Projects / United States · Announced

Holtec Green River / Blue Castle, Utah proposal

The Green River / Blue Castle proposal is an announced Holtec International SMR-300 project partnership at Green River, Utah.

Current status

Stage
Announced
How current
General record check . Bounded evidence review . None of the 3 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

Newest recorded development . Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
Announced 28 May 2026 · Announcement: Holtec Green River / Blue Castle, Utah proposal documented. SMR-300 project partnership at Green River, Utah. Source: Holtec Green River / Blue Castle partnership. Updates entry
More on this development

Separate from Tata / BWXT Green River in Wyoming. No module count or construction start is established.

Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.
Same design
5 tracked: 1 licensing, 4 announced. 96 tracked at announced across all designs. Recorded stages, not proof of current activity.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Pressurized water reactor. How it works, with a 3D view.
Schematic of Rolls-Royce SMR, this type's example. On the left, a reactor vessel holds a core of fuel assemblies, with control rod drives above its head.
Schematic of Rolls-Royce SMR, this type's example.

Description

Separate from Tata / BWXT Green River in Wyoming. No module count or construction start is established. A 2026 joint venture plans two to four SMR-300 units (600-1,200 MW); the range is not stored as a plant total.

Key facts

Design
Holtec SMR-300 (SMR)
Technology
Pressurized water reactor (PWR) · light water. The 2024 SMR Technology Catalogue describes a two-loop pressurized water reactor, so no integral layout is recorded.
Operator(s)
Not recorded
Vendor for linked design
Holtec International
Location
Green River, Blue Castle project · United States · precision: site area (named plant, laboratory, base, port, campus or parcel)
Coordinates for the named Blue Castle / Green River, Utah proposal location from the NuclearChain reactors export (CC BY 4.0; derived from GEM's tracker).
Coordinates
39.0141, -110.241 · site-area point (approximate)
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
2 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

Holtec Green River / Blue Castle, Utah proposal is recorded at Green River, Blue Castle project, Utah, United States. Operator: No operator is recorded. Recorded vendor: Holtec International. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: NuclearChain reactors.csv export (unit coordinates), NuclearChain reactors.csv row 'blue-castle-nuclear-power-plant-smr-1' (39.0141, -110.24101)

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Reactor supplier
Contractor

Source-backed project statement The 28 May 2026 post says Fulcrum Point is stepping in as a development partner for licensing, deployment planning, and eventual construction, and that Hyundai E&C will join after key development milestones and funding arrangements. This does not establish an EPC award, a notice to proceed or Hyundai's appointment as the current construction contractor. Holtec Green River / Blue Castle partnership

Fuel
  • Fuel form stated for Holtec SMR-300UO2 pellet / square array
No project-specific fuel supply arrangement is recorded as a structured fact.

The post says Holtec will supply the SMR-300 plant under an exclusive arrangement. That is a plant-supply arrangement, not a fuel contract. The page navigation lists Holtec fuel-storage products and is not a commitment to fuel these units. Neither opened page names a fuel supplier or a delivery. Holtec Green River / Blue Castle partnership

Not found in the sources we checked (3): Customer or offtaker; Funding and government decisions; Comparable schedule revision
Customer or offtaker

Both opened pages quote Blue Castle on potential on-site, behind-the-meter opportunities for advanced technology applications and on serving energy demand across Utah and the surrounding region. Neither page names a customer, a quantity, or an agreement. Jobs and local economic impact are not an offtake. Holtec Green River / Blue Castle partnership

Funding and government decisions

The checked Holtec release makes later Hyundai participation conditional on project milestones and funding arrangements. It does not identify a completed financing arrangement, a named project funder or an amount. Holtec Green River / Blue Castle partnership

Comparable schedule revision

Comparable schedule revision not established. ANS says the project is in a preliminary phase and that timeline details will follow. That is one undated statement, not a revision. ANS also says an earlier combined-license target, later switched to an early site permit, moved several times for the former two-AP1000 plan. That is a different reactor and a different application, so it is not an SMR-300 milestone revision. ANS: Blue Castle project to be revived as SMR facility

Not recorded in SMRMap's reviewed evidence (4): Project proposer or applicant; Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
Project proposer or applicant
No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
Operator or intended licensed owner
Site host or owner
Programs and agreements naming the project

Timeline

Recorded developments

Permissions and applications

Assessments of the design (not of this site)

