KRONOS MMR

NANO Nuclear describes KRONOS as a helium-cooled, TRISO-fueled microreactor. NRC lists a 45 MWth power level for the University of Illinois research-reactor application using KRONOS technology. That is the proposed research configuration, not proof of electricity output or permission to operate; no electrical rating is assigned. The NIA's 5 MW label is not used here.

Reactor type
High-temperature gas-cooled reactor. How it works, with a 3D view.
Projects
Licensing: University of Illinois KRONOS MMR. Furthest recorded stage of 2 using this design.
Evidence
3 sources; first primary source: NANO Nuclear and University of Illinois KRONOS memorandum. Record reviewed 8 Oct 2026.
Schematic of HTR-PM, this type's example. On the left, a tall reactor vessel holds a bed of fuel spheres inside a graphite reflector, with fuel tubes above and below.
Schematic of HTR-PM, this type's example.

Key facts

Class
Microreactor
Technology
High-temperature gas-cooled reactor (HTGR)
Coolant
Helium
Spectrum
Thermal
Developer / vendor(s)
NANO Nuclear Energy
Module thermal
45 MWth (nameplate; basis unspecified)
Fuel form
UCO TRISO particles in annular ceramic-matrix pellets
Enrichment
9.9-20% (developer, as stated)
Inclusion basis
Labeled microreactor
Confidence
medium
Record reviewed
8 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(1 without a known value)
Module electrical
Not recorded

Tracked deployment projects

Agreements naming this design (3)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(3)

Evidence and open questions

(1 note)
  • Evidence review. The NRC page for the University of Illinois Urbana-Champaign KRONOS Micro Modular Reactor (last reviewed 14 September 2026) describes a construction permit application for a research reactor in Champaign County that would be based on NANO Nuclear Energy Inc. technology. The NRC lists it as a high-temperature gas-cooled reactor at a 45 MWth power level, with TRISO particles in annular ceramic-matrix pellets and inert helium primary coolant feeding a molten-salt thermal energy storage system. NRC milestones show the application tendered 31 March 2026, the acceptance review complete 18 May 2026 and the schedule letter issued 16 June 2026; the final safety evaluation (September 2027) is a target and no permit is issued. NANO Nuclear's undated KRONOS page describes a stationary system for process heat and/or electricity producing up to 45 MWth in a single-unit configuration and lists 3.5-15 MWe and 10-45 MWth ranges; it still calls the design in construction permit pre-application, which is older than the NRC milestones. The sources connect the design to the linked University of Illinois project; no opened source names the BaRupOn Liberty deployment. Stored vendor, HTGR family, helium coolant, 45 MWth and TRISO fuel stay supported; the stored thermal neutron spectrum is not stated in any opened source, and the developer's MWe range is deliberately not stored as a single rating. Last checked 19 Oct 2026. NRC: University of Illinois Urbana-Champaign KRONOS MMR construction permit application; nanonuclearenergy.com: KRONOS MMR
    What would change this

    The NRC draft safety evaluation and draft environmental assessment for the University of Illinois KRONOS construction permit application (targeted February 2027), which would confirm the reviewed configuration and could state an electrical rating or spectrum. Next scheduled check: 19 Jan 2027.

Regulatory actions

Compare reviews and approvals across designs

Construction applications and decisions