Projects / Canada · Announced
Moltex SSR-W at Point Lepreau
NB Power selected Moltex's SSR-W in 2018 as a reactor technology it intends to build at Point Lepreau.
Current status
- How current
- General record check . Bounded evidence review . None of the 3 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
No dated development is recorded. Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- No actual dated development is recorded.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Electrical output is not recorded.
- Thermal output is not recorded on this project.
- No operator is recorded.
- The mapped point is not an exact surveyed coordinate.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
- Reactor type
- Molten salt reactor. How it works, with a 3D view.
View on the map · View on the 3D globe · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
This does not identify the future reactor operator. Nuclea Energy Canada's August 2026 agreement to acquire Moltex technology assets is subject to closing conditions; project continuity is not established either way. The 300–500 MWe is a technology range, not a selected project rating.
Key facts
- Design
- SSR-W (SMR)
- Technology
- Molten salt reactor (MSR) · molten salt
- Reactor vessel of this design
- 14 m tall, 7 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 363.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
All vessels to scale - Operator(s)
- Not recorded
- Vendor for linked design
- Moltex Energy
- Location
- Point Lepreau Nuclear Generating Station site · Canada · precision: site area (named plant, laboratory, base, port, campus or parcel)
NuclearChain reactors export point for the Point Lepreau station, which the export also uses for its ARC-100 and SSR-W entries (CC BY 4.0, derived from GEM's Global Nuclear Power Tracker). Station-area point: the SMR parcels are separate from the CANDU unit and are not published, so this is not an exact location. - Coordinates
- 45.0686, -66.4543 · site-area point (approximate)
- Electrical capacity
- Not recorded · scope: plant
- Thermal capacity
- Not recorded
- Inclusion basis
- Vendor SMR claim, capacity checked
- Confidence
- medium
- Record reviewed
- 2 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes
Moltex SSR-W at Point Lepreau is recorded at Point Lepreau Nuclear Generating Station site, New Brunswick, Canada. Operator: No operator is recorded. Recorded vendor: Moltex Energy. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate). Other records at this site: NB Power ARC-100 at Point Lepreau.
Coordinate source: NuclearChain reactors.csv export (unit coordinates), NuclearChain reactors.csv row 'point-lepreau-nuclear-power-plant-smr-1' (45.0686, -66.4543)
Electrical output is not recorded on this project. Modules planned: 1. Thermal output is not recorded on this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Reactor supplier
- Vendor for the linked designMoltex Energy
- Funding and government decisions
Source-backed project statement World Nuclear News reported on 16 July 2018 that the agreement with the New Brunswick Energy Solutions Corporation and NB Power for a Point Lepreau SSR-W demonstration provides CAD 5.0 million of financial support to Moltex for its immediate development activities. This is development support, not construction funding, and the report does not say it was paid. Other figures read (a CAD 10 million provincial research-cluster commitment and Nuclea's C$96 million company total) are not this project's funding. WNN: Moltex partners in New Brunswick SMR project; Nuclea Energy enters definitive agreement to acquire Moltex Energy's assets
- Fuel
- Fuel form stated for SSR-W (catalog profile as of 14 Feb 2025)Molten salt fuel within vented fuel tubes
World Nuclear News' 16 July 2018 report quotes Moltex saying the SSR-W uses spent nuclear fuel, and Nuclea's 13 August 2026 announcement says the SSR-W uses recycled material as fuel salt and that its WATSS recycling process was demonstrated with used fuel at Canadian Nuclear Laboratories. These describe the design and a fuel process. None names a quantity, source or delivery of fuel for a Point Lepreau reactor. WNN: Moltex partners in New Brunswick SMR project; Nuclea Energy enters definitive agreement to acquire Moltex Energy's assets
Not found in the sources we checked (3): Customer or offtaker; Contractor; Comparable schedule revision
- Customer or offtaker
World Nuclear News reported on 16 July 2018 that Moltex's chief executive called the SSR-W a fit for New Brunswick's power needs that could lower electricity costs to consumers. Neither that report, Moltex's first-reactor page nor Nuclea's 13 August 2026 announcement names a buyer or agreement for power from a Point Lepreau SSR-W. WNN: Moltex partners in New Brunswick SMR project; Moltex: our first reactor (Point Lepreau)
- Contractor
World Nuclear News reported on 16 July 2018 that Moltex would build a demonstration SSR-W at Point Lepreau under an agreement with the New Brunswick Energy Solutions Corporation, a provincial and NB Power joint venture, and NB Power. Moltex is the reactor vendor and the counterparties are the site owner and a government vehicle, so this is not a contractor appointment. No engineering or construction contractor is named, and Nuclea's August 2026 asset purchase had not closed. WNN: Moltex partners in New Brunswick SMR project; Moltex: our first reactor (Point Lepreau); Nuclea Energy enters definitive agreement to acquire Moltex Energy's assets
- Comparable schedule revision
World Nuclear News reported on 16 July 2018 that the agreement called for Moltex to deploy its first SSR-W at Point Lepreau before 2030, while Moltex's first-reactor page, read in 2026, says it is on its way to an operational reactor by the early to mid 2030s. The page sentence is undated, so the two targets cannot be placed as a dated revision, but they differ for the same first reactor. WNN: Moltex partners in New Brunswick SMR project; Moltex: our first reactor (Point Lepreau)
Not recorded in SMRMap's reviewed evidence (3): Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
- Operator or intended licensed owner
- Site host or owner
- Programs and agreements naming the project
Timeline
This timeline has no entries yet. Other dated information may appear in the description and checking notes.