(1)
  • Holtec SMR-300 UK Generic Design Assessment (two steps) — applies to the design, not to a site
    Design assessment · Review completed (not an approval) · ONR/EA (UK) · completed 31 Mar 2026 · submitted Jan 2023
    Holtec submitted the design, then named SMR-160, to the UK government for entry into Generic Design Assessment in January 2023, according to the Environment Agency's Step 1 summary; it was renamed SMR-300 in January 2024. The UK regulators began a two-step Generic Design Assessment of Holtec's SMR-300 on 18 October 2023 at the government's request. Step 1 ran from October 2023 to August 2024 and Step 2 from August 2024 to March 2026. The Environment Agency records completing Step 2 on 31 March 2026, and ONR's page records the assessment as completed that month with no Step 3 and no Design Acceptance Confirmation. The assessment is not permission for any site, construction or operation.
    Sources: Environment Agency: assessing new nuclear reactor designs; ONR, Holtec SMR-300 Generic Design Assessment; Environment Agency: GDA Step 1 of the Holtec SMR, statement of findings public summary

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(4 notes, 1 not yet reviewed)
  • Evidence review. Holtec announced that its SMR-300 was chosen for the Green River Advanced Nuclear Project in Utah, the Blue Castle project. Fulcrum Point is described as the development partner moving the project toward licensing and construction. The project is to go through federal licensing under an exclusive arrangement for Holtec to supply the SMR-300. Hyundai E&C is named as Holtec's construction partner who will join after development milestones and funding arrangements, which is not a signed construction contract. ANS reported on 1 June 2026 that a Blue Castle spokesperson said the plan is two to four SMR-300 units generating 600 to 1,200 megawatts. That range is not stored. This is Green River, Utah, not the Wyoming project. The opened Global Energy Monitor capture does not mention this project and is not used. Last checked 19 Oct 2026. Holtec Green River / Blue Castle partnership; ANS: Blue Castle project to be revived as SMR facility
    What would change this

    An NRC application for the Green River, Utah SMR-300, or a stated unit count in a Holtec or Blue Castle filing, would change this record. Next scheduled check: 19 Jan 2027.

  • Next decision and prerequisites. ANS reported in 2026 that a Blue Castle–Fulcrum Point joint venture plans two to four SMR-300s at Green River and that the project is in a preliminary phase, with timeline details to follow. Fulcrum Point said in Holtec's release that it would help move the project into its next phase, including licensing. No licensing filing date or construction target is given. Last checked 23 Oct 2026. ANS: Blue Castle project to be revived as SMR facility; Holtec Green River / Blue Castle partnership
    What would change this

    A published timeline or NRC filing for the Green River SMR-300 project. Next scheduled check: 23 Apr 2027.

  • Permissions and public process. ANS reported in 2026 that Blue Castle's earlier plan to seek an NRC combined license, later switched to an early site permit application, was delayed repeatedly, and that a 2016 Utah Court of Appeals ruling upheld the project's state water rights against a HEAL Utah challenge. A Blue Castle spokesperson said the revived SMR-300 project is in a preliminary phase, with details on community input to follow. No NRC application or permit for the SMR-300 plan is recorded in these sources. Last checked 23 Oct 2026. ANS: Blue Castle project to be revived as SMR facility
    What would change this

    An NRC pre-application or application for SMR-300s at Green River, or an announced community input process. Next scheduled check: 23 Apr 2027.

  • Site dependencies (land, grid, water). Holtec's 2026 release says the Green River site has existing water rights, Union Pacific rail access, proximity to I-70 and multi-market transmission opportunities, backed by meteorological, seismic and groundwater studies. ANS reported that Utah granted the project water rights in 2012 and that the Utah Court of Appeals ruled for Blue Castle in 2016 after a HEAL Utah challenge. Transmission is described only as an opportunity; no interconnection agreement is shown. Last checked 23 Oct 2026. Holtec Green River / Blue Castle partnership; ANS: Blue Castle project to be revived as SMR facility
    What would change this

    A transmission interconnection request or agreement, or a change in the water-rights status. Next scheduled check: 23 Apr 2027.

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(0 of 3 sources with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated recorded event: Holtec Green River / Blue Castle, Utah proposal documented: 28 May 2026.3 of 3 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(3)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Holtec Green River / Blue Castle, Utah proposal — https://smrmap.com/projects/holtec-blue-castle/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Holtec Green River / Blue Castle, Utah proposal”. Record reviewed 2 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/holtec-blue-castle/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.