SSR-W
SSR-W, the Stable Salt Reactor - Wasteburner, is Moltex Energy's conceptual molten-salt reactor, with molten salt fuel in place of solid pellets in conventional fuel assemblies. It is designed for countries with significant stocks of spent nuclear fuel.
- Reactor type
- Molten salt reactor. How it works, with a 3D view.
- Projects
- Announced: Moltex SSR-W at Point Lepreau. Development status as stated in the catalog dated 14 Feb 2025: Conceptual design.
- Evidence
- 3 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Regulatory actions · Its projects in the table · Compare with other designs
Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Molten salt reactor (MSR)
- Coolant
- Molten salt
- Spectrum
- Fast
- Developer / vendor(s) as of 14 Feb 2025
- Moltex Energy
- Fuel form
- Molten salt fuel within vented fuel tubes
- Development status (as stated)
- Conceptual design
- Reactor vessel
- 14 m tall, 7 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 363.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.All vessels to scale10 m bar; a person 1.8 m tallSSR-W
14 m tall, 7 m across - Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- Moltex SSR-W at Point Lepreau — Announced · Canada
Design sources
(3)
- NEA Small Modular Reactor Dashboard — Third Edition (2025) (IAEA/NEA, accessed 2 Oct 2026)
Catalog page 172 - IAEA ARIS design record: SSR-W (IAEA/NEA, accessed 2 Oct 2026)
- Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition) (IAEA/NEA, published Jun 2025, accessed 2 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. The Moltex Energy section of the 2024 IAEA SMR Technology Catalogue (third edition, June 2025; contributor material) describes the Stable Salt Reactor - Wasteburner (SSR-W), a static-fueled molten salt fast reactor from Moltex Energy, Canada, with molten chloride fuel salt held in vented fuel tubes, an MgCl2/NaCl coolant salt and no moderator. It is meant to generate electricity, running the reactor at constant power while heat storage lets the plant serve as a peaking plant, and to burn actinides recycled from spent fuel. The catalog gives 750 MW(t) with 300 MW(e) continuous as baseload, or 750/900 as an 8-hour peaking plant, for a single-reactor plant; the electrical basis (gross or net) is not stated. As dated by that edition, the design completed Phase 1 of the CNSC Vendor Design Review in 2021, and the NEA dashboard (assessment cutoff February 2025) adds that Moltex has a service agreement for Phase 2; a vendor design review is a design-stage instrument, not a project permission. The catalog says NB Power and the Government of New Brunswick selected Moltex with the goal of deploying the first reactor next to the Point Lepreau Nuclear Generating Station, which connects the linked Point Lepreau deployment as a goal, not a licensed project. The stored Moltex vendor, MSR family, molten-salt coolant, fast spectrum, fuel form and 'Conceptual Design' status match the catalog; the rating stays off this identity profile. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition); NEA Small Modular Reactor Dashboard — Third Edition (2025)
What would change this
A CNSC notice that Phase 2 of the SSR-W Vendor Design Review is complete, an NB Power license application for Point Lepreau, or a newer IAEA catalog edition revising the SSR-W rating or status. Next scheduled check: 19 Jan 2027.
- Module rating. The 2024 IAEA catalog (third edition, June 2025) gives the SSR-W 750 MW(t) with 300 MW(e) continuous as baseload, or 750/900 as an 8-hour peaking plant using salt heat storage; the turbine is specified for a 300 MWe plant and the fuel-cycle section calls the 300 MWe version SSR-W300. These figures describe one reactor plant and do not state a gross or net basis. By standing rule the figure is not stored on this identity profile. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
What would change this
A CNSC Phase 2 VDR report or Moltex design document stating the SSR-W electrical basis (gross or net) for the 300 MWe plant. Next scheduled check: 19 Jan 2027.
Regulatory actions
Compare reviews and approvals across designs
Design assessment
- CNSC vendor design review, Phase 1 (SSR-W) — applies to the design, not to a site
Design assessment · Review completed (not an approval) · CNSC · completed May 2021
CNSC lists Phase 1 of its pre-licensing vendor design review of Moltex Energy's SSR-W300 among completed reviews, with an executive summary dated May 2021. No later phase is listed. CNSC says a vendor design review does not certify a design, issue a license or bind later Commission decisions.
Sources: CNSC: vendor design review service agreements and completed reviews