New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Assessments of the design (not of this site)
(1)
- CNSC vendor design review, Phase 1 (SSR-W) — applies to the design, not to a site
Design assessment · Review completed (not an approval) · CNSC · completed May 2021
CNSC lists Phase 1 of its pre-licensing vendor design review of Moltex Energy's SSR-W300 among completed reviews, with an executive summary dated May 2021. No later phase is listed. CNSC says a vendor design review does not certify a design, issue a license or bind later Commission decisions.
Sources: CNSC: vendor design review service agreements and completed reviews
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(5 notes)
- Evidence review. NB Power selected SSR-W as one of two reactor technologies it intends to build at Point Lepreau. The captured Moltex page describes a project in licensing development, not an issued plant license, and does not expressly appoint the future reactor operator. Nuclea's 13 August 2026 announcement describes a definitive agreement to acquire assets from Moltex Energy Limited in administration, subject to closing conditions. It does not establish a completed acquisition or the Canadian project's continuity. The 300–500 MWe technology range is not a selected project rating. Last checked 19 Oct 2026. Moltex: our first reactor (Point Lepreau); Nuclea Energy enters definitive agreement to acquire Moltex Energy's assets
What would change this
A current NB Power/Moltex project agreement naming the operating entity and selected configuration, or evidence that the announced asset transaction closed and applies to this deployment. Next scheduled check: 19 Jan 2027.
- Next decision and prerequisites. Moltex is in administration and Nuclea Energy agreed in August 2026 to buy its technology assets; completion depends on closing conditions, including a UK national-security review. Moltex previously named phase 2 of the CNSC vendor design review, then license applications, as its next regulatory steps. Last checked 23 Oct 2026. Nuclea Energy enters definitive agreement to acquire Moltex Energy's assets; Moltex: our first reactor (Point Lepreau)
What would change this
Closing of the Nuclea transaction, or a new owner's statement on the Point Lepreau plan. Next scheduled check: 21 Jan 2027.
- Permissions and public process. Moltex says it completed phase 1 of the CNSC's pre-licensing vendor design review and would move to phase 2 and then apply for licenses. A vendor design review is not a license, and no site, construction or environmental-assessment application for Point Lepreau is named. Nuclea's August 2026 release says deployment remains subject to regulatory approvals, project agreements and funding. Last checked 23 Oct 2026. Moltex: our first reactor (Point Lepreau); Nuclea Energy enters definitive agreement to acquire Moltex Energy's assets
What would change this
A CNSC license application or provincial EIA registration for an SSR-W at Point Lepreau. Next scheduled check: 21 Jan 2027.
- Site dependencies (land, grid, water). NB Power selected the SSR-W as one of two reactors it intends to build at the Point Lepreau site. The sources describe no plot, grid connection or cooling-water arrangement for this reactor. Last checked 23 Oct 2026. Moltex: our first reactor (Point Lepreau); Nuclea Energy enters definitive agreement to acquire Moltex Energy's assets
What would change this
An NB Power or developer site description, EIA registration or license application. Next scheduled check: 21 Jan 2027.
- Spent fuel, waste and closure. The August 2026 Nuclea release describes work toward possible future deployment of the SSR-W together with the WATSS process, which Moltex presents as recycling used fuel, at the Point Lepreau site. This is a proposed concept subject to regulatory approvals, project agreements and funding; no fuel-recycling agreement, license or arrangement for the reactor's own waste is named. Last checked 23 Oct 2026. Nuclea Energy enters definitive agreement to acquire Moltex Energy's assets
What would change this
A license application, NB Power agreement or EIA registration describing used-fuel supply and waste management. Next scheduled check: 21 Jan 2027.
Evidence dates
(0 of 3 sources with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(3)
- Moltex: our first reactor (Point Lepreau) (company, accessed 2 Oct 2026)
- WNN: Moltex partners in New Brunswick SMR project (news report, accessed 2 Oct 2026)
- Nuclea Energy enters definitive agreement to acquire Moltex Energy's assets (company, accessed 2 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: Moltex SSR-W at Point Lepreau — https://smrmap.com/projects/moltex-ssrw-lepreau/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “Moltex SSR-W at Point Lepreau”. Record reviewed 2 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/moltex-ssrw-lepreau/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.