janus or the Belledune Prodigy proposal. Stored vendor, HTGR family, 75 MWth (unspecified basis), no electrical rating, TRISO fuel and 19.75% enrichment stay supported; the stored helium coolant and thermal spectrum are not stated in any opened source. Last checked 19 Oct 2026. BWXT Advanced Nuclear Reactor (BANR) product page; BWXT Commercial Nuclear Operations brochure (2025); Tata Green River BANR letter of intent
What would change this
A BWXT BANR technical description or regulatory pre-application document (NRC topical report or DOE/Army Janus authorization) stating the coolant, spectrum and electrical output, or a definitive Tata/BWXT purchase agreement for Green River. Next scheduled check: 19 Jan 2027.