Xe-100
High-temperature gas-cooled pebble-bed SMR, approximately 80 MWe per module, often proposed in multi-module plants. For Long Mott at Dow's Seadrift site, the NRC records a construction-permit application submitted on 31 March 2025. Its project page, updated 14 September 2026, records the advanced safety evaluation as completed in August 2026. The NRC's Advisory Committee on Reactor Safeguards reported on 16 October 2026 that its review supports issuance of the construction permit, and X-energy announced on 30 October 2026 that the NRC had completed its final safety evaluation report. These are steps for the Long Mott application, not a generic design approval or a construction permit. On 15 September 2026 the Office for Nuclear Regulation said it, the Environment Agency and Natural Resources Wales had been asked by the Department for Energy Security and Net Zero to begin a three-step Generic Design Assessment of X-energy UK Holdings Ltd's Xe-100, after a readiness review found the design ready to enter. The assessment begins once timescale and resource arrangements are in place. A Tier 3 preliminary design review on selected topics is also under way. This is a request to commence, not a started assessment step, a design acceptance or a site permission. No United Kingdom project is recorded.
- Reactor type
- High-temperature gas-cooled reactor. How it works, with a 3D view.
- Projects
- Licensing: Long Mott Generating Station (Xe-100 at Dow Seadrift). Furthest recorded stage of 4 using this design.
- Evidence
- 6 sources; first primary source: IAEA Advanced Reactors Information System (ARIS). Record reviewed 15 Oct 2026.
Key facts · Tracked projects · Agreements · Sources · Evidence · Regulatory actions · Its projects in the table · Compare with other designs
Key facts
- Class
- SMR
- Technology
- High-temperature gas-cooled reactor (HTGR)
- Coolant
- Helium
- Spectrum
- Thermal
- Developer / vendor(s)
- X-energy
- Module electrical
- 80 MWe (net)
- Module thermal
- 200 MWth (nameplate; basis unspecified)
- Fuel form
- Graphite pebbles with TRISO particle fuel
- Reactor vessel
- 16.4 m tall, 4.88 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 253.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
All vessels to scale - Inclusion basis
- SMR by design class
- Confidence
- high
- Record reviewed
- 15 Oct 2026 (record review date, not proof of current availability or a deployment)
Tracked deployment projects
- Long Mott Generating Station (Xe-100 at Dow Seadrift) — Licensing · United States
- Cascade Advanced Energy Facility — Siting · United States
- Centrica / X-energy Xe-100 plant at Hartlepool — Announced · United Kingdom
- Amazon, AEP and X-energy Xe-100 plant at the former Breed station (Indiana) — Announced · United States
Agreements naming this design
(10)
Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.
- AEP, Amazon and X-energy exploration agreement for the former Breed station in Indiana — Feasibility or siting study · Active · announced 19 Oct 2026
Concerns United States - TRISO-X–ORNL fuel-research agreement extension — Research program · Active · announced 11 Aug 2026
Concerns United States - X-energy participation in Project Prometheus — Research program · Active · announced 22 Jul 2026
Concerns United States - LG&E and KU (PPL) and X-energy collaboration to explore Xe-100 SMR deployment in Kentucky — Feasibility or siting study · Active · announced 30 Apr 2026
Concerns United States - X-energy and Talen Energy letter of intent to assess three or more four-unit Xe-100 plants (Pennsylvania and PJM) — Fleet agreement · Active · announced 19 Mar 2026
Concerns United States - X-energy Canada study of repurposing an Alberta thermal power site with Xe-100 reactors (2025) — Feasibility or siting study · Completed · announced Sep 2025
Concerns Canada - ENEC ADVANCE program for advanced reactors and its COP28 SMR memoranda — Government program · Active · announced Dec 2023
Concerns United Arab Emirates - OPG and X-energy framework agreement to deploy Xe-100 SMRs at industrial sites in Canada — Cooperation agreement or MOU · Status not established · announced 12 Jul 2022
Concerns Canada - Maryland Energy Administration grant study of repurposing a Maryland coal plant with X-energy's Xe-100 — Feasibility or siting study · Completed · announced 14 Jun 2022
Concerns United States - JAEC and X-energy memorandum to assess Xe-100 deployment in Jordan — Cooperation agreement or MOU · Superseded · announced Nov 2017
Concerns Jordan
