Projects / United States · Announced

Holtec SMR-300 proposal in Brigham City, Utah

Utah's governor and Brigham City announced in November 2025 a project with Hi Tech Solutions and Holtec pairing SMR-300 deployment with a manufacturing and training hub.

Current status

Stage
Announced
How current
General record check . Bounded evidence review . 1 of 4 listed sources has a publication or document date recorded here: 19 Nov 2025. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • No map pin is shown for this record.
Same design
5 tracked: 1 licensing, 4 announced. 96 tracked at announced across all designs. Recorded stages, not proof of current activity.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Pressurized water reactor. How it works, with a 3D view.
Schematic of Rolls-Royce SMR, this type's example. On the left, a reactor vessel holds a core of fuel assemblies, with control rod drives above its head.
Schematic of Rolls-Royce SMR, this type's example.

Description

The number of units is not stated. Distinct from the Blue Castle proposal at Green River.

Key facts

Design
Holtec SMR-300 (SMR)
Technology
Pressurized water reactor (PWR) · light water. The 2024 SMR Technology Catalogue describes a two-loop pressurized water reactor, so no integral layout is recorded.
Operator(s)
Not recorded
Vendor for linked design
Holtec International
Location
Brigham City · United States · precision: town or locality only
The sources name this place but publish no coordinate for it, so no pin is shown.
Coordinates
Town named, no map pin
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
2 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes

Holtec SMR-300 proposal in Brigham City, Utah is recorded at Brigham City, Utah, United States. Operator: No operator is recorded. Recorded vendor: Holtec International. Stage: Announced. Location precision: town or locality only; town named, no map pin.

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Reactor supplier
Funding and government decisions

Source-backed project statement The Utah Office of Energy Development's 19 November 2025 slide lists an intended investment of $750 million for Hi Tech Solutions and Holtec's Brigham City plans, which cover manufacturing, training and eventual SMR generation. The American Public Power Association and ANS reports describe the sum as private investment backing Phase 1 or already raised, but no investor, instrument or disbursement is named and no amount is separated for the reactors. Utah OED: Nuclear Consortium presentation to PUET Committee, 19 November 2025; APPA: Utah and industry leaders announce nuclear partnership in Brigham City; ANS Nuclear Newswire: Operation Gigawatt looks to Brigham City, Holtec and Hi Tech Solutions

Fuel
  • Fuel form stated for Holtec SMR-300UO2 pellet / square array
No project-specific fuel supply arrangement is recorded as a structured fact.

The Utah Office of Energy Development's 19 November 2025 slide and the 18 and 19 November 2025 press reports name no fuel supplier, fabrication or delivery for Brigham City reactors. The slide's TRISO fuel manufacturing belongs to Valar Atomics' separate project at the Utah San Rafael Energy Lab. Utah OED: Nuclear Consortium presentation to PUET Committee, 19 November 2025

Not found in the sources we checked (3): Customer or offtaker; Contractor; Comparable schedule revision
Customer or offtaker

The American Public Power Association's 18 November 2025 report, ANS Nuclear Newswire of 19 November 2025 and the Utah Office of Energy Development's 19 November 2025 slide name no buyer, quantity or power purchase agreement for Brigham City SMR output. Brigham City's membership of Utah Associated Municipal Power Systems is not an offtake, and the city and state appear as hosts and announcers. APPA: Utah and industry leaders announce nuclear partnership in Brigham City; Utah OED: Nuclear Consortium presentation to PUET Committee, 19 November 2025

Contractor

The 18 November 2025 American Public Power Association report and the Utah Office of Energy Development's 19 November 2025 slide describe a partnership between Hi Tech Solutions and Holtec to develop a manufacturing facility, a training center and eventually SMR generation in Brigham City. No engineering, licensing or construction contractor for the reactors is named. The universities ANS lists are partners in a workforce-training network, not reactor contractors. APPA: Utah and industry leaders announce nuclear partnership in Brigham City; Utah OED: Nuclear Consortium presentation to PUET Committee, 19 November 2025; ANS Nuclear Newswire: Operation Gigawatt looks to Brigham City, Holtec and Hi Tech Solutions

Comparable schedule revision

Comparable schedule revision not established. The Utah Office of Energy Development's 19 November 2025 slide says groundbreaking on training and manufacturing facilities could start in 2027 and that SMRs are potential in the early 2030s. ANS notes a May 2025 aim for a Utah training facility by 2028 that the new announcement did not repeat. These concern training facilities and a state-wide fleet agreement, not a revised date for the Brigham City reactors. Utah OED: Nuclear Consortium presentation to PUET Committee, 19 November 2025; ANS Nuclear Newswire: Operation Gigawatt looks to Brigham City, Holtec and Hi Tech Solutions

Not recorded in SMRMap's reviewed evidence (3): Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
Operator or intended licensed owner
Site host or owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Assessments of the design (not of this site)

(1)
  • Holtec SMR-300 UK Generic Design Assessment (two steps) — applies to the design, not to a site
    Design assessment · Review completed (not an approval) · ONR/EA (UK) · completed 31 Mar 2026 · submitted Jan 2023
    Holtec submitted the design, then named SMR-160, to the UK government for entry into Generic Design Assessment in January 2023, according to the Environment Agency's Step 1 summary; it was renamed SMR-300 in January 2024. The UK regulators began a two-step Generic Design Assessment of Holtec's SMR-300 on 18 October 2023 at the government's request. Step 1 ran from October 2023 to August 2024 and Step 2 from August 2024 to March 2026. The Environment Agency records completing Step 2 on 31 March 2026, and ONR's page records the assessment as completed that month with no Step 3 and no Design Acceptance Confirmation. The assessment is not permission for any site, construction or operation.
    Sources: Environment Agency: assessing new nuclear reactor designs; ONR, Holtec SMR-300 Generic Design Assessment; Environment Agency: GDA Step 1 of the Holtec SMR, statement of findings public summary

