Projects / United Kingdom · Siting

Last Energy Llynfi PWR-20 proposal

Four PWR-20 units are proposed at the former Llynfi coal station.

Current status

Stage
Siting
How current
General record check . Bounded evidence review . 3 of 6 listed sources have a publication or document date recorded here; the newest is 17 Feb 2025. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

Newest recorded development . Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
Announced 17 Feb 2025 · Announcement: Last Energy Llynfi PWR-20 proposal documented. Four PWR-20 units proposed at the former Llynfi coal station. Source: Last Energy UK site licensing entry. Updates entry
More on this development

ONR's 2 February 2026 licensing page, read 5 October 2026, still describes pre-application engagement, not a filed site-license application and not an issued license. The 2027 first-power date is a target.

Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.
Same design
6 tracked: 1 licensing, 2 siting, 3 announced. 65 tracked at siting across all designs. Recorded stages, not proof of current activity.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Pressurized water reactor. How it works, with a 3D view.
Schematic of Rolls-Royce SMR, this type's example. On the left, a reactor vessel holds a core of fuel assemblies, with control rod drives above its head.
Schematic of Rolls-Royce SMR, this type's example.

Description

ONR says Last Energy has been in early regulatory engagement since May 2024, signalled in January 2025 an intention to apply for a nuclear site license, and completed a preliminary design review in June 2025. Inspectors are giving pre-application advice. The opened ONR page records no site-license application or issued license, so this remains a siting-stage proposal. The 2027 first-power date is a target.

Key facts

Design
PWR-20 (Microreactor)
Technology
Pressurized water reactor (PWR) · light water. The 2024 SMR Technology Catalogue describes a single-loop pressurized water reactor, so no integral layout is recorded.
Reactor vessel of this design
8.9 m tall, 1.8 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 65.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
All vessels to scale
Operator(s)
Not recorded
Vendor for linked design
Last Energy
Design origin
United States: where the design's vendor is recorded, not where parts are made · See designs from this origin on a 3D globe
Location
Former Llynfi Power Station site, South Wales · United Kingdom · precision: site area (named plant, laboratory, base, port, campus or parcel)
Approximate coordinates for the named Llynfi proposal location from the NuclearChain reactors export (CC BY 4.0; derived from GEM's tracker).
Coordinates
51.5707, -3.6126 · site-area point (approximate)
Electrical capacity
20 MWe (gross/net unspecified) · scope: module
Thermal capacity
Not recorded
Modules planned
4
Inclusion basis
Labeled microreactor
Confidence
medium
Record reviewed
18 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

Last Energy Llynfi PWR-20 proposal is recorded at Former Llynfi Power Station site, South Wales, Wales, United Kingdom. Operator: No operator is recorded. Recorded vendor: Last Energy. Stage: Siting. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: NuclearChain reactors.csv export (unit coordinates), NuclearChain reactors.csv row 'llynfi-nuclear-power-plant-1' (51.5706997, -3.6125812)

Recorded electrical output is 20 MWe (gross/net unspecified), scope module. Modules planned: 4. Thermal output is not recorded on this project. The linked design record states 80 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Reactor supplier
Funding and government decisions

Source-backed project statement On 13 December 2024 Last Energy said the Export-Import Bank of the United States issued a non-binding letter of interest to diligence $103.7 million of financing toward one microreactor planned in South Wales. The same release says a final commitment would cover the company's entire costs for a single installation, and that due diligence was still to be completed. The 17 February 2025 release describes that letter as still pending final commitment. It is not money paid. Last Energy: Export-Import Bank of United States Issues LOI to Last Energy; Last Energy UK site licensing entry

Fuel
  • Fuel form stated for PWR-20UO2 pellet / 17x17 grid
No project-specific fuel supply arrangement is recorded as a structured fact.

The EXIM release says the bank's review included Last Energy's access to nuclear fuel. That is company diligence before a non-binding letter of interest, not a named supplier, a quantity, or a delivery to Llynfi. The other opened Llynfi pages do not add a fuel commitment. Last Energy: Export-Import Bank of United States Issues LOI to Last Energy

Not found in the sources we checked (3): Customer or offtaker; Contractor; Comparable schedule revision
Customer or offtaker

The opened releases say the project would serve data centers, industrial customers, mid-size manufacturers, and other customers, and that Last Energy's general model is to serve private industrial customers. Those are unnamed classes. The accepted NGED offer is a grid connection for 22 MW export and 3 MW import, not a power-purchase agreement. No customer is named. Last Energy UK site licensing entry

Contractor

Last Energy describes its own plans to develop four 20 MWe units and says it has hosted supplier engagement events. The ONR page records a preliminary design review and pre-application advice by the regulator. Neither is a named study contract or an EPC award. No construction contractor is named. Last Energy UK site licensing entry; ONR, Licensing of new reactors

Comparable schedule revision

Comparable schedule revision not established. The 17 February 2025 release and the same day's World Nuclear News article both say Last Energy aims to deliver the first Wales microreactor in 2027, pending licensing, permitting, and planning. ONR's page updated 2 February 2026 still describes pre-application advice and does not replace or restate that 2027 target. One target, repeated, is not a revision. Last Energy UK site licensing entry

