Projects / United States · Announced

BaRupOn's anticipated KRONOS MMR deployment at its Liberty, Texas campus (feasibility stage)

BaRupOn signed a paid feasibility study agreement with NANO Nuclear in November 2025 to evaluate siting many KRONOS MMR units on its campus in Liberty, Texas, toward 1 GW.

Current status

Stage
Announced
How current
General record check . Bounded evidence review . The listed source has no publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.
Same design
2 tracked: 1 licensing, 1 announced. 96 tracked at announced across all designs. Recorded stages, not proof of current activity.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
High-temperature gas-cooled reactor. How it works, with a 3D view.
Schematic of HTR-PM, this type's example. On the left, a tall reactor vessel holds a bed of fuel spheres inside a graphite reflector, with fuel tubes above and below.
Schematic of HTR-PM, this type's example.

Description

BaRupOn is developing the campus, the 701-acre Liberty American Multi-Sourced Power (LAMP) and Innovation Hub. NANO's announcement states that BaRupOn anticipates deploying the units at the site and is willing to co-invest in their construction once the study succeeds; that conditional, host-stated deployment intent is why this is listed as a proposal rather than a study. No order, unit count, license application or construction decision is established, and the 1 GW figure is a campus goal, not a plant.

Key facts

Design
KRONOS MMR (Microreactor)
Technology
High-temperature gas-cooled reactor (HTGR) · helium
Operator(s)
Not recorded
Vendor for linked design
NANO Nuclear Energy
Location
BaRupOn LAMP hub, Liberty · United States · precision: town or locality only
Town point from the Wikipedia article for Liberty, Texas; NANO names BaRupOn's 701-acre LAMP campus in Liberty. No parcel point is published, so this is a town-level point.
Coordinates
30.05931, -94.79603 · town-level point (approximate)
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Labeled microreactor
Confidence
medium
Record reviewed
3 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

BaRupOn's anticipated KRONOS MMR deployment at its Liberty, Texas campus (feasibility stage) is recorded at BaRupOn LAMP hub, Liberty, Texas, United States. Operator: No operator is recorded. Recorded vendor: NANO Nuclear Energy. Stage: Announced. Location precision: town or locality only; town-level point (approximate).

Coordinate source: Wikipedia: Liberty, Texas (article coordinates), Article coordinate 30.05931, -94.79603 on 'Liberty, Texas', read 30 October 2026

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project. The linked design record states 45 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Reactor supplier
Customer or offtaker

Source-backed project statement NANO Nuclear's 24 November 2025 announcement says the feasibility study would evaluate KRONOS units supplying 1 GW to BaRupOn's LAMP hub in Liberty, Texas, and that the arrangement would let the LAMP data center campus secure on-site nuclear power. The intended recipient is BaRupOn's own campus, which is prospective and subject to the study. No power purchase agreement, quantity under contract or tenant buyer is named. NANO Nuclear announces 1 GW feasibility study with BaRupOn

Funding and government decisions

Source-backed project statement NANO Nuclear's 24 November 2025 announcement says BaRupOn will pay NANO Nuclear for completing the Liberty feasibility assessment and has expressed willingness to co-invest directly in building the microreactors at its site after a successful assessment. The study phase is host-funded with no amount stated, and construction co-investment is conditional and uncommitted. NANO Nuclear announces 1 GW feasibility study with BaRupOn

Fuel
  • Fuel form stated for KRONOS MMRUCO TRISO particles in annular ceramic-matrix pellets
  • Enrichment stated for KRONOS MMR9.9-20% (developer, as stated)
No project-specific fuel supply arrangement is recorded as a structured fact.

