Kaleidos

DOE describes commercial Kaleidos as a 1.2 MWe high-temperature gas reactor. An INL/NRIC design table gives 3.5 MWth per reactor and helium primary coolant for the Kaleidos design; a March 2026 NRIC presentation separately gives 3.5 MWth for the Kaleidos Demonstration Unit at DOME. These are design and planned test ratings, not achieved output or operating authorization. Gross or net electrical basis is not specified.

Reactor type
High-temperature gas-cooled reactor. How it works, with a 3D view.
Projects
Commissioning: Radiant Kaleidos demonstration at INL DOME. Furthest recorded stage of 4 using this design.
Evidence
4 sources; first primary source: DOE: World's First Microreactor Test Bed Now Open for Business. Record reviewed 9 Oct 2026.
Schematic of HTR-PM, this type's example. On the left, a tall reactor vessel holds a bed of fuel spheres inside a graphite reflector, with fuel tubes above and below.
Schematic of HTR-PM, this type's example.

Key facts

Class
Microreactor
Technology
High-temperature gas-cooled reactor (HTGR)
Coolant
Helium
Developer / vendor(s)
Radiant Industries
Module electrical
1.2 MWe (gross/net unspecified)
Module thermal
3.5 MWth (nameplate; basis unspecified)
Fuel form
TRISO
Enrichment
19.75%
Inclusion basis
Labeled microreactor
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Neutron spectrum (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
9 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(1 without a known value)
Spectrum
Not recorded

Tracked deployment projects

Agreements naming this design (2)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(4)

Evidence and open questions

(2 notes)
  • Evidence review. DOE's 1 July 2025 DOME announcement says Radiant will test the Kaleidos Development Unit to advance its commercial 1.2 megawatt electric high-temperature gas reactor design as a potential replacement for diesel generators, designed to run five years before refuelling. The INL/NRIC February 2024 update (INL/MIS-24-76771) has a column-jumbled design table whose Radiant/Kaleidos row reads HTGR, 3.5 MWth, TRISO at 19.75%, helium primary coolant and graphite moderator, with 1.2 MWe in the power column. NRIC's March 2026 presentation lists the Radiant Kaleidos Demonstration Unit (KDU) at 3.5 MW(th) under DOE authorization at NRIC-DOME, a gas-cooled HALEU TRISO microreactor with helium-turbine electricity generation, with planned dates (PDSA submission 11/17/2025, KDU arrival 4/13/2026, fueling 5/27/2026, criticality 6/18/2026) that are schedule entries, not completion evidence. Deployment link supported: the INL DOME demonstration (the Kaleidos project at DOME); no readable source names Buckley or Fort Benning. The NRIC DOME tenant page returned an access refusal (HTTP 403). Stored vendor, HTGR family, helium coolant, 1.2 MWe (unspecified basis), 3.5 MWth, TRISO and 19.75% stay supported; neutron spectrum stays unknown because no attached readable source states it. Last checked 19 Oct 2026. DOE announces first microreactor experiments for DOME test bed; INL/NRIC Kaleidos design table (February 2024); NRIC presentation on DOME and reactor demonstrations (5 March 2026)
    What would change this

    A dated DOE or INL statement that the KDU reached criticality or completed its DOME test (with achieved power), or a Radiant technical description stating the neutron spectrum. Next scheduled check: 19 Jan 2027.

  • Neutron spectrum: Not disclosed in the reviewed evidence. No readable attached source states the Kaleidos neutron spectrum; the INL table gives only helium coolant and graphite moderator, and NRIC describes a gas-cooled HALEU TRISO microreactor. The NRIC DOME tenant page could not be read (access refused, HTTP 403) and is not expected to be the only source that would answer. Last checked 19 Oct 2026. INL/NRIC Kaleidos design table (February 2024); NRIC presentation on DOME and reactor demonstrations (5 March 2026)
    What would change this

    Attachment of a source that states the spectrum for Kaleidos, such as the NEA SMR Dashboard third edition profile or a Radiant/DOE design description, which would settle thermal versus other. Next scheduled check: 19 Jan 2027.