Projects / United Kingdom · Announced
Last Energy London Gateway PWR-20 proposal
Last Energy's London Gateway port power proposal under an MOU, for one 20 MWe PWR-20 unit in the United Kingdom, is at the announced stage and targets 2030.
Current status
- How current
- General record check . Bounded evidence review . The listed source has no publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
Newest recorded development . Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- Announced 15 Sep 2025 · Announcement: Last Energy London Gateway PWR-20 proposal documented. Port power proposal under an MOU, targeting 2030. Source: Last Energy DP World London Gateway MOU. Updates entry
More on this development
This announcement does not establish financing, permission to construct or physical construction.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Thermal output is not recorded on this project.
- No operator is recorded.
- The mapped point is not an exact surveyed coordinate.
- State or province is not recorded.
- Same design
- 6 tracked: 1 licensing, 2 siting, 3 announced. 96 tracked at announced across all designs. Recorded stages, not proof of current activity.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
- Reactor type
- Pressurized water reactor. How it works, with a 3D view.
View on the map · View on the 3D globe · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
This announcement does not establish financing, permission to construct or physical construction.
Key facts
- Design
- PWR-20 (Microreactor)
- Technology
- Pressurized water reactor (PWR) · light water. The 2024 SMR Technology Catalogue describes a single-loop pressurized water reactor, so no integral layout is recorded.
- Reactor vessel of this design
- 8.9 m tall, 1.8 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 65.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
All vessels to scale - Operator(s)
- Not recorded
- Vendor for linked design
- Last Energy
- Design origin
- United States: where the design's vendor is recorded, not where parts are made · See designs from this origin on a 3D globe
- Location
- London Gateway port · United Kingdom · precision: site area (named plant, laboratory, base, port, campus or parcel)
OSM industrial-area centroid for London Gateway Port, the named host port under the MOU; the microreactor plot within the port is not published. Geocode: Query 'London Gateway Port' -> landuse=industrial 'London Gateway Port, Coryton, Thurrock, Essex, England, SS17 9DY, United Kingdom'. (Plain 'London Gateway' query returned unrelated Southwark streets; not used.) - Coordinates
- 51.504834, 0.492401 · site-area point (approximate)
- Electrical capacity
- 20 MWe (gross/net unspecified) · scope: module
- Thermal capacity
- Not recorded
- Inclusion basis
- Labeled microreactor
- Confidence
- medium
- Record reviewed
- 2 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes
Last Energy London Gateway PWR-20 proposal is recorded at London Gateway port, state or province not recorded, United Kingdom. Operator: No operator is recorded. Recorded vendor: Last Energy. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).
Coordinate source: OpenStreetMap Nominatim geocoder, OpenStreetMap Nominatim result: 'London Gateway Port' (landuse=industrial), Coryton, Thurrock
Recorded electrical output is 20 MWe (gross/net unspecified), scope module. Modules planned: 1. Thermal output is not recorded on this project. The linked design record states 80 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Reactor supplier
- Vendor for the linked designLast Energy
- Customer or offtaker
- Prospective customer / offtaker (binding offtake not established)DP World · sourceMOU proposes power for DP World’s London Gateway expansion. This identifies intended consumption, not an executed PPA or committed third-party project financing.