NANO Nuclear's 24 November 2025 announcement describes the KRONOS MMR as using helium coolant and TRISO fuel and lists a fuel subsidiary, HALEU Energy Fuel Inc., among its businesses. These are design and company descriptions. The announcement names no fuel supplier, quantity or delivery for Liberty. NANO Nuclear announces 1 GW feasibility study with BaRupOn

Not found in the sources we checked (2): Contractor; Comparable schedule revision
Contractor

NANO Nuclear's 24 November 2025 announcement says BaRupOn signed a paid feasibility study agreement with NANO Nuclear to evaluate siting many KRONOS units on its Liberty campus. NANO Nuclear is the reactor vendor, so its study is not a separate contractor appointment. The announcement names no engineering or construction contractor for Liberty. NANO Nuclear announces 1 GW feasibility study with BaRupOn

Comparable schedule revision

Comparable schedule revision not established. NANO Nuclear's 24 November 2025 announcement dates only the feasibility agreement and gives no study completion, construction or operation date for Liberty. With no dated target there is nothing to revise. NANO Nuclear announces 1 GW feasibility study with BaRupOn

Not recorded in SMRMap's reviewed evidence (4): Project proposer or applicant; Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
Project proposer or applicant
No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
Operator or intended licensed owner
Site host or owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(5 notes, 1 not yet reviewed)
  • Evidence review. NANO's 24 November 2025 announcement describes a paid KRONOS MMR feasibility study for BaRupOn's 701-acre LAMP campus in Liberty, Texas. The 1 GW is an evaluation/campus goal, not a selected reactor plant rating or a module count. BaRupOn's deployment and co-investment intentions depend on a successful assessment. No reactor order, operating entity, construction contract or permission is established by the announcement. Last checked 19 Oct 2026. NANO Nuclear announces 1 GW feasibility study with BaRupOn
    What would change this

    The feasibility outcome and a definitive project agreement identifying the selected configuration, reactor plot, operator and financial commitments. Next scheduled check: 19 Jan 2027.

  • Site location recorded as disclosed: Not disclosed in the reviewed evidence. The 701-acre Liberty campus is named, but the reactor boundary and siting assessment remain undisclosed; no reactor coordinates are inferred; the map uses a town-level point for Liberty. Last checked 19 Oct 2026. NANO Nuclear announces 1 GW feasibility study with BaRupOn
    What would change this

    The feasibility outcome and a definitive project agreement identifying the selected configuration, reactor plot, operator and financial commitments. Next scheduled check: 19 Jan 2027.

  • Next decision and prerequisites. The next step is completion of the paid feasibility assessment; the November 2025 release says BaRupOn is willing to co-invest in building the microreactors after a successful assessment. No completion date, investment decision or licensing step is given. Last checked 23 Oct 2026. NANO Nuclear announces 1 GW feasibility study with BaRupOn
    What would change this

    Publication of the feasibility result or a co-investment agreement. Next scheduled check: 21 Jan 2027.

  • Permissions and public process: Not disclosed in the reviewed evidence. The November 2025 NANO Nuclear release announces a paid feasibility study for KRONOS units on BaRupOn's Liberty, Texas campus. It names no NRC application, state permit or public consultation for the project. Last checked 23 Oct 2026. NANO Nuclear announces 1 GW feasibility study with BaRupOn
    What would change this

    An NRC pre-application or license record, or a local permit, for reactors on the LAMP campus. Next scheduled check: 21 Jan 2027.

  • Site dependencies (land, grid, water). The study concerns BaRupOn's 701-acre LAMP campus in development in Liberty, Texas, and will assess power demand, reactor integration and the suitability of land and site access. It is a feasibility study; no plot, grid connection or water arrangement is identified. Last checked 23 Oct 2026. NANO Nuclear announces 1 GW feasibility study with BaRupOn
    What would change this

    The completed feasibility study or a site agreement naming land, grid and water for the reactors. Next scheduled check: 21 Jan 2027.

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(0 of 1 source with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated recorded event: no date recorded.1 of 1 listed source has no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(1)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: BaRupOn's anticipated KRONOS MMR deployment at its Liberty, Texas campus (feasibility stage) — https://smrmap.com/projects/nano-barupon-liberty/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “BaRupOn's anticipated KRONOS MMR deployment at its Liberty, Texas campus (feasibility stage)”. Record reviewed 3 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/nano-barupon-liberty/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.