Compare two reactor types

Pick two reactor types to see their schematics side by side, what each type's explainer states about its coolant, pressure and temperature, and, if you ask, both 3D views together.

Values are shown as each explainer gives them, with the printed page of its source; nothing is converted, compared or ranked. The integral PWR is explained on its own page: How an integral PWR works.

First type

Pressurized water reactor

Rolls-Royce SMR pressurized water reactor, simplified side section of one of its three loops with numbered partsOn the left, a reactor vessel holds a core of fuel assemblies, with control rod drives above its head. A hot pipe leaves the vessel to the right and rises to a tall steam generator, which sits higher than the vessel. A pressurizer stands on the hot pipe. A pump directly below the steam generator returns the water through a lower pipe to the vessel. Solid arrows show the water going down inside the vessel wall, up through the core, out along the hot pipe, and back from the pump. Dashed arrows inside the steam generator's tubes and on its outer side are not traced in the section's text.12345678Core in, 295 °CCore out, 322 °CFeedwater
Simplified from the IAEA SMR Technology Catalogue 2026, Rolls-Royce SMR section (printed pages 79–84). Parts and proportions not stated in the source are schematic. The figure shows one of the three loops, one set of pipes and a schematic number of rods and tubes. The vessel's height and diameter are the catalog's; the sizes of the steam generator, pump and pressurizer are not stated. The catalog's pictures of this design are not labeled, so the arrangement follows the section's text: the pressurizer on the hot leg, the pump on the steam generator's outlet, the pipes entering the vessel's upper shell, and the steam generator above the vessel. The heights of the pipes, the side of the vessel each leaves on, how far above the vessel the steam generator stands, and the straight tubes are schematic. The numbered parts are explained on How a pressurized water reactor works; arrows show the coolant path.
  • Coolant water, on the route the section's text gives
  • Coolant water inside the U-tubes, not traced in the section's text
  • Water and steam on the steam generator's outer side, not traced in the section's text

Second type

Sodium-cooled fast reactor

Natrium sodium-cooled fast reactor, simplified side section with numbered partsOn the left, a wide reactor vessel inside a guard vessel holds the core low down, with control rods from above, an upper structure, one heat exchanger and one pump. Solid arrows run from the pump along the bottom into the space under the core, up through the core into the upper part of the vessel, across and down through the heat exchanger, and back into the pump, with the up-and-down sense following the drawn layering of the pools. A second line carries heat out through the head to a sodium-salt heat exchanger on the right. A third line runs down from there to a hot salt tank and a steam facility. Dashed lines come back and are not described in the section's text.123456789Hot poolCold poolCore inlet plenumSteam out
Simplified from the IAEA SMR Technology Catalogue 2026, Natrium section (printed pages 295–300). Parts and proportions not stated in the source are schematic. The figure shows one intermediate heat exchanger and one pump; the section's text speaks of both in the plural but gives no count. The numbers of rods, tubes and assemblies are schematic, and hexagonal assemblies are drawn as plain rods. The vessel's height and diameter are the catalog's; the guard vessel, the deck between the pools and everything on the right are not to scale. The numbered parts are explained on How a sodium-cooled fast reactor works; arrows show the coolant path.
  • Primary sodium, in the order the section's text gives
  • Intermediate sodium carrying heat out, as the section's text gives
  • Intermediate sodium coming back, not described in the section's text: drawn only to close the loop
  • Salt moving heat to the tank and on to make steam, as the section's text gives
  • Salt coming back, not described in the section's text: drawn only to close the loop
  • Steam going on to make electricity or heat

In 3D, choose a numbered part beneath either model to highlight it and read its explanation. Each model describes its own example design; matching part numbers do not mean matching components.

What these definitions state

Pressurized water reactor and Sodium-cooled fast reactor, as each type's explainer states them
AttributePressurized water reactor, example design: Rolls-Royce SMRSodium-cooled fast reactor, example design: Natrium
CoolantLight water[1, p. 79] pressurized water reactor, source 1Liquid sodium[1, p. 295] sodium-cooled fast reactor, source 1
Pressure15.5 MPa[1, p. 79] pressurized water reactor, source 1not stated in this definition
Core outlet temperature322 °C[1, p. 79] pressurized water reactor, source 1not stated in this definition

Each column describes its type's example design, the one its explainer is written on, not every design of the type. “not stated” means that explainer gives no value for exactly that row; some give a related figure instead, such as one temperature without saying which end of the core it is. Each type's own page gives its values in full and says what its source does and does not cover.

Sources

Sources — Pressurized water reactor

  1. Small Modular Reactor Technology Catalogue, 2026 edition (contributor material; printed September 2026) — IAEA ARIS (catalog host; profiles supplied by contributors). Rolls-Royce SMR section, printed pages 79–84; CAREM section, printed pages 31–32. Each section is contributor material; the Rolls-Royce SMR section was supplied by Rolls-Royce.

Sources — Sodium-cooled fast reactor

  1. Small Modular Reactor Technology Catalogue, 2026 edition (contributor material; printed September 2026) — IAEA ARIS (catalog host; profiles supplied by contributors). Natrium section, printed pages 295–300. Each section is contributor material; the Natrium section was supplied by TerraPower.