Projects / United Kingdom · Announced
Centrica / X-energy Xe-100 plant at Hartlepool
Centrica and X-energy signed a joint development agreement in September 2025 naming EDF and Centrica's Hartlepool site as the preferred first site.
Current status
- How current
- General record check . Bounded evidence review . None of the 2 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
No dated development is recorded. Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- No actual dated development is recorded.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Electrical output is not recorded.
- Thermal output is not recorded on this project.
- No operator is recorded.
- The mapped point is not an exact surveyed coordinate.
- Same design
- 4 tracked: 1 licensing, 1 siting, 2 announced. 96 tracked at announced across all designs. Recorded stages, not proof of current activity.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
- Reactor type
- High-temperature gas-cooled reactor. How it works, with a 3D view.
View on the map · View on the 3D globe · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
It covers a 12-unit Xe-100 deployment that could add up to 960 MW. Their announcement says Centrica will provide initial project capital for development, without stating an amount or confirming disbursement. The UK Government listed it in February 2026. No license application or construction is established.
Key facts
- Design
- Xe-100 (SMR)
- Technology
- High-temperature gas-cooled reactor (HTGR) · helium
- Reactor vessel of this design
- 16.4 m tall, 4.88 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 253.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
All vessels to scale - Operator(s)
- Not recorded
- Vendor for linked design
- X-energy
- Design origin
- United States: where the design's vendor is recorded, not where parts are made · See designs from this origin on a 3D globe
- Location
- Hartlepool site (EDF and Centrica) · United Kingdom · precision: site area (named plant, laboratory, base, port, campus or parcel)
Coordinates of the existing Hartlepool nuclear station from the NuclearChain reactors export (CC BY 4.0), whose unit points derive from GEM's Global Nuclear Power Tracker; the project is on the same EDF/Centrica site. Not a surveyed plot. - Coordinates
- 54.6341, -1.1801 · site-area point (approximate)
- Electrical capacity
- Not recorded · scope: plant
- Thermal capacity
- Not recorded
- Inclusion basis
- Vendor SMR claim, capacity checked
- Confidence
- medium
- Record reviewed
- 2 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes
Centrica / X-energy Xe-100 plant at Hartlepool is recorded at Hartlepool site (EDF and Centrica), England, United Kingdom. Operator: No operator is recorded. Recorded vendor: X-energy. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).
Coordinate source: NuclearChain reactors.csv export (unit coordinates), NuclearChain reactors.csv row 'hartlepool-nuclear-power-plant-a1' (54.6341, -1.1801)
Electrical output is not recorded on this project. Modules planned: 12. Thermal output is not recorded on this project. The linked design record states 200 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Reactor supplier
- Vendor for the linked designX-energy
- Funding and government decisions
Source-backed project statement Centrica and X-energy’s announcement says Centrica will provide initial project capital for development. The amount and disbursement are not stated; this is prospective capital, not confirmation of paid expenditure. X-energy and Centrica joint development agreement (Hartlepool); Government to unlock advanced nuclear to grow economy
- Fuel
- Fuel form stated for Xe-100Graphite pebbles with TRISO particle fuel
The 15 September 2025 X-energy and Centrica release names TRISO-X as X-energy's fuel technology but states no fuel supplier, allocation, fabrication or delivery for Hartlepool, and the UK government's 4 February 2026 notice names no fuel arrangement. The release's Dow and Energy Northwest plants are other projects. X-energy and Centrica joint development agreement (Hartlepool)
Not found in the sources we checked (3): Customer or offtaker; Contractor; Comparable schedule revision
- Customer or offtaker
The 15 September 2025 X-energy and Centrica release and the UK government's 4 February 2026 notice name no buyer, contracted quantity or purchase agreement for power or heat from a Hartlepool Xe-100 plant. The 960 MW and 1.5 million homes figures describe what 12 units could add, and EDF's support for the plans reflects its site-owner role. X-energy and Centrica joint development agreement (Hartlepool); Government to unlock advanced nuclear to grow economy
- Contractor
The 15 September 2025 release says Centrica and X-energy, the two proposers, signed a joint development agreement and are in discussions with potential equity partners and unnamed engineering and construction companies to form a UK development company. No engineering or construction contractor is named, and the UK government's 4 February 2026 notice describes plans, not an award. X-energy and Centrica joint development agreement (Hartlepool); Government to unlock advanced nuclear to grow economy
- Comparable schedule revision
Comparable schedule revision not established. The 15 September 2025 release gives one target, first electricity in the mid-2030s subject to regulatory approval, plus a 2026 goal for full-scale development activities and the existing station's 2028 closure, which are different milestones. The UK government's 4 February 2026 notice restates no date. No revision of the same milestone is shown. X-energy and Centrica joint development agreement (Hartlepool)
Not recorded in SMRMap's reviewed evidence (2): Operator or intended licensed owner; Programs and agreements naming the project
- Operator or intended licensed owner
- Programs and agreements naming the project
Timeline
This timeline has no entries yet. Other dated information may appear in the description and checking notes.
