RITM-200S

Floating-plant variant of RITM-200 series (~55–58 MWe per module) for PEB-106 / Baim FNPP.

Reactor type
Integral pressurized water reactor. How it works, with a 3D view.
Projects
Construction: Baim / Cape Nagloynyn floating PEB-106 (RITM-200S). Furthest recorded stage of 2 using this design.
Evidence
3 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 1 Oct 2026.
Schematic of CAREM-25, this type's example. A single pressure vessel holds the core below helical steam generators, with a steam dome at the top.
Schematic of CAREM-25, this type's example.

Key facts

Class
SMR
Technology
Integral pressurized water reactor (iPWR)
The NEA SMR Dashboard describes the RITM-200S as an integral pressurised water reactor for floating nuclear power plants.
Coolant
Light water
Spectrum
Thermal
Developer / vendor(s)
Rosatom, Afrikantov OKBM
Module electrical
58 MWe (gross)
Module thermal
190 MWth (nameplate; basis unspecified)
Inclusion basis
SMR by design class
Confidence
low
Record reviewed
1 Oct 2026 (record review date, not proof of current availability or a deployment)

Tracked deployment projects

Design sources

(3)

Evidence and open questions

(2 notes)
  • Evidence review. Nuclear Engineering International (28 May 2026) reports that ZiO-Podolsk, part of Rosatom's Mechanical Engineering Division, completed the first RITM-200S reactor unit for the lead PEB-106 floating power unit of the Baim project, that the reactor plant is developed by OKBM Afrikantov, and that each PEB-106 carries two RITM-200S units with an electrical capacity of 58 MW each, a modification of the icebreaker RITM-200. The Barents Observer (27 May 2026, reporting a Rosatom Telegram announcement) calls the RITM-200S a next-generation small modular reactor for floating nuclear power plants and says the power-plant version has about 198 MWth, against about 175 MWth for the icebreaker model. Both sources tie the design to the four floating units for the Baimskaya ore zone at Cape Nagloynyn in Chukotka, with the first unit scheduled for commissioning in 2028 (NEI) and all four to be delivered by 2031 (Barents); neither names the Gazprom Kirinskoye floating unit. Neither source states the coolant, neutron spectrum or reactor family in words; the stored iPWR, light-water and thermal values rest on the RITM-200 lineage, not on the sources read for this review. The stored 58 MWe is supported but its 'gross' basis is not stated, and the stored 190 MWth is not supported: the only opened figure is about 198 MWth. Last checked 19 Oct 2026. NEI: First RITM for Baim FNPP manufactured; Barents Observer: RITM-200S for Arctic floating plants
    What would change this

    A Rosatom or OKBM Afrikantov technical description of the RITM-200S (or an IAEA booklet edition entry) stating the coolant, the per-reactor thermal rating and the gross or net basis of the 58 MW electrical figure. Next scheduled check: 19 Jan 2027.

  • Technology family. The NEA SMR Dashboard describes the RITM-200S as an integral pressurised water reactor for floating nuclear power plants. Last checked 1 Nov 2026. NEA Small Modular Reactor Dashboard — Third Edition (2025); NEI: First RITM for Baim FNPP manufactured
    What would change this

    A Rosatom, OKBM Afrikantov or IAEA document that changes the RITM-200S reactor type or layout. Next scheduled check: 1 Feb 2027.