Projects / United States · Announced
Tata / BWXT BANR Green River, Wyoming proposal
December 2024 LOI explores up to eight BANR microreactors at the Tata Green River industrial site.
Current status
- How current
- General record check . Bounded evidence review . None of the 2 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
No dated development is recorded. Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- No actual dated development is recorded.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Electrical output is not recorded.
- Thermal output is not recorded on this project.
- The mapped point is not an exact surveyed coordinate.
- Same design
- 3 tracked: 3 announced. 96 tracked at announced across all designs. Recorded stages, not proof of current activity.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
- Reactor type
- High-temperature gas-cooled reactor. How it works, with a 3D view.
View on the map · View on the 3D globe · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
Purchase terms and technical/economic parameters remain conditional. Separate from Holtec Green River, Utah. The primary does not give a selected electrical or thermal capacity.
Key facts
- Design
- BWXT BANR (Microreactor)
- Technology
- High-temperature gas-cooled reactor (HTGR) · helium
- Operator(s)
- Tata Chemicals North America
- Vendor for linked design
- BWX Technologies
- Location
- Tata Chemicals Soda Ash Partners site, Green River · United States · precision: site area (named plant, laboratory, base, port, campus or parcel)
Approximate coordinates for the named Green River, Wyoming proposal location from the NuclearChain reactors export (CC BY 4.0; derived from GEM's tracker). - Coordinates
- 41.5916, -109.755 · site-area point (approximate)
- Electrical capacity
- Not recorded · scope: plant
- Thermal capacity
- Not recorded
- Modules planned
- Not recorded
- Inclusion basis
- Labeled microreactor
- Confidence
- medium
- Record reviewed
- 2 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes
Tata / BWXT BANR Green River, Wyoming proposal is recorded at Tata Chemicals Soda Ash Partners site, Green River, Wyoming, United States. Operator: Tata Chemicals North America. Recorded vendor: BWX Technologies. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).
Coordinate source: NuclearChain reactors.csv export (unit coordinates), NuclearChain reactors.csv row 'green-river-nuclear-power-plant-1' (41.5915812, -109.7549522)
Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project. The linked design record states 75 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Project proposer or applicant
- Project proposerBWX Technologies · source
- Operator or intended licensed owner
- OperatorTata Chemicals North America
- Reactor supplier
- Vendor for the linked designBWX Technologies
- Customer or offtaker
- Prospective customer / offtaker (binding offtake not established)Tata Chemicals Soda Ash Partners LLC · sourceDecember 2024 LOI explores up to eight BANR units and future energy-purchase terms at Green River. The named subsidiary is separate from its parent; no executed PPA is established.
Source-backed project statement
Tata Chemicals North America said on 12 December 2024 that its subsidiary, Tata Chemicals Soda Ash Partners, signed a letter of intent with BWXT to explore up to eight BANR microreactors for electricity and process heat at Green River, Wyoming. The letter says the parties will develop terms to conditionally purchase the reactors and the parameters needed to turn those commitments into an energy purchase agreement. A letter of intent is not an executed purchase or a binding offtake. Tata Green River BANR letter of intent
- Contractor
Source-backed project statement Tata’s 12 December 2024 letter states that BWXT and TCSAP had collaborated since September 2023 on the feasibility of integrating BANR at TCSAP’s Green River, Wyoming manufacturing site. The letter expands that work to conditional-purchase terms; it is not an executed purchase or a construction award. Tata Green River BANR letter of intent
- Fuel
- Fuel form stated for BWXT BANRTRISO-coated fuel particles
- Enrichment stated for BWXT BANR19.75%
The letter text that was read does not mention fuel, enrichment, a supplier, or a delivery. Design fuel described for BANR on a different project's page is not a commitment for Green River. Tata Green River BANR letter of intent
Not found in the sources we checked (2): Funding and government decisions; Comparable schedule revision
- Funding and government decisions
The Tata letter describes work toward conditional reactor-purchase terms. It does not identify a project financing commitment or amount, and the conditional purchase is not a payment. Tata Green River BANR letter of intent
- Comparable schedule revision
Comparable schedule revision not established. The 12 December 2024 letter says the parties will establish milestones on a path to deploying the reactors by the early 2030s. That is one target. No earlier or later date for the same milestone appears in the letter. Tata Green River BANR letter of intent
Not recorded in SMRMap's reviewed evidence (2): Site host or owner; Programs and agreements naming the project
- Site host or owner
- Programs and agreements naming the project
Timeline
This timeline has no entries yet. Other dated information may appear in the description and checking notes.
New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(4 notes, 1 not yet reviewed)
- Evidence review. Tata Chemicals North America said on 12 December 2024 that its subsidiary Tata Chemicals Soda Ash Partners signed a letter of intent with BWXT Advanced Technologies to explore deploying up to eight BANR microreactors at the Green River, Wyoming manufacturing site. The letter explores commercial terms for a conditional purchase. Up to eight is a ceiling, not a selected unit count. No output, fuel contract, NRC application or licensed operator is named. The stored BANR design, BWXT as vendor and announced stage stay. The Global Energy Monitor page does not discuss this project. Last checked 19 Oct 2026. Tata Green River BANR letter of intent
What would change this
A purchase agreement or an NRC application for the Green River BANR units would change this record. Next scheduled check: 19 Jan 2027.
- Next decision and prerequisites. The 12 December 2024 letter says the parties will develop conditional-purchase terms, deployment milestones, and the techno-economic parameters needed to turn those commitments into an energy purchase agreement. That is the next decision the letter names. It names no regulatory filing or prerequisite beyond that commercial work. Last checked 23 Oct 2026. Tata Green River BANR letter of intent
What would change this
The conditional purchase terms or the energy purchase agreement, or a regulatory application for Green River. Next scheduled check: 21 Jan 2027.
- Permissions and public process: Not disclosed in the reviewed evidence. The 12 December 2024 letter announces a commercial letter of intent and quotes the Wyoming Energy Authority welcoming the step. It does not describe a permit, a license application, a hearing, or an environmental decision for the Green River reactors. Last checked 23 Oct 2026. Tata Green River BANR letter of intent
What would change this
A Nuclear Regulatory Commission, Wyoming, or Bureau of Land Management filing or decision for these reactors. Next scheduled check: 21 Jan 2027.
- Site dependencies (land, grid, water): Not disclosed in the reviewed evidence. The letter says the feasibility work concerns TCSAP’s existing Green River, Wyoming manufacturing site, where the company has processed trona since 1968. It does not state a reactor land instrument, a grid interconnection, or a water arrangement. Exploring integration at an existing plant is not a secured site arrangement for the reactors. Last checked 23 Oct 2026. Tata Green River BANR letter of intent
What would change this
A land, interconnection, or water agreement for the Green River reactors, as distinct from the existing soda-ash plant. Next scheduled check: 21 Jan 2027.
Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.
Evidence dates
(0 of 2 sources with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(2)
- Tata Green River BANR letter of intent (company, accessed 1 Oct 2026)
- Global Energy Monitor Global Nuclear Power Tracker (directory or tracker, accessed 2 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: Tata / BWXT BANR Green River, Wyoming proposal — https://smrmap.com/projects/bwxt-green-river/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “Tata / BWXT BANR Green River, Wyoming proposal”. Record reviewed 2 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/bwxt-green-river/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.