Projects / United States · Announced

Holtec Oyster Creek SMR proposal

Company proposes four SMR-300 units with expected combined output of 1,360 MWe, gross/net unspecified.

Current status

Stage
Announced
How current
General record check . Bounded evidence review . None of the 3 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

Newest recorded development . Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
Announced 30 Jul 2026 · Announcement: Holtec Oyster Creek SMR proposal documented. Company proposes four SMR-300 units with expected combined output of 1,360 MWe, gross/net unspecified. Source: Holtec Oyster Creek proposal. Updates entry
More on this development

Approval of the former station decommissioning plan is not an SMR construction permit.

Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.
Same design
5 tracked: 1 licensing, 4 announced. 96 tracked at announced across all designs. Recorded stages, not proof of current activity.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Pressurized water reactor. How it works, with a 3D view.
Schematic of Rolls-Royce SMR, this type's example. On the left, a reactor vessel holds a core of fuel assemblies, with control rod drives above its head.
Schematic of Rolls-Royce SMR, this type's example.

Description

Approval of the former station decommissioning plan is not an SMR construction permit.

Key facts

Design
Holtec SMR-300 (SMR)
Technology
Pressurized water reactor (PWR) · light water. The 2024 SMR Technology Catalogue describes a two-loop pressurized water reactor, so no integral layout is recorded.
Operator(s)
Not recorded
Vendor for linked design
Holtec International
Location
Oyster Creek Generating Station site, Lacey Township · United States · precision: site area (named plant, laboratory, base, port, campus or parcel)
Coordinates of the named Oyster Creek Generating Station from the NuclearChain reactors export (CC BY 4.0; derived from GEM's tracker); Holtec identifies the SMR-300 proposal at this Holtec-owned Lacey Township site.
Coordinates
39.8144, -74.2058 · site-area point (approximate)
Electrical capacity
1360 MWe (gross/net unspecified) · scope: plant
Thermal capacity
Not recorded
Modules planned
4
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
2 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

Holtec Oyster Creek SMR proposal is recorded at Oyster Creek Generating Station site, Lacey Township, New Jersey, United States. Operator: No operator is recorded. Recorded vendor: Holtec International. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: NuclearChain reactors.csv export (unit coordinates), NuclearChain reactors.csv row 'oyster-creek-nuclear-power-plant-smr-1' (39.8144, -74.2058)

Recorded electrical output is 1360 MWe (gross/net unspecified), scope plant. Modules planned: 4. Thermal output is not recorded on this project. The linked design record states 300 MWe (net); the project figure is kept separate.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Reactor supplier
Fuel
  • Fuel form stated for Holtec SMR-300UO2 pellet / square array
No project-specific fuel supply arrangement is recorded as a structured fact.

Holtec's 30 July 2026 post on the planned Oyster Creek SMR-300 units names no fuel supplier, fuel contract or delivery for them. Holtec Oyster Creek proposal

Programs and agreements naming the project
Not found in the sources we checked (4): Customer or offtaker; Contractor; Funding and government decisions; Comparable schedule revision
Customer or offtaker

Holtec's 30 July 2026 post says the planned four SMR-300 units at Oyster Creek may bring benefits including the potential integration of AI data centers. It names no data-center operator, utility or other buyer, and no power purchase agreement. Holtec Oyster Creek proposal

Contractor

Holtec's 30 July 2026 post says Holtec has focused on development activities at Oyster Creek and that the site is planned to feature four SMR-300 units. It names no engineering or construction contractor. The NRC approval it reports is the old station's license termination plan, not an SMR permit. Holtec Oyster Creek proposal

Funding and government decisions

Holtec's 30 July 2026 post describes expected jobs, tax revenue and infrastructure investment from the planned Oyster Creek units but states no amount, funder or financing instrument for them. Holtec Oyster Creek proposal

Comparable schedule revision

Comparable schedule revision not established. Holtec's 30 July 2026 post gives no construction or operation date for the Oyster Creek SMR-300 units, and its date refers to the old station's license termination plan approval. With no dated target, there is nothing to revise. Holtec Oyster Creek proposal

Not recorded in SMRMap's reviewed evidence (2): Operator or intended licensed owner; Site host or owner
Operator or intended licensed owner
Site host or owner

