Projects / United States · Announced

NuScale plant proposal at Savannah River Site (2012)

NuScale's potential plant at the Savannah River Site is a historical proposal from March 2012, when it signed a memorandum of agreement with DOE-Savannah River.

Current status

Stage
Announced
How current
General record check . Bounded evidence review . None of the 2 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.
  • Expected for this stage but not recorded as a structured fact: Design identified (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Description

NuScale called the memorandum the first step in the potential deployment of a NuScale plant at the site, where several locations were identified. The 2012 design used 45 MWe modules, an earlier version than VOYGR. NuScale is the vendor of the proposed plant; the 2012 announcements name no operator or licensee. No license application or construction is documented.

Key facts

Design
Design profile not linked (SMR)
Technology
Not recorded on a linked design profile — see the description
Operator(s)
Not recorded
Vendor for linked design
NuScale Power
Location
Savannah River Site · United States · precision: site area (named plant, laboratory, base, port, campus or parcel)
Reservation point from the Wikipedia article for the Savannah River Site; DOE's 2012 agreements name the site but no plot on the 310-square-mile reservation, so this marks the reservation area (Hanford and Portsmouth precedent), shared by the three 2012 proposals.
Coordinates
33.25, -81.65 · site-area point (approximate)
Electrical capacity
45 MWe (gross/net unspecified) · scope: module
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Earlier-plan record (historical SMR program)
Confidence
medium
Record reviewed
2 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes

NuScale plant proposal at Savannah River Site (2012) is recorded at Savannah River Site, South Carolina, United States. Operator: No operator is recorded. Recorded vendor: NuScale Power. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate). Other records at this site: Hyperion / Gen4 Module proposal at Savannah River Site (2012), Holtec SMR-160 proposal at Savannah River Site (2012).

Coordinate source: Wikipedia: Savannah River Site (article coordinates), Article coordinate 33.25, -81.65 on 'Savannah River Site', read 30 October 2026

Recorded electrical output is 45 MWe (gross/net unspecified), scope module. Module count is not recorded. Thermal output is not recorded on this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Reactor supplier
  • Vendor named for this project (no design profile is linked)NuScale Power
Not found in the sources we checked (5): Customer or offtaker; Contractor; Funding and government decisions; Fuel; Comparable schedule revision
Customer or offtaker

NuScale's 7 March 2012 release says a NuScale plant in South Carolina could provide clean energy and economic development at the Savannah River Site and the region, with modules added as customer demand grows. Those are general uses. Neither the release nor DOE's 2 March 2012 notice names a buyer of the plant's power. NuScale: memorandum of agreement with DOE Savannah River

Contractor

DOE's 2 March 2012 notice and NuScale's 7 March 2012 release describe a memorandum among DOE, the Savannah River Site, its national laboratory and NuScale as a framework for later land-use and site-services agreements and a first step toward potential deployment. That is a site-host agreement with the vendor, not a contractor appointment. The release's mention of Fluor engineers working on NuScale's technology is not an assignment to this plant. DOE: Energy Department announces small modular reactor technology partnerships at Savannah River; NuScale: memorandum of agreement with DOE Savannah River

Funding and government decisions

DOE's 2 March 2012 notice says the Savannah River memorandums do not constitute a federal funding commitment and that private funding is envisioned. NuScale's 7 March 2012 release says NuScale intended to compete for a separate DOE five-year SMR cost-share program, which is an intention to apply, not funding for this plant. No funder or amount is stated. NuScale: memorandum of agreement with DOE Savannah River; DOE: Energy Department announces small modular reactor technology partnerships at Savannah River

Fuel
No design profile is linked, so no stated fuel is shown.No project-specific fuel supply arrangement is recorded as a structured fact.

NuScale's 7 March 2012 release describes refuelling one module without affecting the others, which is a design feature. Neither the release nor DOE's 2 March 2012 notice names a fuel supplier, allocation or delivery for a Savannah River NuScale plant. NuScale: memorandum of agreement with DOE Savannah River

Comparable schedule revision

Comparable schedule revision not established. DOE's 2 March 2012 notice and NuScale's 7 March 2012 release date the same memorandum and give no construction or operation date for a Savannah River NuScale plant. With no dated target there is nothing to revise. DOE: Energy Department announces small modular reactor technology partnerships at Savannah River; NuScale: memorandum of agreement with DOE Savannah River

