Projects / United States · Licensing

University of Illinois KRONOS MMR

One research reactor proposed for the University of Illinois campus in Champaign, using NANO Nuclear KRONOS MMR technology.

Current status

Stage
Licensing
How current
General record check . Bounded evidence review . 6 of 16 listed sources have a publication or document date recorded here; the newest is 27 Oct 2026. NRC construction permit application for the University of Illinois KRONOS MMR: status (under review) confirmed against NRC: University of Illinois Urbana-Champaign KRONOS MMR construction permit application.
Development and review dates

Newest recorded development . Next general check: . Next evidence or detail review: .

Permissions
Under review: NRC construction permit application for the University of Illinois KRONOS MMR. An application under review is not a permit. All permissions and applications
Latest development
Announced 27 Oct 2026 · Announcement: NANO Nuclear announces a memorandum with Hyundai Engineering on KRONOS. NANO Nuclear said it signed a memorandum of understanding with Hyundai Engineering Co., Ltd. as a framework for potential collaboration on the University of Illinois reactor. Source: NANO Nuclear Energy (27 Oct 2026): memorandum with Hyundai Engineering on the KRONOS MMR project (published 27 Oct 2026). Updates entry
More on this development

A larger role depends on later evaluation and separate agreements. NANO says it awards no work package and commits neither party to funding or construction. It is not a construction contract.

Next dated milestone
Planned step: Feb 2027 (target). NRC target for a draft KRONOS safety evaluation. This is not an achieved milestone. Source: NRC: University of Illinois Urbana-Champaign KRONOS MMR construction permit application.
Selected limitations
  • Electrical output is not recorded.
Same design
2 tracked: 1 licensing, 1 announced. 19 tracked at licensing across all designs. Recorded stages, not proof of current activity.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
High-temperature gas-cooled reactor. How it works, with a 3D view.
Schematic of HTR-PM, this type's example. On the left, a tall reactor vessel holds a bed of fuel spheres inside a graphite reflector, with fuel tubes above and below.
Schematic of HTR-PM, this type's example.

Description

The NRC application page, last reviewed 14 September 2026, states a power level of 45 MWth, TRISO fuel in a ceramic matrix, and inert helium as the primary coolant, with a molten-salt thermal energy storage system. The university filed the construction permit application by letter dated 27 March 2026 (tendered 31 March); the NRC docketed it on 18 May 2026 as Docket No. 50-618 and issued a review schedule on 16 June 2026. The university says it is applying for a license to construct and operate the reactor, so it is recorded as the intended operator; NANO's December 2025 release says the university would assume ownership only after construction, licensing and operation, and that ownership timing stays a company statement. Draft and final safety evaluations are targeted for February 2027 and September 2027, and the draft and final environmental assessments for February 2027 and May 2027; those are targets, not decisions. No MWe is stated, and no construction permit has been issued.

Key facts

Design
KRONOS MMR (Microreactor)
Technology
High-temperature gas-cooled reactor (HTGR) · helium
Operator(s)
University of Illinois Urbana-Champaign
Vendor for linked design
NANO Nuclear Energy
Location
University of Illinois Urbana-Champaign campus · United States · precision: exact reactor or pad point
University-published placemark for the 'Proposed Reactor Site (East Site)', about 0.1 mile from Abbott Power Plant; it is an official map point, not a surveyed parcel boundary.
Coordinates
40.104624, -88.241184 · exact point
Electrical capacity
Not recorded · scope: module
Thermal capacity
45 MWth (nameplate; basis unspecified)
Modules planned
1
Inclusion basis
Labeled microreactor
Confidence
medium
Record reviewed
18 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes

University of Illinois KRONOS MMR is recorded at University of Illinois Urbana-Champaign campus, Illinois, United States. Operator: University of Illinois Urbana-Champaign. Recorded vendor: NANO Nuclear Energy. Stage: Licensing. Location precision: exact reactor or pad point; exact point.

Coordinate source: UIUC NPRE: Illinois Microreactor Project maps, University map placemark 'Proposed Reactor Site (East Site)'

Electrical output is not recorded on this project. Modules planned: 1. Recorded thermal output is 45 MWth (nameplate; basis unspecified).

