Projects / Poland · Siting

OSGE Stalowa Wola BWRX-300

Named OSGE BWRX-300 location in three-site CfD application.

Current status

Stage
Siting
How current
General record check . Bounded evidence review . 1 of 7 listed sources has a publication or document date recorded here: 5 Nov 2025. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.
Same design
18 tracked: 1 construction, 4 licensing, 10 siting, 3 announced. 65 tracked at siting across all designs. Recorded stages, not proof of current activity.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Boiling water reactor. How it works, with a 3D view.
Schematic of BWRX-300. A tall reactor vessel with, from bottom to top, control rods and drives, the core, a tall chimney, steam separators and a steam dryer.
Schematic of BWRX-300.

Description

One project record. The site holds a 2023 decision in principle; OSGE names the Euro-Park Stalowa Wola investment park as host (April 2026) and included it in its June 2026 contract-for-difference application. On 16 April 2026, ARP, OSGE and the project company signed a letter of intent concerning possible ARP investment in the Stalowa Wola project company. An investment decision remained conditional on agreeing transaction terms; the announcement stated no committed amount or disbursement.

Key facts

Design
BWRX-300 (SMR)
Technology
Boiling water reactor (BWR) · light water
Reactor vessel of this design
27 m tall, 4 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 25.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
All vessels to scale
Operator(s)
Not recorded
Vendor for linked design
GE Vernova Hitachi Nuclear Energy
Design origin
United States: where the design's vendor is recorded, not where parts are made · See designs from this origin on a 3D globe
Location
Stalowa Wola SMR area · Poland · precision: town or locality only
Town point for Stalowa Wola from its Wikipedia article; OSGE names the town, not a parcel. Replaces an earlier hand-placed point that recorded no coordinate source.
Coordinates
50.56778, 22.05972 · town-level point (approximate)
Electrical capacity
300 MWe (net) · scope: module
Thermal capacity
Not recorded
Modules planned
Not recorded. The letter of intent says the decision in principle allows a maximum of four BWRX-300 units at Stalowa Wola.
Inclusion basis
SMR by design class
Confidence
medium
Record reviewed
2 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes

OSGE Stalowa Wola BWRX-300 is recorded at Stalowa Wola SMR area, Subcarpathian, Poland. Operator: No operator is recorded. Recorded vendor: GE Vernova Hitachi Nuclear Energy. Stage: Siting. Location precision: town or locality only; town-level point (approximate).

Coordinate source: Wikipedia: Stalowa Wola (article coordinates), Article coordinate 50.56778, 22.05972 on 'Stalowa Wola', read 30 October 2026

Recorded electrical output is 300 MWe (net), scope module. Module count is not recorded. Thermal output is not recorded on this project. The linked design record states 870 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Reactor supplier
Funding and government decisions

Source-backed project statement The project is included in OSGE’s three-location contract-for-difference application. On 16 April 2026, ARP, OSGE and the project company signed a letter of intent concerning possible ARP investment. An investment decision remained conditional on agreeing transaction terms; the announcement states no committed amount or disbursement. OSGE: ARP and OSGE letter of intent for Stalowa Wola; OSGE CfD application three sites; OSGE applies for the EU's first contract for difference for SMRs; OSGE news index reviewed 21 October 2026

Not found in the sources we checked (4): Customer or offtaker; Contractor; Fuel; Comparable schedule revision
Customer or offtaker

The reviewed sources do not establish a named project-specific power or heat purchaser, contractual quantity or completed offtake. Intended uses, host municipalities and general company customer plans are not buyer commitments. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE: ARP and OSGE letter of intent for Stalowa Wola; OSGE CfD application three sites; OSGE six decisions in principle

Contractor

The reviewed sources do not establish an additional project-specific engineering, preparatory-work or construction assignment. A supplier’s general capabilities or an industry-wide agreement do not establish a contract for this site. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE: ARP and OSGE letter of intent for Stalowa Wola; OSGE CfD application three sites; OSGE applies for the EU's first contract for difference for SMRs; OSGE news index reviewed 21 October 2026; OSGE six decisions in principle

Fuel
No fuel form or enrichment is recorded on the linked design profile.No project-specific fuel supply arrangement is recorded as a structured fact.

The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE: Orano regional SMR deployment framework; OSGE: ARP and OSGE letter of intent for Stalowa Wola; OSGE six decisions in principle

Comparable schedule revision

Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE: ARP and OSGE letter of intent for Stalowa Wola; OSGE CfD application three sites; OSGE applies for the EU's first contract for difference for SMRs; OSGE: first locations presented

Not recorded in SMRMap's reviewed evidence (4): Project proposer or applicant; Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
Project proposer or applicant
No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
Operator or intended licensed owner
Reviewed 20 Oct 2026: not disclosed in the reviewed evidence.
Site host or owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Assessments of the design (not of this site)

(2)
  • BWRX-300 UK Generic Design Assessment (two steps) — applies to the design, not to a site
    Design assessment · Review completed (not an approval) · ONR/EA (UK) · completed Dec 2025
    The UK regulators began a two-step Generic Design Assessment of the GE Vernova Hitachi BWRX-300 on 25 January 2024 at the government's request. Step 1 ran from January to December 2024 and Step 2 from December 2024 to December 2025, when ONR issued its Step 2 GDA statement and the Environment Agency and Natural Resources Wales their Step 2 summary of findings. ONR's page records no Step 3 and no Design Acceptance Confirmation. The assessment is not permission for any site, construction or operation.
    Sources: ONR, GE Vernova Hitachi BWRX-300 Generic Design Assessment; Environment Agency: assessing new nuclear reactor designs
  • CNSC vendor design review, Phases 1 and 2 (BWRX-300) — applies to the design, not to a site
    Design assessment · Review completed (not an approval) · CNSC · completed Mar 2023
    CNSC lists a combined Phase 1 and 2 pre-licensing vendor design review of GE Hitachi's BWRX-300 among its completed reviews, with an executive summary dated March 2023. CNSC entered into the agreement with GE Hitachi to conduct the review on 11 December 2019; that is an agreement date, not an application or a decision. CNSC says a vendor design review does not certify a design, issue a license or bind later Commission decisions. The Darlington license to construct is a separate, site-specific permission.
    Sources: CNSC: vendor design review service agreements and completed reviews; CNSC: GE Hitachi BWRX-300 vendor design review executive summary

