Projects / Russia · Construction

Baim / Cape Nagloynyn floating PEB-106 (RITM-200S)

Four planned floating power units with two RITM-200S reactors each for the Baim mining development at Cape Nagloynyn.

Current status

Stage
Construction
How current
General record check . Bounded evidence review . 6 of 15 listed sources have a publication or document date recorded here; the newest is 13 Aug 2026. Status not rechecked since then; the nightly status check covers this project.
Development and review dates

Newest recorded development . Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
Published 24 Sep 2026 · Recorded development: Second RITM-200S completed at ZiO-Podolsk for the first PEB-106. The second RITM-200S was completed at ZiO-Podolsk, completing the reactor set for the first PEB-106 floating unit for Baim / Cape Nagloynyn. Source: Strana Rosatom: Rosatom manufactures the reactor set for the first floating unit (24 September 2026). Updates entry
Next dated milestone
Planned step: 2027 (target). First Baimsky floating unit: reported power-service target (August 2022). This is not an achieved milestone. Source: World Nuclear News: Construction starts on Russia's next floating nuclear power plant (31 August 2022) (published 31 Aug 2022).
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.
  • Expected for this stage but not recorded as a structured fact: Permission evidence appropriate to stage (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Same design
2 tracked: 1 construction, 1 announced. 13 tracked at construction across all designs. Recorded stages, not proof of current activity.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Integral pressurized water reactor. How it works, with a 3D view.
Schematic of CAREM-25, this type's example. A single pressure vessel holds the core below helical steam generators, with a steam dome at the top.
Schematic of CAREM-25, this type's example.

Description

Rosatom describes the configuration; later industry reports describe fabrication. Reactor output, turbine rating and floating-unit output differ, so no single electrical capacity is assigned. A 10 March 2026 account of a Rostekhnadzor meeting on the first modernised floating unit, project 20871, says Baltic Shipyard reported on safety-review work and that the meeting invited an unnamed licensee to revise plans. Baltic Shipyard is not named as that licensee. The same account says one non-self-propelled floating unit supplies up to 106 MW of electricity to shore grids, with gross or net unstated. That upper bound is not stored as the reactor rating or as the four-unit total. Strana Rosatom on 24 September 2026 says the second RITM-200S completed the two-reactor set for the first PEB-106 and names no operator and no megawatt figure. Interfax on 13 August 2026 says Rosatom is implementing a project of four floating power units of 424 MW for the Baimsky complex, without saying whether 424 MW is each unit or the set, and expects the first in 2028 and the fourth in 2031. No opened page names the licensed reactor operator, so none is recorded. Construction began with the keel laying of the first unit's barge at a Chinese shipyard in August 2022; World Nuclear News then reported that Atomflot would be owner and operator once it is complete. For the wider Baimsky floating-unit program, a 20 December 2022 Atomic-energy.ru report credited to TVEL describes completed RITM-200S fuel/core design and planned establishment of core production at MSZ Elektrostal. It names no first hull and establishes no fabricated core, delivery or supplier-to-operator commitment.

Key facts

Design
RITM-200S (SMR)
Technology
Integral pressurized water reactor (iPWR) · light water. The NEA SMR Dashboard describes the RITM-200S as an integral pressurised water reactor for floating nuclear power plants.
Operator(s)
Not recorded
Vendor for linked design
Rosatom
Location
Cape Nagloynyn (Baim / PEB-106 floating mooring) · Russia · precision: site area (named plant, laboratory, base, port, campus or parcel)
Coordinates from NuclearChain sites.csv (CC BY 4.0; site name Cape Nagloynyn floating nuclear power plant). Mooring location for floating units.
Coordinates
69.09954, 169.4137 · site-area point (approximate)
Electrical capacity
Not recorded · scope: module
Thermal capacity
Not recorded
Modules planned
8
Purpose
Power plant
Construction start
Aug 2022Keel laid for the first Cape Nagloynyn floating unit's barge
Inclusion basis
SMR by design class
Confidence
medium
Record reviewed
18 Oct 2026Evidence review 19 Oct 2026. How current names both.

Could not be confirmed on . Attempted official source: Rostekhnadzor presentation to the OECD NEA MDEP small and modular reactor workshop: Safety regulation aspects of floating power units with the RITM-200C reactor unit. This is an access or status observation only; the record review date is unchanged.