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Operator or intended licensed owner
Reactor supplier
Contractor

Source-backed project statement NANO Nuclear's October 2025 release on the start of drilling at the University of Illinois site highlights site characterization and geotechnical work performed by AECOM for the KRONOS project. This is site-investigation engineering before the construction permit application, not a construction appointment. Hatch and PCL are mentioned only as showing interest. NANO Nuclear said on 27 October 2026 that it signed a memorandum of understanding with Hyundai Engineering Co., Ltd. as a framework for potential collaboration on project-execution planning and site-related work. It says compensated work would need a separate definitive agreement, so this is not a construction appointment. NANO Nuclear Holds Milestone Ceremony to Mark Beginning of Drilling Work for First KRONOS MMR™ Energy System in Partnership with University of Illinois | NANO N; NANO Nuclear Energy (27 Oct 2026): memorandum with Hyundai Engineering on the KRONOS MMR project

Fuel
  • Fuel form stated for KRONOS MMRUCO TRISO particles in annular ceramic-matrix pellets
  • Enrichment stated for KRONOS MMR9.9-20% (developer, as stated)
No project-specific fuel supply arrangement is recorded as a structured fact.

The NRC's KRONOS application page and the university's project page describe TRISO fuel in a ceramic matrix. The applicant's environmental report assumes that, before startup, new fuel will arrive by truck from either Richland, Washington (Framatome), or Lynchburg, Virginia (BWXT). These are assumed shipping origins for the environmental analysis; the passage does not establish a selected supplier or fabricator, a supply award, or a committed delivery. UIUC NPRE: Illinois Microreactor Project licensing information; University of Illinois KRONOS environmental report: operational activities forecast

Not found in the sources we checked (3): Customer or offtaker; Funding and government decisions; Comparable schedule revision
Customer or offtaker

The NRC's KRONOS application page and the university's Illinois Microreactor Project page describe a 45 MWth campus research reactor, which the university is applying to construct and operate. They name no buyer or user of its power or heat. UIUC NPRE: Illinois Microreactor Project licensing information

Funding and government decisions

NANO Nuclear's October 2025 drilling release names the university, AECOM, the State of Illinois and expected strategic partners as collaborators, and the university's project page describes the license application. Neither states who pays for the reactor or any grant or amount. NANO Nuclear Holds Milestone Ceremony to Mark Beginning of Drilling Work for First KRONOS MMR™ Energy System in Partnership with University of Illinois | NANO N

Comparable schedule revision

Comparable schedule revision not established. The developer's filings preserve a qualified wording history, without establishing a comparable schedule revision. NANO Nuclear's Form 10-K signed 18 December 2025 describes a full-scale KRONOS system expected to be fully operational and licensed by 2030. The same 10-K also says there is no definitive timeline for demonstration, licensing and commercial launch. Its Form 10-Q signed 17 February 2026 instead forecasts initial operation or research availability around 2030 to 2031, subject to NRC review, safety and environmental reviews, construction and commissioning. The forms signed 14 May and 12 August 2026 use around 2030 for that conditional initial-operation or research-availability forecast. The applicant's environmental report separately expects operational activities in approximately 2030. The different scope and approximate wording do not establish a clean delay, acceleration, current commitment or reason for a change. The earlier USNC reactor's 2026 deployment forecast concerns an earlier configuration and is not directly paired with the current KRONOS forecast; reported thermal-rating changes are separate identity facts. US university plans to build microreactor - World Nuclear News; UIUC NPRE: Illinois Microreactor Project construction permit application; NANO Nuclear Form 10-K signed 18 December 2025: KRONOS forecasts; NANO Nuclear Form 10-Q signed 17 February 2026: KRONOS forecast; NANO Nuclear Form 10-Q signed 14 May 2026: KRONOS forecast; NANO Nuclear Form 10-Q signed 12 August 2026: KRONOS forecast; University of Illinois KRONOS environmental report: operational activities forecast

Not recorded in SMRMap's reviewed evidence (2): Site host or owner; Programs and agreements naming the project
Site host or owner
Programs and agreements naming the project

Timeline

Recorded developments

Targets

Planned, target and estimated dates are not achievements or commitments.

