Projects / United Kingdom · Announced

Last Energy London Gateway PWR-20 proposal

Last Energy's London Gateway port power proposal under an MOU, for one 20 MWe PWR-20 unit in the United Kingdom, is at the announced stage and targets 2030.

Current status

Stage
Announced
How current
General record check . Bounded evidence review . The listed source has no publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

Newest recorded development . Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
Announced 15 Sep 2025 · Announcement: Last Energy London Gateway PWR-20 proposal documented. Port power proposal under an MOU, targeting 2030. Source: Last Energy DP World London Gateway MOU. Updates entry
More on this development

This announcement does not establish financing, permission to construct or physical construction.

Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.
  • State or province is not recorded.
Same design
6 tracked: 1 licensing, 2 siting, 3 announced. 96 tracked at announced across all designs. Recorded stages, not proof of current activity.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Pressurized water reactor. How it works, with a 3D view.
Schematic of Rolls-Royce SMR, this type's example. On the left, a reactor vessel holds a core of fuel assemblies, with control rod drives above its head.
Schematic of Rolls-Royce SMR, this type's example.

Description

This announcement does not establish financing, permission to construct or physical construction.

Key facts

Design
PWR-20 (Microreactor)
Technology
Pressurized water reactor (PWR) · light water. The 2024 SMR Technology Catalogue describes a single-loop pressurized water reactor, so no integral layout is recorded.
Reactor vessel of this design
8.9 m tall, 1.8 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 65.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
All vessels to scale
Operator(s)
Not recorded
Vendor for linked design
Last Energy
Design origin
United States: where the design's vendor is recorded, not where parts are made · See designs from this origin on a 3D globe
Location
London Gateway port · United Kingdom · precision: site area (named plant, laboratory, base, port, campus or parcel)
OSM industrial-area centroid for London Gateway Port, the named host port under the MOU; the microreactor plot within the port is not published. Geocode: Query 'London Gateway Port' -> landuse=industrial 'London Gateway Port, Coryton, Thurrock, Essex, England, SS17 9DY, United Kingdom'. (Plain 'London Gateway' query returned unrelated Southwark streets; not used.)
Coordinates
51.504834, 0.492401 · site-area point (approximate)
Electrical capacity
20 MWe (gross/net unspecified) · scope: module
Thermal capacity
Not recorded
Modules planned
1
Inclusion basis
Labeled microreactor
Confidence
medium
Record reviewed
2 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

Last Energy London Gateway PWR-20 proposal is recorded at London Gateway port, state or province not recorded, United Kingdom. Operator: No operator is recorded. Recorded vendor: Last Energy. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: OpenStreetMap Nominatim geocoder, OpenStreetMap Nominatim result: 'London Gateway Port' (landuse=industrial), Coryton, Thurrock

Recorded electrical output is 20 MWe (gross/net unspecified), scope module. Modules planned: 1. Thermal output is not recorded on this project. The linked design record states 80 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Reactor supplier
Customer or offtaker
  • Prospective customer / offtaker (binding offtake not established)DP World · sourceMOU proposes power for DP World’s London Gateway expansion. This identifies intended consumption, not an executed PPA or committed third-party project financing.
Source-backed project statement

Last Energy's 15 September 2025 release says it and DP World signed a memorandum of understanding for a micro-nuclear plant that would supply power for DP World's ongoing expansion of London Gateway. A memorandum of understanding is not an executed power purchase agreement. Last Energy DP World London Gateway MOU

Funding and government decisions

Source-backed project statement The 15 September 2025 release calls the initiative an £80 million subsidy-free investment for development of Last Energy's first unit. DP World's separate £1 billion port expansion is not this reactor's financing. The release does not say the £80 million has been raised, spent, or committed by a named lender. Last Energy DP World London Gateway MOU

Fuel
  • Fuel form stated for PWR-20UO2 pellet / 17x17 grid
No project-specific fuel supply arrangement is recorded as a structured fact.

The release says the company uses existing global fuel supply chains. That is a company-wide statement, not a supplier, quantity, or delivery for London Gateway. No fuel contract is named. Last Energy DP World London Gateway MOU

Not found in the sources we checked (2): Contractor; Comparable schedule revision
Contractor

The release says Last Energy and DP World will work with regulators and local stakeholders. It names no engineering firm, study contractor, or construction contractor. The memorandum is not an EPC award. South Wales licensing mentioned later in the release is a different project. Last Energy DP World London Gateway MOU

Comparable schedule revision

Comparable schedule revision not established. The release aims to begin operations in 2030. That is one target. The same release says a PWR-20 licensing schedule would conclude by the end of 2027 in the South Wales licensing passage. That is a different project and a different milestone, not a revision of London Gateway operations. Last Energy DP World London Gateway MOU

Not recorded in SMRMap's reviewed evidence (4): Project proposer or applicant; Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
Project proposer or applicant
No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
Operator or intended licensed owner
Site host or owner
Programs and agreements naming the project

Timeline

Recorded developments

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(4 notes, 1 not yet reviewed)
  • Evidence review. On 15 September 2025 Last Energy and DP World signed a memorandum of understanding for a port microreactor at London Gateway. The release calls it an 80 million pound subsidy-free investment for Last Energy's first unit there, and says a proposed PWR-20 would supply 20 MWe to the logistics hub with further power exported to the grid. Operations are aimed at 2030. The parties say they will work with regulators and local stakeholders. No construction permission, operating license, fuel contract, or named operator is stated. The stored announced stage, PWR-20 design, and 20 MWe stay. South Wales licensing mentioned in the same release is a different project. Last checked 19 Oct 2026. Last Energy DP World London Gateway MOU
    What would change this

    A UK regulatory application or permission for a reactor at London Gateway, or a contract replacing this memorandum, would change this record. Next scheduled check: 19 Jan 2027.

  • Next decision and prerequisites: Not disclosed in the reviewed evidence. The September 2025 MOU release aims for operations in 2030 and says the partners will work with regulators and local stakeholders, but it does not name the next consequential decision, such as a licensing application, investment decision or planning filing, or give a date for one. Last checked 23 Oct 2026. Last Energy DP World London Gateway MOU
    What would change this

    A Last Energy or DP World announcement of a licensing application, final agreement or investment decision for London Gateway. Next scheduled check: 23 Apr 2027.

  • Permissions and public process. Last Energy's September 2025 release says it and DP World signed a memorandum of understanding for a micro nuclear plant at London Gateway and will work closely with regulators and local stakeholders. A memorandum is not a permission, and the release shows no site license application, planning application or public consultation for the PWR-20 unit. Last checked 23 Oct 2026. Last Energy DP World London Gateway MOU
    What would change this

    An ONR site license application, planning application or public consultation for the London Gateway microreactor. Next scheduled check: 23 Apr 2027.

  • Site dependencies (land, grid, water). The September 2025 release places the proposed PWR-20 at DP World's London Gateway port, supplying 20 MWe to the logistics hub with any additional output exported to the grid, and links it to the port's expansion at Corringham. No plot, land agreement, grid connection agreement or cooling arrangement is described. Last checked 23 Oct 2026. Last Energy DP World London Gateway MOU
    What would change this

    A planning application or grid connection agreement for the London Gateway microreactor. Next scheduled check: 23 Apr 2027.

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(0 of 1 source with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated recorded event: Last Energy London Gateway PWR-20 proposal documented: 15 Sep 2025.1 of 1 listed source has no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(1)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Last Energy London Gateway PWR-20 proposal — https://smrmap.com/projects/last-energy-london-gateway/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Last Energy London Gateway PWR-20 proposal”. Record reviewed 2 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/last-energy-london-gateway/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.