Site and capacity notes

Baim / Cape Nagloynyn floating PEB-106 (RITM-200S) is recorded at Cape Nagloynyn (Baim / PEB-106 floating mooring), Chukotka, Russia. Operator: No operator is recorded. Recorded vendor: Rosatom. Stage: Construction. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: NuclearChain data downloads (CC BY 4.0), NuclearChain sites.csv row 'cape-nagloynyn-floating-nuclear-power-plant' (69.09954, 169.4137)

Electrical output is not recorded on this project. Modules planned: 8. Thermal output is not recorded on this project. The linked design record states 190 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Operator or intended licensed owner
Reactor supplier
  • Vendor for the linked designRosatom
Customer or offtaker
  • Prospective customer / offtaker (binding offtake not established)GDK Baimskaya · sourcePreliminary power-supply agreement signed with Atomflot in September 2021; a binding supply contract is not recorded.
Source-backed project statement

World Nuclear News reported on 3 September 2021 that Atomflot and GDK Baimskaya, a KAZ Minerals subsidiary developing the Baimskaya mine, signed a preliminary power-supply agreement at the Eastern Economic Forum, with delivered electricity priced at RUB 6 per kWh in 2020 prices and described as concluded on commercial terms. It is a preliminary agreement. A final binding supply contract is not recorded in the sources read. WNN: SMRs to power Arctic development

Contractor
  • Construction contractorAtomenergomash · sourceTo manufacture and supply the four floating power units ordered by Atomflot (RUB190.2 billion including VAT, as reported in October 2021).
Source-backed project statement

Delovoy Peterburg reported on 25 October 2021 that Atomenergomash will manufacture and supply the four modernised floating power units ordered by Atomflot, in a deal reported at RUB 190.2 billion including VAT, and that Kirov-Energomash signed a contract with OKBM Afrikantov to supply eight 58 MW steam-turbine units. World Nuclear News reported the keel laying of the first barge at a Chinese shipyard in August 2022. These are signed supply and construction contracts. Reactor installation and operating licensing are not reported. Delovoy Peterburg: Kirovsky Zavod to supply turbine units for floating power units

Funding and government decisions
Source-backed project statement

Delovoy Peterburg reported on 25 October 2021 that Atomflot, the intended owner, ordered the four floating units from Atomenergomash in a deal of RUB 190.2 billion including VAT, and World Nuclear News reported in September 2021 that partners would spend over RUB 150 billion on power plants and transmission for the mine, with Atomflot's power sold to GDK Baimskaya at a set tariff. Atomflot's own financing sources and any state support are not stated. Delovoy Peterburg: Kirovsky Zavod to supply turbine units for floating power units; WNN: SMRs to power Arctic development

Programs and agreements naming the project
Not found in the sources we checked (2): Fuel; Comparable schedule revision
Fuel
No fuel form or enrichment is recorded on the linked design profile.No project-specific fuel supply arrangement is recorded as a structured fact.

Strana Rosatom's 24 September 2026 reactor-set report establishes no fuel-supply commitment, fabricated core, delivery or loading for the first Baimsky unit. This is a limit of that report, not evidence that no supplier exists. Fuel design and planned production capability are separate from a procurement commitment. Strana Rosatom: Rosatom manufactures the reactor set for the first floating unit (24 September 2026)

Comparable schedule revision

Comparable schedule revision not established. World Nuclear News reported in September 2021 that the first two Baimsky floating units would operate by early 2027, and in August 2022 linked a 2027 target to transfer of the first unit and electricity supply at Cape Nagloynyn. Interfax's own background note on 13 August 2026 expects the first unit to be put into service in 2028 and the fourth in 2031. The sources do not establish that transfer, first electricity supply and entry into service are the same milestone. The forecasts remain recorded separately; a comparable revision or one-year delay is not established. WNN: SMRs to power Arctic development; World Nuclear News: Construction starts on Russia's next floating nuclear power plant (31 August 2022); Interfax: four floating units of 424 MW for the Baimsky project

Not recorded in SMRMap's reviewed evidence (2): Project proposer or applicant; Site host or owner
Project proposer or applicant
No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
Site host or owner

Timeline

Recorded developments

Targets

Planned, target and estimated dates are not achievements or commitments.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(9 notes)

Evidence dates

(6 of 15 sources with a publication or document date)
Latest dated listed source publication: Interfax: four floating units of 424 MW for the Baimsky project: 13 Aug 2026.Latest dated recorded event: Second RITM-200S completed at ZiO-Podolsk, completing the reactor set for the first PEB-106: 24 Sep 2026.9 of 15 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(15)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Baim / Cape Nagloynyn floating PEB-106 (RITM-200S) — https://smrmap.com/projects/baim-cape-nagloynyn-peb106/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Baim / Cape Nagloynyn floating PEB-106 (RITM-200S)”. Record reviewed 18 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/baim-cape-nagloynyn-peb106/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.