Projects / Poland · Announced

Last Energy ten-SMR plant for the Legnica Special Economic Zone (2022)

Last Energy Polska's ten-reactor plant for Poland's Legnica Special Economic Zone is a proposal under a July 2022 letter of intent with the zone and DB Energy.

Current status

Stage
Announced
How current
General record check . Bounded evidence review . 2 of 4 listed sources have a publication or document date recorded here; the newest is 23 Mar 2023. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • No map pin is shown for this record.
  • Expected for this stage but not recorded as a structured fact: Developer or proposer; Site location recorded as disclosed (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Same design
6 tracked: 1 licensing, 2 siting, 3 announced. 96 tracked at announced across all designs. Recorded stages, not proof of current activity.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Pressurized water reactor. How it works, with a 3D view.
Schematic of Rolls-Royce SMR, this type's example. On the left, a reactor vessel holds a core of fuel assemblies, with control rod drives above its head.
Schematic of Rolls-Royce SMR, this type's example.

Description

The plant of ten small reactors would total 200 MW electric, with the zone and its tenants taking the energy for at least 24 years. The 2022 sources do not name the reactor model; Last Energy's undated LSSE case study identifies ten PWR-20 facilities supplying power and steam. No plant location within the zone or later licensing step is established by these sources, and the undated case study does not establish current project progress. The newest dated source is a March 2023 World Nuclear News report, and later status has not been traced.

Key facts

Design
PWR-20 (Microreactor)
Technology
Pressurized water reactor (PWR) · light water. The 2024 SMR Technology Catalogue describes a single-loop pressurized water reactor, so no integral layout is recorded.
Reactor vessel of this design
8.9 m tall, 1.8 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 65.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
All vessels to scale
Operator(s)
Not recorded
Vendor for linked design
—
Design origin
United States: where the design's vendor is recorded, not where parts are made · See designs from this origin on a 3D globe
Location
Legnica Special Economic Zone · Poland · precision: region only
Searchable without an invented map pin.
Coordinates
Region only, no map pin
Electrical capacity
200 MWe (gross/net unspecified) · scope: plant
Thermal capacity
Not recorded
Modules planned
10
Inclusion basis
Labeled microreactor
Confidence
medium
Record reviewed
2 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

Last Energy ten-SMR plant for the Legnica Special Economic Zone (2022) is recorded at Legnica Special Economic Zone, Lower Silesia, Poland. Operator: No operator is recorded. Recorded vendor: No vendor is recorded. Stage: Announced. Location precision: region only; region only, no map pin.

Recorded electrical output is 200 MWe (gross/net unspecified), scope plant. Modules planned: 10. Thermal output is not recorded on this project. The linked design record states 80 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project. The linked design record states 20 MWe (gross/net unspecified); the project figure is kept separate.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Customer or offtaker
  • Prospective customer / offtaker (binding offtake not established)Legnica Special Economic Zone · sourceWNN’s March 2023 account reports the July 2022 LOI for ten units and at least 24 years of power-purchase terms for LSEZ and unnamed tenants. The reviewed text does not establish an executed PPA.
Source-backed project statement

The Legnica Special Economic Zone's 28 July 2022 announcement says the zone and DB Energy signed a letter of intent with Last Energy Polska for a ten-SMR, 200 MW plant, with the zone and its tenants taking the energy for at least 24 years. This is a letter of intent, not an executed power purchase agreement, and no later step is recorded. LSSE: Jest porozumienie w sprawie budowy elektrowni z 10 małych reaktorów; Industrial users eye small reactors for power supply

Contractor

Source-backed project statement The zone's 28 July 2022 announcement says that under the letter of intent Last Energy would handle the whole investment process and DB Energy, a Wrocław energy-efficiency firm, would integrate the plant's infrastructure with end customers. This is a prospective integration role under a non-binding letter, not an engineering or construction contract, and no later step is recorded. LSSE: Jest porozumienie w sprawie budowy elektrowni z 10 małych reaktorów

Fuel
  • Fuel form stated for PWR-20UO2 pellet / 17x17 grid
No project-specific fuel supply arrangement is recorded as a structured fact.

The Legnica Special Economic Zone's 28 July 2022 announcement says Last Energy's offer runs through to disposal of the installation and fuel, but names no reactor model, fuel manufacturer, quantity or delivery for the Legnica plant. Its reference to fossil-fuel availability explains industrial interest in reactors and is not a fuel commitment. LSSE: Jest porozumienie w sprawie budowy elektrowni z 10 małych reaktorów

Not found in the sources we checked (2): Funding and government decisions; Comparable schedule revision
Funding and government decisions

The Legnica Special Economic Zone's 28 July 2022 announcement says Last Energy's SMR offer generally covers the whole investment process, including financing, but it names no funder, amount, application or award for the ten-reactor Legnica plant. The more than 4.8 billion zloty figure is DB Energy's total for past energy-efficiency projects, not this plant. LSSE: Jest porozumienie w sprawie budowy elektrowni z 10 małych reaktorów

Comparable schedule revision

Comparable schedule revision not established. The Legnica Special Economic Zone's 28 July 2022 announcement dates the letter of intent and an earlier June 2022 protocol on SMR development, and sets a minimum 24-year offtake period. It gives no construction or operation date for the ten-reactor plant, so no schedule revision is shown. LSSE: Jest porozumienie w sprawie budowy elektrowni z 10 małych reaktorów