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(7 notes)
  • Evidence review. The letter of intent covers small modular reactors at the Strategic Investment Park in Stalowa Wola and names two properties, 101 ha and 166 ha, that a maximum of four BWRX-300 units is not stored, and that 1,500 MW is estimated park-investor demand in 2030 rather than plant output. The stored 300 MWe module figure stays and the module count stays empty. The Polish OSGE page says the decision in principle allows a maximum of four BWRX-300 blocks here, and that the environmental application to GDOŚ is being finalized. The English contract-for-difference page says the Stalowa Wola environmental application has been submitted. Those two OSGE statements are not the same status. Neither selects one of the two properties or a committed unit count. The participating organizations retain only their source-supported roles; a reactor operator is not assigned from the study, proposer, parent, existing-fleet or proposed-owner relationship. Last checked 20 Oct 2026. OSGE: ARP and OSGE letter of intent for Stalowa Wola; OSGE CfD application three sites
    What would change this

    A Stalowa Wola decision that chooses one of the two properties and a unit count, and a single OSGE statement of whether the GDOŚ application has been submitted. Next scheduled check: 20 Jan 2027.

  • Module/unit count: Not disclosed in the reviewed evidence. The letter of intent says the decision in principle allows a maximum of four BWRX-300 units at Stalowa Wola. A maximum is not the selected module count. Last checked 19 Oct 2026. OSGE: ARP and OSGE letter of intent for Stalowa Wola
    What would change this

    An application that states how many units are selected for Stalowa Wola. Next scheduled check: 19 Jan 2027.

  • Operator or intended licensed owner: Not disclosed in the reviewed evidence. The reviewed sources establish other participant roles, but do not appoint the recorded party as this reactor’s operator. The operator remains unassigned; this does not assert that no operator exists. Last checked 20 Oct 2026. OSGE: ARP and OSGE letter of intent for Stalowa Wola
    What would change this

    A project-specific filing, operating agreement or developer statement explicitly names the proposed reactor operator. Next scheduled check: 20 Jan 2027.

  • Next decision and prerequisites. With its decision-in-principle, OSGE may apply for further permits for Tarnobrzeg-Stalowa Wola, such as a siting decision and later a construction license. No application or date for those steps is recorded in the opened source. Last checked 23 Oct 2026. OSGE six decisions in principle
    What would change this

    An OSGE application for, or issue of, a siting decision for the Tarnobrzeg-Stalowa Wola project. Next scheduled check: 21 Jan 2027.

  • Permissions and public process. OSGE reports that Poland's Ministry of Climate and Environment issued a decision-in-principle for a BWRX-300 plant at Tarnobrzeg-Stalowa Wola, one of six issued on applications by OSGE's special-purpose companies. Under Polish law this is the first administrative decision for a nuclear investment. It is not a siting decision, environmental decision or construction license, and none is recorded for this site. Last checked 23 Oct 2026. OSGE six decisions in principle
    What would change this

    A siting decision, environmental decision or construction-license application for the Tarnobrzeg-Stalowa Wola project. Next scheduled check: 21 Jan 2027.

  • Site dependencies (land, grid, water). OSGE's April 2026 release says the BWRX-300 units would be built in the Euro-Park Stalowa Wola strategic investment park, an area of almost 1,000 hectares within the Tarnobrzeg special economic zone managed by ARP. Its June 2026 release says the application for the environmental assessment scoping decision for Stalowa Wola has been submitted. The plot within the park, grid connection and cooling water are not described in the sources reviewed. Last checked 23 Oct 2026. OSGE: ARP and OSGE letter of intent for Stalowa Wola; OSGE CfD application three sites
    What would change this

    A GDOŚ scoping decision for Stalowa Wola or grid connection conditions from PSE. Next scheduled check: 23 Apr 2027.

  • Spent fuel, waste and closure: Not disclosed in the reviewed evidence. OSGE's November 2025 release says it signed a framework agreement with Orano covering fuel-cycle services for its BWRX-300 program, including spent fuel reprocessing and recycling, transport and storage, and decommissioning. The agreement is fleet-wide and does not name Stalowa Wola; it is a framework, not a contract for specific services, and no site-specific spent fuel storage or disposal arrangement for Stalowa Wola is described in the sources reviewed. Last checked 23 Oct 2026. OSGE: Orano regional SMR deployment framework
    What would change this

    An environmental impact report, license application or services contract setting spent fuel and waste arrangements for the Stalowa Wola plant. Next scheduled check: 23 Oct 2027.

Evidence dates

(1 of 7 sources with a publication or document date)
Latest dated listed source publication: OSGE: Orano regional SMR deployment framework: 5 Nov 2025.Latest dated recorded event: no date recorded.6 of 7 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(7)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: OSGE Stalowa Wola BWRX-300 — https://smrmap.com/projects/osge-stalowa-wola-bwrx-300/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “OSGE Stalowa Wola BWRX-300”. Record reviewed 2 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/osge-stalowa-wola-bwrx-300/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.