Not recorded in SMRMap's reviewed evidence (3): Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
Operator or intended licensed owner
Site host or owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(6 notes, 1 not yet reviewed)
  • Evidence review. On 2 March 2012 the Energy Department announced three separate Savannah River Site memorandums of agreement, including one with NuScale Power, LLC, to support possible private-sector development, testing and licensing of prototype small modular reactors at site facilities near Aiken, South Carolina. The department said those memorandums are not a federal funding commitment and that they provide a framework for later land-use and site-services agreements. NuScale's release datelined Portland, 7 March 2012, calls the memorandum the first step in potential deployment of a plant using NuScale technology at the site and says several locations on the 310-square-mile site were identified as likely suitable. The same company description says each module produces 45 megawatts and that a plant can include as many as 12 modules and 540 megawatts. That is a product ceiling, not a module count or a plant rating chosen for Savannah River, and it is not the later 77 MWe VOYGR. No operator, licensee, design version name, or single plot is stated. The stored 45 MWe module figure, null module count, null design, shared site record and announced stage stay. Last checked 20 Oct 2026. DOE: Energy Department announces small modular reactor technology partnerships at Savannah River; NuScale: memorandum of agreement with DOE Savannah River
    What would change this

    A later Savannah River or NuScale document that either selects one plot for this 2012 proposal or names the design version and module count actually chosen for it. Next scheduled check: 20 Jan 2027.

  • Design identified: Not disclosed in the reviewed evidence. Read the 2 March 2012 Energy Department announcement and NuScale's 7 March 2012 release. They describe NuScale technology and a 45 MWe module, and a ceiling of 12 modules, but they do not name a design version or a committed configuration for Savannah River. Last checked 20 Oct 2026. NuScale: memorandum of agreement with DOE Savannah River; DOE: Energy Department announces small modular reactor technology partnerships at Savannah River
    What would change this

    A NuScale or Savannah River document that names the 2012 design version, or that explicitly says no version was selected. Next scheduled check: 20 Jan 2027.

  • Site location recorded as disclosed: Not disclosed in the reviewed evidence. Read both 2012 pages. They place the proposal at Savannah River Site near Aiken and say several locations on the 310-square-mile site were likely suitable. They do not name one plot. The shared site record carries a reservation-area point for all three 2012 proposals, not a plot. Last checked 20 Oct 2026. NuScale: memorandum of agreement with DOE Savannah River; DOE: Energy Department announces small modular reactor technology partnerships at Savannah River
    What would change this

    A site-services agreement or map that identifies one Savannah River plot for the NuScale 2012 proposal. Next scheduled check: 20 Jan 2027.

  • Next decision and prerequisites: Not disclosed in the reviewed evidence. NuScale's March 2012 release describes the Savannah River agreement as the first step in a potential deployment and says NuScale intended to compete for DOE's SMR cost-share program, but neither 2012 announcement sets a next decision or date for a plant at the site. No later decision on a NuScale plant at Savannah River is recorded in these sources. Last checked 23 Oct 2026. NuScale: memorandum of agreement with DOE Savannah River
    What would change this

    A record of a NuScale or DOE decision on deployment at the Savannah River Site. Next scheduled check: 23 Apr 2027.

  • Permissions and public process: Not disclosed in the reviewed evidence. DOE's 2 March 2012 announcement says its memoranda of agreement with NuScale and two other developers would help support potential private development, testing and licensing of SMR prototypes at the Savannah River Site, and NuScale's 7 March 2012 release calls its agreement the first step toward potential deployment. Neither names an NRC application, environmental review or public process for a NuScale plant at the site. Last checked 23 Oct 2026. DOE: Energy Department announces small modular reactor technology partnerships at Savannah River
    What would change this

    A record of an NRC filing or environmental review for a NuScale plant at the Savannah River Site. Next scheduled check: 23 Apr 2027.

  • Site dependencies (land, grid, water). NuScale's March 2012 release says that, based on its input, the Savannah River Site identified several locations on the 310-square-mile site likely suitable for project development, and DOE said the agreements provide a framework for developing land-use and site-services agreements. No specific location, land-use agreement or site-services agreement was concluded in these sources. Last checked 23 Oct 2026. NuScale: memorandum of agreement with DOE Savannah River; DOE: Energy Department announces small modular reactor technology partnerships at Savannah River
    What would change this

    A record of a land-use or site-services agreement for NuScale at the Savannah River Site. Next scheduled check: 23 Apr 2027.

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(0 of 2 sources with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated recorded event: no date recorded.2 of 2 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(2)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: NuScale plant proposal at Savannah River Site (2012) — https://smrmap.com/projects/nuscale-srs-2012/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “NuScale plant proposal at Savannah River Site (2012)”. Record reviewed 2 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/nuscale-srs-2012/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.