Projects / United States · Announced

BWXT BANR at Fort Campbell (Army Janus)

The Army paired BWXT Advanced Technologies, LLC with Fort Campbell under the Janus Program in August 2026 for an announced BWXT BANR reactor.

Current status

Stage
Announced
How current
General record check . Bounded evidence review . None of the 3 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Thermal output is not recorded on this project.
  • The mapped point is not an exact surveyed coordinate.
Same design
3 tracked: 3 announced. 96 tracked at announced across all designs. Recorded stages, not proof of current activity.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
High-temperature gas-cooled reactor. How it works, with a 3D view.
Schematic of HTR-PM, this type's example. On the left, a tall reactor vessel holds a bed of fuel spheres inside a graphite reflector, with fuel tubes above and below.
Schematic of HTR-PM, this type's example.

Description

The Army says the prototype reactors will be contractor-owned and operated. The Army hosts the reactor and is not its operator. BWXT says it will work with the customer and partners on establishing the operating company structure, so the eventual operating-company structure remains to be established. BWXT describes one 20 MWe BANR, with construction targeted for late 2028; BWXT targets reactor operations in the early 2030s. Its announced first-phase work includes initiating TRISO fuel fabrication at existing BWXT facilities; this does not establish completed fabrication or delivery. BWXT Advanced Technologies, LLC is recorded as the intended contractor operator named by the Army, not as evidence of current operation or an operating license.

Key facts

Design
BWXT BANR (Microreactor)
Technology
High-temperature gas-cooled reactor (HTGR) · helium
Operator(s)
BWXT Advanced Technologies, LLC
Vendor for linked design
BWX Technologies
Location
Fort Campbell · United States · precision: site area (named plant, laboratory, base, port, campus or parcel)
Installation point from the Wikipedia article for Fort Campbell; the sources name the installation but no pad or parcel on it, so this marks the base area, not a reactor site (Eielson and Buckley precedent).
Coordinates
36.65, -87.46667 · site-area point (approximate)
Electrical capacity
20 MWe (gross/net unspecified) · scope: plant
Thermal capacity
Not recorded
Modules planned
1
Inclusion basis
Labeled microreactor
Confidence
medium
Record reviewed
10 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

BWXT BANR at Fort Campbell (Army Janus) is recorded at Fort Campbell, Kentucky, United States. Operator: BWXT Advanced Technologies, LLC. Recorded vendor: BWX Technologies. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: Wikipedia: Fort Campbell (article coordinates), Article coordinate 36.65, -87.46667 on 'Fort Campbell', read 30 October 2026

Recorded electrical output is 20 MWe (gross/net unspecified), scope plant. Modules planned: 1. Thermal output is not recorded on this project. The linked design record states 75 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Operator or intended licensed owner
Reactor supplier
Funding and government decisions

Source-backed project statement The Army's 26 August 2026 release says Janus vendors, including BWXT Advanced Technologies for Fort Campbell, will receive government funding only after hitting technical milestones, from about $2.2 billion across fiscal years 2027 to 2031 for all vendors, alongside vendor capital. This is conditional, milestone-based Army funding. No amount for Fort Campbell is stated and no milestone payment has been reported. Army reaches agreement with private industry for nuclear micro reactors

Fuel
  • Fuel form stated for BWXT BANRTRISO-coated fuel particles
  • Enrichment stated for BWXT BANR19.75%
Project fuel information is described in the source-backed statement below.
Source-backed project statement

BWXT's 26 August 2026 release says the first phase of its Fort Campbell Janus work includes initiating TRISO fuel fabrication at existing BWXT facilities, and POWER Magazine the same day says this will begin at BWXT's NRC-licensed Lynchburg, Virginia facility. This is a planned start of fabrication by the vendor itself. No quantity, delivery date or completed fabrication is stated. U.S. Army chooses BWXT BANR for Janus program; POWER: U.S. Army mobilizes $2.2B Janus program

Site host or owner
Programs and agreements naming the project
Not found in the sources we checked (3): Customer or offtaker; Contractor; Comparable schedule revision
Customer or offtaker

BWXT's 26 August 2026 release says it will work with the customer and potential partners on establishing the operating company structure for the Fort Campbell BANR, without naming that customer or stating who would take the reactor's power. The Army's release the same day pairs BWXT with Fort Campbell but names no power recipient or agreement. U.S. Army chooses BWXT BANR for Janus program

Contractor

The Army's 26 August 2026 release pairs BWXT Advanced Technologies with Fort Campbell, and BWXT's release describes a phased Janus contract whose first phase covers site selection, regulatory work and starting fuel fabrication, with groundbreaking targeted for late 2028. BWXT is the project's own vendor and intended operator, so this is not a separate contractor appointment. Neither source names an engineering or construction contractor. Army reaches agreement with private industry for nuclear micro reactors; U.S. Army chooses BWXT BANR for Janus program

