Projects / United States · Siting

Radiant Kaleidos Buckley Space Force Base proposal

Company reports Air Force / DIU selection for Buckley.

Current status

Stage
Siting
How current
General record check . Bounded evidence review . 1 of 5 listed sources has a publication or document date recorded here: 23 Jul 2026. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

Newest recorded development . Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
23 Jul 2026 · Recorded development: DOE conditional HALEU commitment for the Buckley microreactor. DOE made a conditional commitment on 23 July 2026 to provide high-assay low-enriched uranium to Radiant for its deployment of a microreactor to the Air Force's preferred location, Buckley Space Force Base; DOE will next begin the contracting process. Source: DOE: Energy Department to Distribute Third Round of HALEU to NASA and Radiant (published 23 Jul 2026). Updates entry
More on this development

This is a fuel allocation commitment, not delivery, a site decision or permission.

Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.
Same design
4 tracked: 1 commissioning, 1 siting, 2 announced. 65 tracked at siting across all designs. Recorded stages, not proof of current activity.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
High-temperature gas-cooled reactor. How it works, with a 3D view.
Schematic of HTR-PM, this type's example. On the left, a tall reactor vessel holds a bed of fuel spheres inside a graphite reflector, with fuel tubes above and below.
Schematic of HTR-PM, this type's example.

Description

Delivery by 2028 is a target. Separate from the INL demonstration and from Radiant's Army Janus agreement for 15 Kaleidos reactors (the Army paired Radiant with Fort Benning; Radiant Kaleidos microreactors at Fort Benning (Army Janus)). In April 2026 the Air Force paired Radiant with Buckley Space Force Base under ANPI and named it a selected potential developer and operator; Radiant describes being selected to develop and operate Kaleidos at Buckley. Radiant is not linked as operator because the selection and the site are described as potential. Environmental review is the next step. On 23 July 2026 DOE made a conditional commitment to provide HALEU to Radiant for this Buckley deployment, with contracting to follow; the commitment is a fuel allocation, not delivery, a site decision or permission.

Key facts

Design
Kaleidos (Microreactor)
Technology
High-temperature gas-cooled reactor (HTGR) · helium
Operator(s)
Not recorded
Vendor for linked design
Radiant Industries
Location
Buckley Space Force Base, Aurora · United States · precision: site area (named plant, laboratory, base, port, campus or parcel)
Base-locality point (OSM military airfield) for Buckley SFB, following the Eielson AFB precedent; the microreactor pad is not sited publicly. Geocode: Query 'Buckley Space Force Base' -> military=airfield 'Buckley Space Force Base, 18500, East 6th Avenue, Aurora, Arapahoe County, Colorado, 80011, United States'. Host quote is reputable_press (POWER, 23 Apr 2026); the company page radiantn
Coordinates
39.702689, -104.755979 · site-area point (approximate)
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Labeled microreactor
Confidence
medium
Record reviewed
10 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes

Radiant Kaleidos Buckley Space Force Base proposal is recorded at Buckley Space Force Base, Aurora, Colorado, United States. Operator: No operator is recorded. Recorded vendor: Radiant Industries. Stage: Siting. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: OpenStreetMap Nominatim geocoder, OpenStreetMap Nominatim result: 'Buckley Space Force Base' (military=airfield), Aurora, Colorado

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project. The linked design record states 3.5 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Reactor supplier
Fuel
  • Fuel supplier named for this projectU.S. Department of Energy · sourceDOE is the conditional HALEU allocation authority for Buckley in the July 2026 round; contracting was still to follow. No delivery is established. The earlier Kaleidos allocation is separate.
  • Fuel form stated for KaleidosTRISO
  • Enrichment stated for Kaleidos19.75%
Source-backed project statement

On 23 July 2026 the Department of Energy said it made a conditional commitment to provide high-assay low-enriched uranium for Radiant's deployment of a microreactor to Buckley, the Air Force's preferred location. The same notice says contracting to allocate the material will be initiated and that an earlier Radiant allocation supported the Kaleidos demonstration reactor. The commitment is not delivery or loading, and no quantity for Buckley is stated. DOE: Energy Department to Distribute Third Round of HALEU to NASA and Radiant

Not found in the sources we checked (4): Customer or offtaker; Contractor; Funding and government decisions; Comparable schedule revision
Customer or offtaker

Radiant's 22 April 2026 release and World Nuclear News of 24 April 2026 say the Air Force and the Defense Innovation Unit selected Radiant to develop and operate a microreactor proposed for Buckley Space Force Base to support national-security missions, but they name no power purchase agreement, quantity or terms. The base is the host, and no purchase arrangement is stated. Radiant Buckley selection; WNN: US Air Force announces selections for microreactor deployments