Source-backed project statement
Last Energy's 15 September 2025 release says it and DP World signed a memorandum of understanding for a micro-nuclear plant that would supply power for DP World's ongoing expansion of London Gateway. A memorandum of understanding is not an executed power purchase agreement. Last Energy DP World London Gateway MOU
- Funding and government decisions
Source-backed project statement The 15 September 2025 release calls the initiative an £80 million subsidy-free investment for development of Last Energy's first unit. DP World's separate £1 billion port expansion is not this reactor's financing. The release does not say the £80 million has been raised, spent, or committed by a named lender. Last Energy DP World London Gateway MOU
- Fuel
- Fuel form stated for PWR-20UO2 pellet / 17x17 grid
The release says the company uses existing global fuel supply chains. That is a company-wide statement, not a supplier, quantity, or delivery for London Gateway. No fuel contract is named. Last Energy DP World London Gateway MOU
Not found in the sources we checked (2): Contractor; Comparable schedule revision
- Contractor
The release says Last Energy and DP World will work with regulators and local stakeholders. It names no engineering firm, study contractor, or construction contractor. The memorandum is not an EPC award. South Wales licensing mentioned later in the release is a different project. Last Energy DP World London Gateway MOU
- Comparable schedule revision
Comparable schedule revision not established. The release aims to begin operations in 2030. That is one target. The same release says a PWR-20 licensing schedule would conclude by the end of 2027 in the South Wales licensing passage. That is a different project and a different milestone, not a revision of London Gateway operations. Last Energy DP World London Gateway MOU
Not recorded in SMRMap's reviewed evidence (4): Project proposer or applicant; Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
- Project proposer or applicant
- No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
- Operator or intended licensed owner
- Site host or owner
- Programs and agreements naming the project
Timeline
Recorded developments
- Announced · Announcement
Last Energy London Gateway PWR-20 proposal documented
This project’s dated entries are in Updates, filtered to this project. New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(4 notes, 1 not yet reviewed)
- Evidence review. On 15 September 2025 Last Energy and DP World signed a memorandum of understanding for a port microreactor at London Gateway. The release calls it an 80 million pound subsidy-free investment for Last Energy's first unit there, and says a proposed PWR-20 would supply 20 MWe to the logistics hub with further power exported to the grid. Operations are aimed at 2030. The parties say they will work with regulators and local stakeholders. No construction permission, operating license, fuel contract, or named operator is stated. The stored announced stage, PWR-20 design, and 20 MWe stay. South Wales licensing mentioned in the same release is a different project. Last checked 19 Oct 2026. Last Energy DP World London Gateway MOU
What would change this
A UK regulatory application or permission for a reactor at London Gateway, or a contract replacing this memorandum, would change this record. Next scheduled check: 19 Jan 2027.
- Next decision and prerequisites: Not disclosed in the reviewed evidence. The September 2025 MOU release aims for operations in 2030 and says the partners will work with regulators and local stakeholders, but it does not name the next consequential decision, such as a licensing application, investment decision or planning filing, or give a date for one. Last checked 23 Oct 2026. Last Energy DP World London Gateway MOU
What would change this
A Last Energy or DP World announcement of a licensing application, final agreement or investment decision for London Gateway. Next scheduled check: 23 Apr 2027.
- Permissions and public process. Last Energy's September 2025 release says it and DP World signed a memorandum of understanding for a micro nuclear plant at London Gateway and will work closely with regulators and local stakeholders. A memorandum is not a permission, and the release shows no site license application, planning application or public consultation for the PWR-20 unit. Last checked 23 Oct 2026. Last Energy DP World London Gateway MOU
What would change this
An ONR site license application, planning application or public consultation for the London Gateway microreactor. Next scheduled check: 23 Apr 2027.
- Site dependencies (land, grid, water). The September 2025 release places the proposed PWR-20 at DP World's London Gateway port, supplying 20 MWe to the logistics hub with any additional output exported to the grid, and links it to the port's expansion at Corringham. No plot, land agreement, grid connection agreement or cooling arrangement is described. Last checked 23 Oct 2026. Last Energy DP World London Gateway MOU
What would change this
A planning application or grid connection agreement for the London Gateway microreactor. Next scheduled check: 23 Apr 2027.
Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.
Evidence dates
(0 of 1 source with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(1)
- Last Energy DP World London Gateway MOU (company, accessed 1 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: Last Energy London Gateway PWR-20 proposal — https://smrmap.com/projects/last-energy-london-gateway/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “Last Energy London Gateway PWR-20 proposal”. Record reviewed 2 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/last-energy-london-gateway/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.