Not recorded in SMRMap's reviewed evidence (5): Project proposer or applicant; Operator or intended licensed owner; Reactor supplier; Site host or owner; Programs and agreements naming the project
Project proposer or applicant
Operator or intended licensed owner
Reactor supplier
Site host or owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(8 notes)
  • Evidence review. LSSE's 28 July 2022 announcement describes a letter of intent signed by the Legnica Special Economic Zone and DB Energy with Last Energy Polska for ten small reactors with a combined electrical capacity of 200 MW, and prospective energy use by the zone and its tenants for at least 24 years. The 200 MWe is the stated proposed plant total with gross/net unspecified, not a calculated per-module rating. Last Energy Polska is identified as the US Last Energy company's subsidiary and the letter's counterparty. The parent's general description as investor, developer and operator does not appoint either legal entity as this plant's reactor operator. The project operator remains unknown. No reactor model, plot inside the zone or later permission is established by this source; the project remains announced. Last checked 19 Oct 2026. LSSE: Jest porozumienie w sprawie budowy elektrowni z 10 małych reaktorów
    What would change this

    A later Legnica Special Economic Zone or Last Energy notice that names a site, a reactor model, or a step after this letter of intent would change this record. Next scheduled check: 19 Jan 2027.

  • Design identified. Last Energy's undated LSSE case study identifies the proposed ten facilities as PWR-20 reactors supplying power and steam. This supports the model identification for the proposal, without establishing construction permission, an executed construction contract or current project progress. Last checked 26 Oct 2026. Last Energy Advances Plans to Develop 10 Small Modular Nuclear Reactors with LSSE
    What would change this

    A dated developer or licensing document confirming the configuration and progress of the Legnica proposal. Next scheduled check: 19 Jan 2027.

  • Site location recorded as disclosed: Not disclosed in the reviewed evidence. The zone is named. No town, plot, or address for the plant is given. The zone is not a disclosed reactor plot. Last checked 19 Oct 2026. LSSE: Jest porozumienie w sprawie budowy elektrowni z 10 małych reaktorów
    What would change this

    A zone notice that names the plant location inside the Legnica zone. Next scheduled check: 19 Jan 2027.

  • Developer or proposer. The 28 July 2022 zone announcement names Last Energy Polska as the letter-of-intent counterparty and a subsidiary of US Last Energy. The named subsidiary has no independently admitted organization record here; do not substitute its parent as the plant operator or invent an operating appointment. Last checked 19 Oct 2026. LSSE: Jest porozumienie w sprawie budowy elektrowni z 10 małych reaktorów
    What would change this

    An opened Last Energy Polska corporate or project document establishing the subsidiary identity and its project role for a separate organization record. Next scheduled check: 19 Jan 2027.

  • Permissions and public process. The Legnica Special Economic Zone's July 2022 item says the zone and DB Energy signed a letter of intent with Last Energy Polska for a ten-reactor, 200 MW plant with energy taken by the zone and its tenants for at least 24 years. A letter of intent is not a permission; the item shows no decision in principle, environmental procedure or license application. Last checked 23 Oct 2026. LSSE: Jest porozumienie w sprawie budowy elektrowni z 10 małych reaktorów
    What would change this

    A decision in principle, environmental decision or license application for a Last Energy plant in the Legnica zone. Next scheduled check: 23 Oct 2027.

  • Site dependencies (land, grid, water). The July 2022 announcement says the plant would supply energy to investments located in the Legnica Special Economic Zone, but it names no plot within the zone, land arrangement, grid connection or cooling-water source. Last checked 23 Oct 2026. LSSE: Jest porozumienie w sprawie budowy elektrowni z 10 małych reaktorów
    What would change this

    An announcement naming the plant site within the Legnica zone. Next scheduled check: 23 Oct 2027.

  • Spent fuel, waste and closure. The Legnica Special Economic Zone's July 2022 release on the letter of intent says Last Energy's small-reactor offer covers the whole investment process, from design, approvals and financing through operation and energy supply, up to the disposal of the installation and its fuel. That allocates end-of-life and fuel disposal to the developer's offer only as described in a letter-of-intent announcement. It names no storage site, disposal route, funding arrangement or agreement with Poland's waste agency. Last checked 23 Oct 2026. LSSE: Jest porozumienie w sprawie budowy elektrowni z 10 małych reaktorów
    What would change this

    A signed contract, environmental decision or waste-management agreement for the Legnica plant stating spent-fuel storage, disposal and decommissioning responsibility. Next scheduled check: 23 Apr 2027.

  • Next decision and prerequisites. A July 2022 City of Wrocław news item on the letter of intent quotes Last Energy Polska's president saying the next steps were to identify potential locations and then confirm the design assumptions. Last Energy's own case-study page still describes ten PWR-20 units for the zone but gives no location, date or later step. No later Legnica-specific statement was found, so whether locations were identified or the plan continues is not recorded here. Last checked 23 Oct 2026. Wrocławska spółka DB Energy weźmie udział w budowie elektrowni jądrowej na Dolnym Śląsku. Jest porozumienie; Last Energy Advances Plans to Develop 10 Small Modular Nuclear Reactors with LSSE
    What would change this

    A Last Energy or Legnica Special Economic Zone statement naming a location, a binding agreement, a regulatory filing, or an end to the plan would change this answer. Next scheduled check: 23 Apr 2027.

Evidence dates

(2 of 4 sources with a publication or document date)
Latest dated listed source publication: Industrial users eye small reactors for power supply: 23 Mar 2023.Latest dated recorded event: no date recorded.2 of 4 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(4)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Last Energy ten-SMR plant for the Legnica Special Economic Zone (2022) — https://smrmap.com/projects/last-energy-legnica/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Last Energy ten-SMR plant for the Legnica Special Economic Zone (2022)”. Record reviewed 2 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/last-energy-legnica/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.