Projects / United States · Commissioning

Radiant Kaleidos demonstration at INL DOME

Radiant's Kaleidos Demonstration Unit is a planned 3.5 MWth test experiment in DOE's DOME test bed at Idaho National Laboratory, not a commercial plant or achieved output.

Current status

Stage
Commissioning
How current
General record check . Bounded evidence review . 6 of 14 listed sources have a publication or document date recorded here; the newest is 29 Oct 2026. Status not rechecked since then; the nightly status check covers this project.
Development and review dates

Newest recorded development . Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
Announced 29 Oct 2026 · Announcement: Radiant says DOE approved its Kaleidos safety analysis. Radiant says a DOE Readiness Review comes next, before nuclear operations can begin, with fuel loading and a test campaign to follow. Source: Radiant (29 Oct 2026): DOE approval of the Kaleidos Documented Safety Analysis (published 29 Oct 2026). Updates entry
More on this development

This is Radiant's account, and the DOE document was not opened. No date is given, and no startup or criticality is recorded.

Next dated milestone
No upcoming target date is recorded. Most recent target: Planned step: Jul–Sep 2026 (target). Radiant target: 150-hour continuous full-power run at DOME. Date passed; not recorded as met. Source: radiantnuclear.com: Kaleidos reactor ships from El Segundo to INL (published 12 Aug 2026).
Selected limitations
  • Electrical output is not recorded.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.
  • Expected for this stage but not recorded as a structured fact: Permission evidence appropriate to stage (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions); Construction start evidence (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions); Operation or grid target (type stated) (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Same design
4 tracked: 1 commissioning, 1 siting, 2 announced. 5 tracked at commissioning across all designs. Recorded stages, not proof of current activity.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
High-temperature gas-cooled reactor. How it works, with a 3D view.
Schematic of HTR-PM, this type's example. On the left, a tall reactor vessel holds a bed of fuel spheres inside a graphite reflector, with fuel tubes above and below.
Schematic of HTR-PM, this type's example.

Description

A March 2026 NRIC presentation gave fuel loading, criticality and operation dates as plans; those dates do not prove the steps occurred. DOE conditionally selected Radiant for the first DOME tests on 1 July 2025 and said the company was working through DOE's multi-phase authorization process. Radiant announced on 9 February 2026 that DOE approved its preliminary safety-analysis equivalent, but the DOE approval document was not opened. DOE reported on 8 April 2026 that DOME was complete and that Radiant had started its scheduled year-long test campaign, with initial startup anticipated in the summer. INL’s 30 September 2026 release, in the text KIFI reproduced, reports that Radiant completed the first DOME test. It supplies no completion day, achieved power or scope of completion. Radiant said on 29 October 2026 that DOE had approved its Documented Safety Analysis and that DOE's Readiness Review is the next step before nuclear operations can begin, with fuel loading and a five-phase test campaign, from first criticality to at least 150 hours at full power, to follow a successful review. That is Radiant's account, the DOE approval document was not opened, and the release gives no date for the review, fuel loading or criticality. Read with Radiant's statement, the campaign DOE said had started in April 2026 and the test INL said was completed in September 2026 came before any fuel loading or criticality; neither source states what those steps covered. No final DOE experiment authorization or dated startup or criticality evidence was established; Commissioning is retained. DOE's DOME pages use the word commercial for later licensing of developers' reactors. They do not give Kaleidos a commercial-operation date. DOE's 23 July 2026 HALEU announcement says Radiant previously received HALEU to support the Kaleidos demonstration reactor. Radiant says DOE's earlier HALEU allocation supports the Kaleidos Development Unit test and that Standard Nuclear fabricated the TRISO fuel in Oak Ridge. DOE says applicants fund their own DOME test campaigns. Radiant's earlier target of a 150-hour full-power run in the third quarter of 2026 has passed; its 29 October release still places that run at the end of the campaign and gives no new date.

Key facts

Design
Kaleidos (Microreactor)
Technology
High-temperature gas-cooled reactor (HTGR) · helium
Operator(s)
Not recorded
Vendor for linked design
Radiant Industries
Location
DOME test bed, Idaho National Laboratory · United States · precision: site area (named plant, laboratory, base, port, campus or parcel)
DOE identifies DOME as the repurposed EBR-II containment. This reuses the recorded OpenStreetMap building center 43.59507,−112.65716. The shared facility point is approximate and does not separate reactor positions or establish permission.
Coordinates
43.59507, -112.65716 · site-area point (approximate)
Electrical capacity
Not recorded · scope: module
DOE's July 2026 update lists the Kaleidos Development Unit at 3.5 MWt.
Thermal capacity
3.5 MWth (nameplate; basis unspecified)
Modules planned
1
Purpose
Research or test reactor
Construction start
Not recorded
Inclusion basis
Labeled microreactor
Confidence
medium
Record reviewed
18 Oct 2026Evidence review 19 Oct 2026. How current names both.

