Kairos Power

Developer of the KP-FHR. Hermes 1 and Hermes 2 at Oak Ridge have NRC construction permits. A separate RELLIS commercial proposal was announced in February 2025 and is not those Oak Ridge reactors. On 7 October 2026 Kairos reported commissioning an automated fuel-pebble inspection and laser-marking system at its Albuquerque Manufacturing Development Campus. The system supports traceability for hardware testing and future Hermes 2 work. It does not establish reactor commissioning, fuel loading or fuel qualification.

Projects
Construction: 2 projects. Furthest recorded stage of 3 as vendor, developer or operator. 2 designs.
Evidence
3 sources; first primary source: NRC Kairos Hermes construction permit materials. Record reviewed 1 Oct 2026.

Key facts

Organization type
Reactor developer, Vendor
Category
vendor
Country
United States
Aliases
Kairos
Ownership / control
Unknown
Listing status and ownership are not stated in the cited sources. The earlier privately held classification had no listing citation; on 9 November 2026 none of this profile's three cited sources said whether the company is listed or privately held, so the classification was withdrawn rather than inferred.
Website
https://kairospower.com/
Confidence
high
Record reviewed
1 Oct 2026 (record review date, not proof of current activity)

All fields

(2 without a known value)
Listing status
Unknown (no listing is recorded here; this does not mean the organization is private)
Exchange / ticker
None recorded in this release

Linked designs

Tracked deployment projects

3 linked project records: 1 siting, 2 construction, counting every project that names this organization in any recorded role (vendor, operator or participant); the developer table counts only projects that use its designs. These include proposals and historical canceled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.

Agreements (1)

Agreements, plans, studies and government programs that name this organization as a participant. They are not deployment projects and are not counted above.

Ownership & relationships

Milestones

Organization-level unresolved information

Sources

(3)