Contractor

Radiant's 22 April 2026 release says the Air Force and the Defense Innovation Unit selected Radiant, the developer, to develop and operate a microreactor proposed for Buckley, with siting and environmental analyses as next steps, and World Nuclear News calls the selected companies potential developers and operators. No separate engineering or construction contractor is named, and no construction award is shown. Radiant Buckley selection; WNN: US Air Force announces selections for microreactor deployments

Funding and government decisions

Radiant's 22 April 2026 release and World Nuclear News of 24 April 2026 state no award, contract value or funding for the Buckley microreactor. Radiant's separate Army Janus agreement belongs to a different project, and DOE's July 2026 HALEU commitment is a fuel allocation, not money. Radiant Buckley selection; WNN: US Air Force announces selections for microreactor deployments

Comparable schedule revision

Comparable schedule revision not established. Radiant's 22 April 2026 release says the first Kaleidos reactors will be delivered by 2028, and both it and World Nuclear News give the ANPI program aim of a reactor operating on an Air Force installation by 2030 or sooner. These are different scopes, each stated once, so no revision of a Buckley milestone is shown. Radiant Buckley selection; WNN: US Air Force announces selections for microreactor deployments

Not recorded in SMRMap's reviewed evidence (3): Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
Operator or intended licensed owner
Site host or owner
Programs and agreements naming the project

Timeline

Recorded developments

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(4 notes, 1 not yet reviewed)
  • Evidence review. Radiant reports an Air Force and DIU selection to develop and operate a microreactor proposed for Buckley Space Force Base, and that the first Kaleidos reactors will be delivered by 2028. The page gives no unit count. Delivery by 2028 is a target. No operator is stored from the company sentence. Last checked 20 Oct 2026. Radiant Buckley selection; WNN: US Air Force announces selections for microreactor deployments; DOE: Energy Department to Distribute Third Round of HALEU to NASA and Radiant
    What would change this

    An Air Force or DIU instrument that names the operator and the number of Buckley units. Next scheduled check: 20 Jan 2027.

  • Next decision and prerequisites. Radiant said on 22 April 2026 that the next steps are siting and environmental analyses under the National Environmental Policy Act, and public meetings that have not yet been announced. Separately, the Department of Energy said on 23 July 2026 that it will initiate contracting to allocate the conditional high-assay uranium. Neither the environmental analysis nor that fuel contract is reported as completed. Last checked 23 Oct 2026. Radiant Buckley selection; DOE: Energy Department to Distribute Third Round of HALEU to NASA and Radiant
    What would change this

    A NEPA scoping notice or decision for Buckley, or a completed HALEU allocation contract. Next scheduled check: 21 Jan 2027.

  • Permissions and public process. Radiant said on 22 April 2026 that the next steps for the Buckley proposal are siting and environmental analyses under the National Environmental Policy Act, and that it will announce public meetings. The 24 April 2026 news report describes the selection of potential developers and operators and does not record an environmental decision. No permit or operating approval is shown. Last checked 23 Oct 2026. Radiant Buckley selection; WNN: US Air Force announces selections for microreactor deployments
    What would change this

    A NEPA decision, or a notice of the Buckley public meetings. Next scheduled check: 21 Jan 2027.

  • Site dependencies (land, grid, water): Not disclosed in the reviewed evidence. Radiant's 22 April 2026 release calls Buckley the proposed location and says siting analyses are still ahead. The Department of Energy's 23 July 2026 notice calls Buckley the Air Force's preferred location for the deployment. Neither page, nor the 24 April 2026 news report, states a land right, grid connection, or water arrangement. Last checked 23 Oct 2026. Radiant Buckley selection; DOE: Energy Department to Distribute Third Round of HALEU to NASA and Radiant
    What would change this

    A land right, grid agreement, or water arrangement for the Buckley deployment. Next scheduled check: 21 Jan 2027.

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(1 of 5 sources with a publication or document date)
Latest dated listed source publication: DOE: Energy Department to Distribute Third Round of HALEU to NASA and Radiant: 23 Jul 2026.Latest dated recorded event: DOE conditional HALEU commitment for the Buckley microreactor: 23 Jul 2026.4 of 5 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(5)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Radiant Kaleidos Buckley Space Force Base proposal — https://smrmap.com/projects/radiant-buckley/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Radiant Kaleidos Buckley Space Force Base proposal”. Record reviewed 10 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/radiant-buckley/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.