Could not be confirmed on . Attempted official source: DOE: Energy Department to Distribute Third Round of HALEU to NASA and Radiant. This is an access or status observation only; the record review date is unchanged.

Site and capacity notes

Radiant Kaleidos demonstration at INL DOME is recorded at DOME test bed, Idaho National Laboratory, Idaho, United States. Operator: No operator is recorded. Recorded vendor: Radiant Industries. Stage: Commissioning. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: OpenStreetMap Nominatim geocoder, OpenStreetMap Nominatim result: building center of the EBR-II containment (DOME) at the Materials and Fuels Complex, 43.59507, −112.65716

Electrical output is not recorded on this project. DOE's July 2026 update lists the Kaleidos Development Unit at 3.5 MWt. Modules planned: 1. Recorded thermal output is 3.5 MWth (nameplate; basis unspecified).

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Reactor supplier
Funding and government decisions

Source-backed project statement DOE's 1 July 2025 article says DOME testing campaigns are self-funded by the applicants, and its 8 April 2026 article lists the ability to self-fund as a sequencing criterion. Radiant is therefore stated to fund its own Kaleidos test campaign. No amount is given. DOE: Energy Department Announces First Microreactor Experiments in DOME Test Bed

Fuel
  • Fuel supplier named for this projectStandard Nuclear · sourceFabricated the TRISO fuel to Radiant's specifications; first tranche received at DOME on 1 July 2026.
  • Fuel supplier named for this projectU.S. Department of Energy · sourceDOE says Radiant previously received HALEU to support Kaleidos (stated 23 July 2026).
  • Fuel form stated for KaleidosTRISO
  • Enrichment stated for Kaleidos19.75%
Source-backed project statement

Radiant's 1 July 2026 release says it received its first tranche of TRISO fuel at the DOME facility, fabricated by Standard Nuclear in Oak Ridge to Radiant's specifications for the Kaleidos reactor. DOE said on 23 July 2026 that Radiant had previously received HALEU to support Kaleidos. Fuel loading is not confirmed in the sources read. radiantnuclear.com: Radiant receives first TRISO fuel tranche at INL's DOME facility; DOE: Energy Department to Distribute Third Round of HALEU to NASA and Radiant

Site host or owner
Programs and agreements naming the project
Not found in the sources we checked (3): Customer or offtaker; Contractor; Comparable schedule revision
Customer or offtaker

DOE's July 2025 and April 2026 articles describe the Kaleidos Demonstration Unit as a self-funded test campaign in DOE's DOME test bed at Idaho National Laboratory. They name no buyer of its electricity or heat, and DOE's pages use the word commercial only for later licensing of developers' reactors. DOE: World's First Microreactor Test Bed Now Open for Business

Contractor

DOE's July 2025 selection article and April 2026 opening article describe Radiant testing its Kaleidos unit in DOME, a DOE test bed at Idaho National Laboratory. They name no engineering or construction contractor for the Kaleidos demonstration, and INL is recorded as the site host. DOE: Energy Department Announces First Microreactor Experiments in DOME Test Bed

Comparable schedule revision

Comparable schedule revision not established. DOE said on 1 July 2025 that DOME's first fueled reactor experiment would start as early as spring 2026, without naming which developer, and on 8 April 2026 that Kaleidos's initial startup was anticipated in the summer. The 2025 statement is an earliest date, not a target that the 2026 statement moves, and the record's events hold no revision pair. DOE: Energy Department Announces First Microreactor Experiments in DOME Test Bed; DOE: World's First Microreactor Test Bed Now Open for Business

Not recorded in SMRMap's reviewed evidence (2): Project proposer or applicant; Operator or intended licensed owner
Project proposer or applicant
No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
Operator or intended licensed owner
Reviewed 19 Oct 2026: not disclosed in the reviewed evidence.

Timeline

Recorded developments

Earlier developments (2)

Targets

Planned, target and estimated dates are not achievements or commitments.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(11 notes)

Evidence dates

(6 of 14 sources with a publication or document date)
Latest dated listed source publication: Radiant (29 Oct 2026): DOE approval of the Kaleidos Documented Safety Analysis: 29 Oct 2026.Latest dated recorded event: Radiant announces DOE approval of the Kaleidos Documented Safety Analysis: 29 Oct 2026.8 of 14 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(14)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Radiant Kaleidos demonstration at INL DOME — https://smrmap.com/projects/radiant-kaleidos-inl/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Radiant Kaleidos demonstration at INL DOME”. Record reviewed 18 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-15. https://smrmap.com/projects/radiant-kaleidos-inl/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.