Not recorded in SMRMap's reviewed evidence (3): Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
Operator or intended licensed owner
Site host or owner
Programs and agreements naming the project

Timeline

Recorded developments

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(5 notes)
  • Evidence review. ONR's licensing page (updated 2 February 2026) says Last Energy has been in its early regulatory engagement framework since May 2024, signalled in January 2025 its intention to apply for a nuclear site license to build four PWR-20 reactors at Llynfi in South Wales, completed a preliminary design review with ONR in June 2025, and is receiving pre-application advice as it prepares its site-license application. World Nuclear News (17 February 2025) and Last Energy's releases describe four 20 MWe microreactors on the 14-acre site of the former Llynfi coal-fired power station at Llangynwyd, Bridgend County, developed as Prosiect Egni Glan Llynfi by Last Energy UK Limited, a subsidiary of Last Energy, with the first unit aimed for 2027 pending licensing, permitting and planning. Other instruments are EXIM's non-binding letter of interest of December 2024 toward $103.7 million of financing for a South Wales microreactor and an accepted NGED grid connection offer of January 2025 for 22 MW export and 3 MW import for the first unit; neither is a final commitment or a physical connection. No source names a customer or an intended operator for Llynfi. The next documentary decision is Last Energy's nuclear site-license application to ONR, alongside planning consent. The stored four PWR-20 units at 20 MWe each, the approximate site point, the siting stage and the 2027 target stay; the stored roles list Last Energy as both proposer and parent, whereas the sources name Last Energy UK Limited as developer and Last Energy as its parent. Last checked 19 Oct 2026. ONR, Licensing of new reactors; World Nuclear News: Last Energy seeks site licence for Welsh microreactor plant; Last Energy: Last Energy Receives Grid Connection Offer For South Wales Microreactors; Last Energy UK site licensing entry
    What would change this

    Last Energy UK's nuclear site license application to ONR (and ONR's acceptance of it), or a planning decision for the Llynfi site; either would move the record toward licensing. Next scheduled check: 19 Jan 2027.

  • Next decision and prerequisites. The next regulatory step is a nuclear site license application to ONR, which its page does not yet record, along with other permits. Last Energy aims to deliver its first microreactor in 2027, pending licensing and permitting; that is a company target, not a regulatory schedule. Last checked 23 Oct 2026. ONR, Licensing of new reactors; Last Energy UK site licensing entry
    What would change this

    An ONR site-license application or decision, or a planning application, for Llynfi. Next scheduled check: 21 Jan 2027.

  • Permissions and public process. ONR says Last Energy has been in its early regulatory engagement framework since May 2024 and in January 2025 signalled its intention to apply for a nuclear site license for four PWR-20 units at Llynfi. Last Energy's February 2025 release calls this formally entering site licensing. ONR's page records pre-application work, not a license application or license, and the opened sources record no planning consent. Last checked 23 Oct 2026. ONR, Licensing of new reactors; Last Energy UK site licensing entry
    What would change this

    An ONR notice of a nuclear site license application for Llynfi, or a planning decision for the site. Next scheduled check: 21 Jan 2027.

  • Site dependencies (land, grid, water). Last Energy says it obtained control of the vacant former Llynfi coal power station site in October 2024 and, in January 2025, accepted a National Grid Electricity Distribution connection offer for 22 MW of export capacity. These are company statements; the terms of site control and of the connection offer are not published, and no cooling arrangement is described. Last checked 23 Oct 2026. Last Energy UK site licensing entry
    What would change this

    A planning or license application describing land, grid and cooling arrangements at Llynfi. Next scheduled check: 21 Jan 2027.

  • Spent fuel, waste and closure: Not disclosed in the reviewed evidence. The ONR page says the June 2025 preliminary design review included environment and decommissioning among three topics chosen by Last Energy. That is a review topic, not a spent-fuel, waste, or closure arrangement for Llynfi. The December 2024, January 2025, and February 2025 company releases do not state one. Last checked 23 Oct 2026. ONR, Licensing of new reactors; Last Energy: Export-Import Bank of United States Issues LOI to Last Energy; Last Energy: Last Energy Receives Grid Connection Offer For South Wales Microreactors
    What would change this

    A Llynfi document that states spent-fuel storage, waste disposition, or closure arrangements. Next scheduled check: 21 Jan 2027.

Evidence dates

(3 of 6 sources with a publication or document date)
Latest dated listed source publication: World Nuclear News: Last Energy seeks site licence for Welsh microreactor plant: 17 Feb 2025.Latest dated recorded event: Last Energy Llynfi PWR-20 proposal documented: 17 Feb 2025.3 of 6 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(6)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Last Energy Llynfi PWR-20 proposal — https://smrmap.com/projects/last-energy-llynfi/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Last Energy Llynfi PWR-20 proposal”. Record reviewed 18 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/last-energy-llynfi/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.