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(6 notes, 1 not yet reviewed)
  • Evidence review. American Public Power Association reported on 18 November 2025 that the Utah governor and the Brigham City mayor announced on 17 November a partnership between Hi Tech Solutions and Holtec to position Brigham City as a nuclear hub, including deployment of the SMR-300. ANS reported that the number of SMR-300 units was not stated. No plot is named. The Deseret News capture is HTTP 200 and 209751 bytes but yielded no article text, so it is an access limit and not evidence that a site is unnamed. No company or state primary page for this announcement was opened. The Utah Office of Energy Development deputy director’s presentation to the PUET Committee on 19 November 2025 is now opened primary evidence for the Brigham City announcement. It describes Hi Tech Solutions and Holtec plans for manufacturing, training and eventual SMR generation. The intended $750 million investment is not documented committed financing; possible 2027 groundbreaking concerns training/manufacturing, while SMRs are described as potential in the early 2030s. No parcel, unit count, operator or nuclear permission is established by this slide. The earlier statement that no state primary page was opened describes the previous review. Last checked 20 Oct 2026. APPA: Utah and industry leaders announce nuclear partnership in Brigham City; ANS Nuclear Newswire: Operation Gigawatt looks to Brigham City, Holtec and Hi Tech Solutions; Deseret News: Gov. Cox announces site for Utah nuclear power plant; Utah OED: Nuclear Consortium presentation to PUET Committee, 19 November 2025
    What would change this

    A project filing naming the reactor parcel, unit count and operating party, or a permission decision; keep training/manufacturing construction separate from reactor construction. Next scheduled check: 20 Jan 2027.

  • Site location recorded as disclosed: Not disclosed in the reviewed evidence. The readable reports place the project in Brigham City and do not name a plot. The Deseret News article, whose headline concerns a site announcement, was not read. Last checked 19 Oct 2026. APPA: Utah and industry leaders announce nuclear partnership in Brigham City; ANS Nuclear Newswire: Operation Gigawatt looks to Brigham City, Holtec and Hi Tech Solutions; Deseret News: Gov. Cox announces site for Utah nuclear power plant
    What would change this

    A readable Holtec, city or Deseret article naming the parcel would settle the site. Next scheduled check: 19 Jan 2027.

  • Primary source. Opened government primary evidence: Utah Office of Energy Development presentation, 19 November 2025, slide 2. It supports the announced Brigham City partnership, not licensing or achieved construction. Last checked 20 Oct 2026. Utah OED: Nuclear Consortium presentation to PUET Committee, 19 November 2025
    What would change this

    This source-identification question is settled; a later project filing or decision requires its own review. Next scheduled check: 20 Jan 2027.

  • Next decision and prerequisites. The Utah Office of Energy Development's November 2025 slides say groundbreaking on the training and manufacturing facilities could start in 2027, with potential SMRs in the early 2030s. These are tentative state-reported targets; no reactor licensing step, site decision or date is given in the sources read. Last checked 23 Oct 2026. Utah OED: Nuclear Consortium presentation to PUET Committee, 19 November 2025
    What would change this

    A groundbreaking on the Brigham City facilities or an NRC filing for the reactors. Next scheduled check: 23 Apr 2027.

  • Permissions and public process. The American Public Power Association's 18 November 2025 report of the state and Brigham City announcement says the project will undergo full state and federal review, including NEPA and NRC oversight, with Utah's Department of Environmental Quality. That describes required reviews, not ones under way; the sources read record no NRC filing, permit, or public hearing for SMR-300s at Brigham City. Last checked 23 Oct 2026. APPA: Utah and industry leaders announce nuclear partnership in Brigham City
    What would change this

    An NRC pre-application or application, or a NEPA notice, for SMR-300s at Brigham City. Next scheduled check: 23 Apr 2027.

  • Site dependencies (land, grid, water): Not disclosed in the reviewed evidence. The November 2025 announcements place the project in Brigham City, Utah, a member of Utah Associated Municipal Power Systems, but ANS noted that the number of SMR-300s planned for the site was not stated. The APPA report, ANS article and Utah energy office slides name no specific parcel, land agreement, grid connection or water source for the reactors. Last checked 23 Oct 2026. APPA: Utah and industry leaders announce nuclear partnership in Brigham City; ANS Nuclear Newswire: Operation Gigawatt looks to Brigham City, Holtec and Hi Tech Solutions
    What would change this

    A site announcement, land agreement or interconnection request for SMR-300s at Brigham City. Next scheduled check: 23 Apr 2027.

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(1 of 4 sources with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated listed source document: Utah OED: Nuclear Consortium presentation to PUET Committee, 19 November 2025: 19 Nov 2025.Latest dated recorded event: no date recorded.3 of 4 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(4)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Holtec SMR-300 proposal in Brigham City, Utah — https://smrmap.com/projects/holtec-brigham-city/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Holtec SMR-300 proposal in Brigham City, Utah”. Record reviewed 2 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/holtec-brigham-city/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.