Permissions and applications

Construction applications and decisions

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(5 notes)
  • Evidence review. The source review uses the NRC page for a construction-permit application for a research reactor, submitted 31 March 2026, with 45 MWth, TRISO fuel in a ceramic matrix and inert helium as the primary coolant, and it says the sentences then read did not print a docket number. The stored 45 MWth module figure and the licensing stage stay. The same NRC page places the project in Champaign County, Illinois, says the staff is reviewing the University of Illinois Urbana-Champaign application, and says the KRONOS MMR would be based on NANO Nuclear Energy technology and built in that county. Its milestone table marks as actual the tender on 31 March 2026, the docketing decision on 18 May 2026 and the schedule letter on 16 June 2026. Draft and final safety evaluations are targets for February 2027 and September 2027. The table still does not print a docket number in the lines read. The university says it is applying for a license to construct and operate a research reactor on campus and that it is partnering with NANO Nuclear. ANS reports a design figure of up to 15 MWe (45 MWt); that electrical ceiling is not on the NRC power-level line and is not stored. Two Federal Register captures are access-request pages and are not quoted. The NANO release capture is a permission block and is not quoted. Last checked 20 Oct 2026. NRC: University of Illinois Urbana-Champaign KRONOS MMR construction permit application; UIUC NPRE: Illinois Microreactor Project licensing information; ANS: UIUC submits MMR construction permit application
    What would change this

    The NRC draft safety evaluation, targeted for February 2027, or a construction-permit decision for the University of Illinois KRONOS MMR. Next scheduled check: 20 Jan 2027.

  • Next decision and prerequisites. The NRC's schedule targets a draft safety evaluation and draft environmental assessment in February 2027, a final environmental assessment in May 2027 and a final safety evaluation in September 2027, ahead of a decision on the University of Illinois construction permit. These are targets, not decisions. The university says the NRC must approve the project before licenses to build and to operate the reactor are issued. Last checked 23 Oct 2026. NRC: University of Illinois Urbana-Champaign KRONOS MMR construction permit application; UIUC NPRE: Illinois Microreactor Project licensing information
    What would change this

    The NRC draft safety evaluation or environmental assessment, a revised NRC schedule, or the construction permit decision. Next scheduled check: 23 Mar 2027.

  • Permissions and public process. The NRC's project page, last updated 14 September 2026, shows the University of Illinois's construction permit application for a KRONOS research reactor was tendered on 31 March 2026, accepted for docketing on 18 May 2026 and given a review schedule on 16 June 2026. The NRC is preparing an environmental assessment, with the draft targeted for February 2027. No construction permit or operating license has been issued; the page does not describe a hearing or comment period. Last checked 23 Oct 2026. NRC: University of Illinois Urbana-Champaign KRONOS MMR construction permit application
    What would change this

    Publication of the NRC draft environmental assessment or a construction permit decision for the KRONOS research reactor. Next scheduled check: 7 Mar 2027.

  • Site dependencies (land, grid, water). The University of Illinois's project-locations page says the whole state was screened, the Urbana-Champaign campus was chosen, and four candidate campus sites were evaluated before a proposed site was selected; one stated goal is connecting the reactor to an existing non-nuclear facility. The NRC page places the reactor in Champaign County. These pages do not name the connected facility or describe a grid, cooling-water or land arrangement. Last checked 23 Oct 2026. UIUC NPRE: Illinois Microreactor Project maps; NRC: University of Illinois Urbana-Champaign KRONOS MMR construction permit application
    What would change this

    The NRC environmental assessment or a university document naming the proposed site's utility connections. Next scheduled check: 23 Mar 2027.

  • Spent fuel, waste and closure. The university's licensing-information page says the reactor's fuel will be pursued through DOE's University Fuel Services Program, under which DOE keeps ownership and leases fuel for research-reactor use, and that spent fuel is returned to DOE for disposal at the end of the reactor's life. This is the university's stated plan; the page does not show a signed fuel lease or DOE acceptance agreement for this reactor. Last checked 23 Oct 2026. UIUC NPRE: Illinois Microreactor Project licensing information
    What would change this

    A DOE or university document confirming a fuel lease for the KRONOS reactor, or the NRC safety or environmental review addressing spent fuel. Next scheduled check: 23 Mar 2027.

Evidence dates

(6 of 16 sources with a publication or document date)
Latest dated listed source publication: NANO Nuclear Energy (27 Oct 2026): memorandum with Hyundai Engineering on the KRONOS MMR project: 27 Oct 2026.Latest dated listed source document: NANO Nuclear Form 10-Q signed 12 August 2026: KRONOS forecast: 12 Aug 2026.Latest dated recorded event: NANO Nuclear announces a memorandum with Hyundai Engineering on KRONOS at the University of Illinois: 27 Oct 2026.10 of 16 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(16)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: University of Illinois KRONOS MMR — https://smrmap.com/projects/university-of-illinois-kronos/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “University of Illinois KRONOS MMR”. Record reviewed 18 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/university-of-illinois-kronos/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.