Timeline

Recorded developments

Permissions and applications

Assessments of the design (not of this site)

(1)
  • Holtec SMR-300 UK Generic Design Assessment (two steps) — applies to the design, not to a site
    Design assessment · Review completed (not an approval) · ONR/EA (UK) · completed 31 Mar 2026 · submitted Jan 2023
    Holtec submitted the design, then named SMR-160, to the UK government for entry into Generic Design Assessment in January 2023, according to the Environment Agency's Step 1 summary; it was renamed SMR-300 in January 2024. The UK regulators began a two-step Generic Design Assessment of Holtec's SMR-300 on 18 October 2023 at the government's request. Step 1 ran from October 2023 to August 2024 and Step 2 from August 2024 to March 2026. The Environment Agency records completing Step 2 on 31 March 2026, and ONR's page records the assessment as completed that month with no Step 3 and no Design Acceptance Confirmation. The assessment is not permission for any site, construction or operation.
    Sources: Environment Agency: assessing new nuclear reactor designs; ONR, Holtec SMR-300 Generic Design Assessment; Environment Agency: GDA Step 1 of the Holtec SMR, statement of findings public summary

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(4 notes, 1 not yet reviewed)
  • Evidence review. Holtec says the NRC approved the license-termination plan for decommissioning the Oyster Creek Generating Station, and, separately, that the site is planned to feature four SMR-300 units with an expected combined capacity of 1,360 MWe. The same post labels that deployment as forward-looking. Holtec calls itself the owner and developer of the SMR-300 and the NRC-authorized operator of Palisades, and says the first two SMR-300 units are expected at the company-owned Palisades site. That Palisades operator sentence is not an Oyster Creek operating assignment. No Oyster Creek SMR license, fuel contract or financing close is stated. Last checked 19 Oct 2026. Holtec Oyster Creek LTP approval and planned four SMR-300 units
    What would change this

    An NRC application for SMR-300 units at Oyster Creek, or a Holtec withdrawal of the four-unit plan, would change this record. Next scheduled check: 19 Jan 2027.

  • Next decision and prerequisites: Not disclosed in the reviewed evidence. Holtec's July 2026 post says Holtec has focused on development activities at the Oyster Creek site and calls the four-unit SMR-300 plan a potential future deployment, but it names no next licensing step, decision, actor or date for the SMRs. Last checked 23 Oct 2026. Holtec Oyster Creek proposal
    What would change this

    An announced NRC filing, schedule or investment decision for the Oyster Creek SMRs. Next scheduled check: 23 Apr 2027.

  • Permissions and public process. Holtec's 30 July 2026 post says the NRC approved the license termination plan for the shut-down Oyster Creek Generating Station, and separately that the site is planned to feature four SMR-300 units. The approval concerns decommissioning and site restoration of the old plant, not the SMRs; the post cites New Jersey's pro-nuclear legislation as context and records no NRC application, permit or public process for the SMR-300 project. Last checked 23 Oct 2026. Holtec Oyster Creek proposal
    What would change this

    An NRC pre-application or application for SMR-300s at Oyster Creek. Next scheduled check: 23 Apr 2027.

  • Site dependencies (land, grid, water). Holtec's July 2026 post places the four planned SMR-300s at the site of the former Oyster Creek Generating Station in Lacey Township, New Jersey, where Holtec's decommissioning and dismantlement is more than halfway complete and the approved license termination plan guides final decommissioning and site restoration. The post describes no grid connection, cooling-water source or other infrastructure arrangement for the SMRs. Last checked 23 Oct 2026. Holtec Oyster Creek proposal
    What would change this

    A Holtec filing or announcement describing grid and water arrangements for the Oyster Creek SMRs. Next scheduled check: 23 Apr 2027.

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(0 of 3 sources with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated recorded event: Holtec Oyster Creek SMR proposal documented: 30 Jul 2026.3 of 3 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(3)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Holtec Oyster Creek SMR proposal — https://smrmap.com/projects/holtec-oyster-creek/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Holtec Oyster Creek SMR proposal”. Record reviewed 2 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/holtec-oyster-creek/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.