Comparable schedule revision

Comparable schedule revision not established. BWXT's 26 August 2026 release targets groundbreaking at Fort Campbell in late 2028 and reactor operations in the early 2030s, and POWER Magazine repeats these the same day. Targets stated once on the announcement day are not a revision. U.S. Army chooses BWXT BANR for Janus program

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(6 notes)
  • Evidence review. On 26 August 2026 the Army paired BWXT Advanced Technologies, LLC with Fort Campbell and said the prototype reactors will be contractor-owned and operated. BWXT says the Janus unit is a 20 megawatt electric version of BANR, and POWER describes one 20 MWe reactor using nitrogen coolant and uranium oxycarbide TRISO fuel enriched to 19.75 percent. BWXT targets groundbreaking in late 2028 and operations in the early 2030s, and those dates are targets rather than achieved construction or operation. The first phase is final site selection inside Fort Campbell, Army regulatory processes, and the start of TRISO fabrication at existing BWXT facilities. No Fort Campbell contract price is stated. The stored stage remains announced, the stored 20 MWe and one-module plant count stay, and the parcel remains undisclosed. Last checked 19 Oct 2026. Army reaches agreement with private industry for nuclear micro reactors; U.S. Army chooses BWXT BANR for Janus program; POWER: U.S. Army mobilizes $2.2B Janus program
    What would change this

    A BWXT or Army notice that names the selected parcel inside Fort Campbell would change the site. Next scheduled check: 19 Jan 2027.

  • Site location recorded as disclosed: Not disclosed in the reviewed evidence. Fort Campbell is the host installation. BWXT says the first phase includes final site selection within Fort Campbell, so no reactor parcel is named. The installation is not a disclosed plot. Last checked 19 Oct 2026. U.S. Army chooses BWXT BANR for Janus program
    What would change this

    An Army or BWXT selection of the parcel inside Fort Campbell would settle the site. Next scheduled check: 19 Jan 2027.

  • Next decision and prerequisites. POWER reports BWXT is targeting construction at Fort Campbell in late 2028 and operation in the early 2030s. Janus reactors are to be authorized under an Army-run licensing regime, with installations still subject to environmental review; no Fort Campbell-specific step or date for either is given. The program pays vendors only on reaching technical milestones. These dates are company targets. Last checked 23 Oct 2026. POWER: U.S. Army mobilizes $2.2B Janus program; Army reaches agreement with private industry for nuclear micro reactors
    What would change this

    An Army licensing or NEPA decision, or a milestone payment report, for this installation. Next scheduled check: 21 Jan 2027.

  • Permissions and public process. The Army paired BWXT with Fort Campbell under the Janus program in August 2026, a selection under milestone-based agreements rather than a permit. Army officials said in August 2026, as reported by POWER, that Janus reactors will be licensed under an Army-run defense regime rather than by the NRC, and that installations remain subject to NEPA and other environmental reviews. No Army license or completed environmental review for this installation is recorded. Last checked 23 Oct 2026. POWER: U.S. Army mobilizes $2.2B Janus program
    What would change this

    An Army licensing decision or a NEPA document for the reactor at this installation. Next scheduled check: 21 Jan 2027.

  • Site dependencies (land, grid, water). POWER reports BWXT plans a 20 MWe BANR at Fort Campbell, a post of about 105,000 acres on the Kentucky–Tennessee border, and Army officials said Janus installations will remain on the grid. No plot, land arrangement or connection point is described. Last checked 23 Oct 2026. POWER: U.S. Army mobilizes $2.2B Janus program
    What would change this

    A NEPA document or Army site decision describing the reactor plot and its grid tie-in. Next scheduled check: 21 Jan 2027.

  • Spent fuel, waste and closure. Army officials said in August 2026, as reported by POWER, that all nuclear waste must leave a Janus installation within two years of a reactor shutting down, and that the Army plans to negotiate one arrangement under which the Department of Energy would receive the spent fuel and take title for payment. That arrangement was still to be negotiated; no contract or receiving facility is named. Last checked 23 Oct 2026. POWER: U.S. Army mobilizes $2.2B Janus program
    What would change this

    An Army–DOE spent-fuel agreement or a NEPA document for the reactor at this installation. Next scheduled check: 21 Jan 2027.

Evidence dates

(0 of 3 sources with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated recorded event: no date recorded.3 of 3 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(3)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: BWXT BANR at Fort Campbell (Army Janus) — https://smrmap.com/projects/janus-fort-campbell-banr/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “BWXT BANR at Fort Campbell (Army Janus)”. Record reviewed 10 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/janus-fort-campbell-banr/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.