New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Assessments of the design (not of this site)
(2)
- Xe-100 UK Generic Design Assessment (requested) — applies to the design, not to a site
Design assessment sought · Application received · ONR/EA (UK)
On 15 September 2026 ONR said the Department for Energy Security and Net Zero had asked it, the Environment Agency and Natural Resources Wales to begin a three-step Generic Design Assessment of X-energy UK Holdings Ltd's Xe-100 after a readiness review. The assessment begins once timescale and resource arrangements are in place, so no step is recorded as started. ONR's page, updated 28 September 2026 and re-read on 28 October 2026, still says so.
Sources: ONR: regulators asked to commence a Generic Design Assessment of Xe-100 (15 September 2026)Could not be confirmed on . Attempted official source: ONR: regulators asked to commence a Generic Design Assessment of Xe-100 (15 September 2026). This is an access or status observation only; the record review date is unchanged.
- CNSC vendor design review, Phases 1 and 2 (Xe-100) — applies to the design, not to a site
Design assessment · Review completed (not an approval) · CNSC · completed Dec 2023
CNSC lists a combined Phase 1 and 2 pre-licensing vendor design review of X-energy's Xe-100 among its completed reviews, with an executive summary dated December 2023. CNSC entered into the agreement with X-energy to conduct the review on 20 July 2020; that is an agreement date, not an application or a decision. CNSC says a vendor design review does not certify a design, issue a license or bind later Commission decisions.
Sources: CNSC: vendor design review service agreements and completed reviews; CNSC: X-energy Xe-100 vendor design review executive summary
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(4 notes, 1 not yet reviewed)
- Evidence review. On 15 September 2025 X-energy and Centrica announced a joint development agreement. They identified EDF and Centrica's Hartlepool site as the preferred first site. A 12-unit Xe-100 deployment there could add up to 960 megawatts, at a site adjacent to the existing station, which was scheduled to stop generating in 2028. The same release says each Xe-100 is engineered for 80 megawatts electric and that multi-unit plants range from 320 to 960 megawatts. The UK government notice published 4 February 2026 lists plans for X-energy and Centrica to build 12 advanced modular reactors at Hartlepool. No license application, fuel contract or financing close is stated. The 960 megawatt figure is a ceiling and is not kept as plant output. The fleet figure of up to 6 gigawatts is not this plant. Last checked 19 Oct 2026. X-energy and Centrica joint development agreement (Hartlepool); Government to unlock advanced nuclear to grow economy
What would change this
An ONR or planning application for the Hartlepool Xe-100, or a decision not to use that site, would change this record. Next scheduled check: 19 Jan 2027.
- Next decision and prerequisites. The September 2025 release says Centrica would provide initial development capital with the goal of starting full-scale activities in 2026, and that first electricity in the mid-2030s depends on regulatory approval. Whether full-scale activities began in 2026 is not shown in the sources reviewed; the 2026 goal and mid-2030s date are targets. Last checked 23 Oct 2026. X-energy and Centrica joint development agreement (Hartlepool)
What would change this
A Centrica or X-energy announcement on full-scale development, a UK development company, or a licensing application. Next scheduled check: 23 Jan 2027.
- Permissions and public process. The September 2025 Centrica and X-energy release says the Hartlepool site is already designated for new nuclear under the Government's National Policy Statement and that first power in the mid-2030s is subject to regulatory approval. Designation is national planning policy, not a project consent; no site license, planning application or consultation for the Xe-100 plant is shown in the sources reviewed. Last checked 23 Oct 2026. X-energy and Centrica joint development agreement (Hartlepool)
What would change this
A development consent application, ONR licensing application or public consultation for the Hartlepool Xe-100 plant. Next scheduled check: 23 Apr 2027.
- Site dependencies (land, grid, water). The September 2025 release says the 12-unit Xe-100 plant would be built on land adjacent to the existing Hartlepool nuclear power station, owned by EDF and Centrica, which is scheduled to stop generating in 2028, and that the plant could supply high-temperature heat to Teesside industry. A preferred site and stated heat opportunity are not a land agreement, grid connection or heat-supply contract, none of which is described. Last checked 23 Oct 2026. X-energy and Centrica joint development agreement (Hartlepool)
What would change this
A land, grid connection or heat-supply agreement for the Hartlepool Xe-100 project. Next scheduled check: 23 Apr 2027.
Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.
Evidence dates
(0 of 2 sources with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(2)
- X-energy and Centrica joint development agreement (Hartlepool) (company, accessed 2 Oct 2026)
- Government to unlock advanced nuclear to grow economy (government, accessed 2 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: Centrica / X-energy Xe-100 plant at Hartlepool — https://smrmap.com/projects/hartlepool-xe100/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “Centrica / X-energy Xe-100 plant at Hartlepool”. Record reviewed 2 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/hartlepool-xe100/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.