Design sources
(6)
- NRC / ANS Dow Long Mott Xe-100 EA-FONSI (news report, published 20 May 2026, accessed 1 Oct 2026)
- IAEA Advanced Reactors Information System (ARIS) (IAEA/NEA, accessed 1 Oct 2026)
- NRC: Long Mott Generating Station Xe-100 application page (regulator, page updated 14 Sep 2026, accessed 13 Nov 2026)
- ONR: regulators asked to commence a Generic Design Assessment of Xe-100 (15 September 2026) (regulator, published 15 Sep 2026, accessed 28 Oct 2026)
- NRC Advisory Committee on Reactor Safeguards: report on the safety aspects of the Long Mott construction permit application (16 Oct 2026) (regulator, dated 16 Oct 2026, accessed 1 Nov 2026)
- X-energy: NRC completes safety review of the Xe-100 for Long Mott (final safety evaluation report), 30 Oct 2026 (company, published 30 Oct 2026, accessed 1 Nov 2026)
Evidence and open questions
(1 note)
- Evidence review. The NRC's Long Mott Generating Station page (updated 14 September 2026) describes the X Energy Xe-100 as a high-temperature gas-cooled reactor (HTGR) with graphite pebbles containing TRISO (UCO) particle fuel and a helium pressure boundary, a 4-module plant of 800 MWth/320 MWe, and says each module could produce 80 megawatts-electric or about 200 megawatts-thermal of steam for Dow's Seadrift Operations; its milestones show the advanced safety evaluation done in August 2026 and the final safety evaluation targeted for November 2026, with the permit decision still pending. The ANS 20 May 2026 article reports the NRC environmental assessment and FONSI for Long Mott and describes the Xe-100 as cooled with pressurized helium gas, each unit rated 80 MWe. ONR's 15 September 2026 news item says DESNZ asked ONR, the Environment Agency and NRW to begin a 3-step GDA of X-energy UK Holdings Ltd's Xe-100 after a readiness review, starting once timescale and resource arrangements are in place; this is a design-stage request, not a started step or site permission. Deployment link supported: Long Mott Generating Station (Xe-100 at Dow Seadrift) only; no opened source names Cascade or Hartlepool. Stored vendor, HTGR family, helium coolant, 80 MWe, 200 MWth and fuel form stay supported; the stored 'net' electrical basis and thermal spectrum are not stated in any opened source. The attached ARIS URL returned only a 42-character page title. Last checked 19 Oct 2026. NRC: Long Mott Generating Station Xe-100 application page; NRC / ANS Dow Long Mott Xe-100 EA-FONSI; ONR: regulators asked to commence a Generic Design Assessment of Xe-100 (15 September 2026)
What would change this
The NRC final safety evaluation (targeted November 2026) and construction permit decision for Long Mott, or ONR's announcement that GDA Step 1 for the Xe-100 has started. Next scheduled check: 7 Dec 2026.
Regulatory actions
(4)
Compare reviews and approvals across designs
Design assessment
- CNSC vendor design review, Phases 1 and 2 (Xe-100) — applies to the design, not to a site
Design assessment · Review completed (not an approval) · CNSC · completed Dec 2023
CNSC lists a combined Phase 1 and 2 pre-licensing vendor design review of X-energy's Xe-100 among its completed reviews, with an executive summary dated December 2023. CNSC entered into the agreement with X-energy to conduct the review on 20 July 2020; that is an agreement date, not an application or a decision. CNSC says a vendor design review does not certify a design, issue a license or bind later Commission decisions.
Sources: CNSC: vendor design review service agreements and completed reviews; CNSC: X-energy Xe-100 vendor design review executive summary - Xe-100 UK Generic Design Assessment (requested) — applies to the design, not to a site
Design assessment sought · Application received · ONR/EA (UK)
On 15 September 2026 ONR said the Department for Energy Security and Net Zero had asked it, the Environment Agency and Natural Resources Wales to begin a three-step Generic Design Assessment of X-energy UK Holdings Ltd's Xe-100 after a readiness review. The assessment begins once timescale and resource arrangements are in place, so no step is recorded as started. ONR's page, updated 28 September 2026 and re-read on 28 October 2026, still says so.
Sources: ONR: regulators asked to commence a Generic Design Assessment of Xe-100 (15 September 2026)Could not be confirmed on . Attempted official source: ONR: regulators asked to commence a Generic Design Assessment of Xe-100 (15 September 2026). This is an access or status observation only; the record review date is unchanged.
