KP-FHR commercial plant

Kairos Power's commercial fluoride-salt-cooled high-temperature reactor concept, distinct from the Hermes demonstrations. Kairos's contribution to the June 2025 IAEA catalog gives a conceptual reactor-design rating of 320 MWth / 140 MWe, without a gross/net electrical basis, and describes the first commercial KP-X as 140 MWe. That chapter describes a single core and vessel and does not establish a multi-reactor plant layout. Kairos's section of the September 2026 catalog lists 376 MWth / 150 MWe (2 x 75 MWe) and describes a minimum KP-150 configuration of two reactors with a shared power-conversion system generating up to 150 MWe. It does not say whether 376 MWth is one reactor or the pair, or whether the electrical figures are gross or net. Both editions are contributor material, not official IAEA reviews. The recorded rating is the June 2025 single-core figure, and neither edition establishes a RELLIS campus total.

Reactor type
Fluoride salt-cooled high-temperature reactor. How it works, with a 3D view.
Projects
Siting: Kairos commercial proposal at Texas A&M-RELLIS. Development status as stated: Conceptual design.
Evidence
4 sources; first primary source: Texas A&M System Goes Nuclear. Record reviewed 1 Oct 2026.
Schematic of KP-FHR commercial plant. On the left, a reactor vessel holds a graphite reflector around a bed of fuel pebbles, with control and shutdown elements coming down from above and pebble tubes at the top and bottom.
Schematic of KP-FHR commercial plant.

Key facts

Class
SMR
Technology
Fluoride-salt-cooled high-temperature reactor (FHR)
Coolant
Molten salt
Spectrum
Thermal
Developer / vendor(s)
Kairos Power
Module electrical
140 MWe (gross/net unspecified)
Module thermal
320 MWth (nameplate; basis unspecified)
Fuel form
TRISO particles in graphite pebble matrix / pebble bed
Development status (as stated)
Conceptual design
Reactor vessel
7.2 m tall, 3.9 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 349.150 MWe stays a two-reactor block and is not one module The electrical output stated for two reactors is not assigned to this one vessel.SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
All vessels to scale
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
1 Oct 2026 (record review date, not proof of current availability or a deployment)

Tracked deployment projects

Agreements naming this design (1)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(4)

Evidence and open questions

(2 notes)
  • Evidence review. Kairos Power's commercial KP-FHR contribution to the June 2025 IAEA catalog describes a single-core, single-vessel conceptual reactor with pebble TRISO fuel, Flibe coolant and graphite moderator. Its reactor-design capacity table gives 320 MWth / 140 MWe and separately identifies KP-X as a first commercial 140 MWe plant. Gross/net and multi-reactor plant layout are unspecified in that edition. Kairos's section of the 2026 catalog (printed September 2026; contributor material, not an official IAEA review) lists 376 MWth / 150 MWe (2 x 75 MWe), and describes a minimum KP-150 configuration of one power block with two reactors and a shared power-conversion system generating up to 150 MWe, and a KP-450 of six reactors generating a combined 450 MWe. That section does not use the name KP-X, state gross or net, or say whether 376 MWth is per reactor or for the pair. The stored 320 MWth and 140 MWe stay as the June 2025 figures because the rating fields read per module: 150 MWe is a two-reactor figure, and 376 MWth has no stated scope. Hermes is a separate 35 MWth non-power demonstration; these figures are not Hermes ratings or a RELLIS campus total. The values are a dated designer-supplied conceptual description, not an IAEA certification or achieved output. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition); IAEA ARIS design record: KP-FHR commercial plant; Texas A&M System Goes Nuclear; Small Modular Reactor Technology Catalogue, 2026 edition (contributor material; printed September 2026)
    What would change this

    A Kairos design-control document or later catalog edition that states the commercial reactor's own thermal and electrical output and whether the electrical figure is gross or net. Next scheduled check: 19 Jan 2027.

  • Module rating. The commercial KP-FHR chapter's single-core reactor-design table gives 320 MWth / 140 MWe, and KP-X is described as 140 MWe. These dated conceptual reactor figures are stored without a gross/net basis, and that edition does not establish a multi-reactor plant layout or aggregate deployment capacity. Kairos's section of the 2026 catalog lists 376 MWth / 150 MWe (2 x 75 MWe), and its text gives up to 150 MWe for a block of two reactors. It does not say whether 376 MWth is per reactor or for the pair, so the 2025 figures stay stored with their edition rather than being replaced. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition); Small Modular Reactor Technology Catalogue, 2026 edition (contributor material; printed September 2026)
    What would change this

    A Kairos safety analysis or catalog revision that states gross or net electrical output for the commercial module. Next scheduled check: 19 Jan 2027.