Construction applications and decisions
- Long Mott construction permit — Long Mott Generating Station (Xe-100 at Dow Seadrift)
Construction permission · Issued / approved · NRC · decided 9 Nov 2026 · submitted 31 Mar 2025 · permit CPAR-3 · docket 50-614 · ADAMS ML26301A133 · 90 FR 24428 · 91 FR 53900 · 91 FR 72925
Long Mott Energy's construction permit application, dated 31 March 2025, was accepted and docketed by the NRC. NRC news release 26-083 of 9 November 2026 states that the NRC has issued the construction permit for the four-reactor Xe-100 Long Mott Generating Station in Calhoun County, Texas, that staff completed the safety evaluation in October, and that the permit authorizes building the facility but not operation; a separate operating license is required before fuel loading. The release gives no permit number; the permit itself is Construction Permit No. CPAR-3 (ADAMS ML26301A133), issued 9 November 2026, and the Federal Register notice of issuance (91 FR 72925, 12 November 2026) says it is immediately effective and authorizes construction of a power reactor facility in Calhoun County, Texas. The permit sets the earliest construction completion date as 1 July 2033 and the latest as 31 December 2033 and expires on that date. Its conditions include that Long Mott Energy notify the NRC when the site grading design and the passive engineered flooding protection design that may impact site grading are available for NRC staff examination, and that it perform geologic mapping of each foundation excavation for safety-related structures, evaluate it against the site characterization and notify the NRC when it is available for examination; the permit also incorporates an environmental protection plan. It says a license authorizing operation will not be issued unless the applicant submits the complete final safety analysis report, the Commission makes the stated findings on final design and environmental requirements, and the applicant submits proof of financial protection and executes an indemnity agreement. The NRC's project page, updated 12 November 2026, lists the hearing as held on 22 September 2026 and the construction permit decision as 8 November 2026; the permit and the Federal Register notice date issuance to 9 November 2026, and the one-day difference is unexplained in the sources read. Earlier steps: the uncontested (mandatory) hearing was held on 22 September 2026 in Port Lavaca; the Advisory Committee on Reactor Safeguards reported on 16 October 2026 that its review supports issuance; NRC issued an environmental assessment and finding of no significant impact plus related exemptions on 18 May 2026. In the contested proceeding, both admitted contentions were dismissed as moot in 2026 and on 7 August 2026 the Commission dismissed the applicant's appeal as moot; on 6 November 2026 the Commission denied the intervenor's separate petition for review (CLI-26-15). The permit is not an operating license. No construction start is recorded; a permit is not a physical construction start.
Sources: Federal Register 90 FR 24428 (10 Jun 2025): Long Mott Generating Station construction permit application; Federal Register 91 FR 53900 (20 Aug 2026): Long Mott Generating Station notice of hearing; NRC / ANS Dow Long Mott Xe-100 EA-FONSI; NRC Federal Register notice: Long Mott environmental assessment, FONSI and exemptions; NRC: Long Mott Generating Station Xe-100 application page; NRC Commission order CLI-26-10, Long Mott Energy, LLC (Docket 50-614-CP); NRC meeting notice: mandatory hearing on the Long Mott construction permit application; NRC Advisory Committee on Reactor Safeguards: report on the safety aspects of the Long Mott construction permit application (16 Oct 2026); Federal Register 2026-18898 (15 Sep 2026): 739th meeting of the Advisory Committee on Reactor Safeguards; X-energy: NRC completes safety review of the Xe-100 for Long Mott (final safety evaluation report), 30 Oct 2026; NRC news release 26-083: first construction permit in nearly 60 years for a high-temperature gas-cooled reactor (Long Mott); X-energy and Dow: proposed SMR project receives construction permit for nuclear-powered industrial site; Federal Register 91 FR 72925 (12 Nov 2026): Long Mott Generating Station construction permit CPAR-3, notice of issuance; NRC Construction Permit No. CPAR-3, Long Mott Generating Station (ML26301A133); NRC Commission order CLI-26-15, Long Mott Energy, LLC (Docket 50-614-CP)
Environmental decision
- Long Mott environmental assessment, FONSI and review exemptions — Long Mott Generating Station (Xe-100 at Dow Seadrift)
Environmental decision · Issued / approved · U.S. Nuclear Regulatory Commission · decided 18 May 2026 · 91 FR 29515
The NRC notice says the Long Mott construction-permit environmental assessment and finding of no significant impact were available on 18 May 2026 and that exemptions permitting this review in place of an environmental impact statement were issued the same day. The construction-permit application remains under review; this decision is not a construction permit or authority to operate.
Sources: NRC Federal Register notice: Long Mott environmental assessment, FONSI and exemptions