Designs

BWRX-300

Natural-circulation boiling-water SMR, about 300 MWe per module. ONR's BWRX-300 page, as read on 5 October 2026, says the UK reactor-design assessment was completed in December 2025 after Step 1 (January to December 2024) and Step 2 (December 2024 to December 2025). A Step 2 GDA statement was issued. The page does not record Step 3 or a Design Acceptance Confirmation. A completed Step 2 assessment is not permission for any site.

Reactor type
Boiling water reactor. How it works, with a 3D view.
Projects
Construction: Darlington BWRX-300 Unit 1. Furthest recorded stage of 18 using this design.
Evidence
4 sources; first primary source: CNSC Darlington New Nuclear Project. Record reviewed 5 Oct 2026.
Schematic of BWRX-300. A tall reactor vessel with, from bottom to top, control rods and drives, the core, a tall chimney, steam separators and a steam dryer.
Schematic of BWRX-300.

Key facts

Class
SMR
Technology
Boiling water reactor (BWR)
Coolant
Light water
Spectrum
Thermal
Developer / vendor(s)
GE Vernova Hitachi Nuclear Energy
Module electrical
300 MWe (net)
Module thermal
870 MWth (nameplate; basis unspecified)
Reactor vessel
27 m tall, 4 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 25.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
10 m bar; a person 1.8 m tall
BWRX-300
27 m tall, 4 m across
All vessels to scale
Inclusion basis
SMR by design class
Confidence
high
Record reviewed
5 Oct 2026 (record review date, not proof of current availability or a deployment)

Tracked deployment projects

(18)

Agreements naming this design

(11)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(4)

Evidence and open questions

(1 note)
  • Evidence review. The CNSC Darlington New Nuclear Project page (modified 2026-08-25) describes the GE Vernova Hitachi BWRX-300 as a 300 MWe water-cooled, natural circulation small modular reactor; it gives no gross or net basis and no thermal rating. ONR's BWRX-300 GDA page (updated 3 February 2026) names GE Vernova Hitachi Nuclear Energy Americas LLC as designer and records the UK reactor-design assessment as completed in December 2025 after Step 1 (January to December 2024) and Step 2 (December 2024 to December 2025); a completed Step 2 is a design-stage instrument, not a site permission. The CNSC page connects the design to Darlington: a license to construct 1 BWRX-300 issued in April 2025, the first regulatory hold point removed on March 30, 2026, a March 2026 application for a 20-year license to operate, and a possible future application for up to 3 additional units (the two Darlington project records). TVA's release of 29 September 2026 connects Clinch River to the design: it says Clinch River Unit 1 is a GE Vernova Hitachi BWRX-300, and the NRC construction permit CPAR-2 for that unit is recorded on the Clinch River page. The other linked deployments (the Polish OSGE sites, Rockport, Letart, Estonia, Sweden, Saskatchewan, Victoria) are tied to this design by the sources cited on their own project pages, not by a source opened in this review. The attached ARIS URL returned only a 42-character page title, so no ARIS design passage was read. Stored vendor, BWR family, light-water coolant and the 300 MWe figure stay; the stored 'net' electrical basis, the 870 MWth thermal rating and the thermal neutron spectrum are not stated by any opened source and rest on earlier evidence. Last checked 19 Oct 2026. ONR, GE Vernova Hitachi BWRX-300 Generic Design Assessment; TVA construction permit announcement; CNSC Darlington New Nuclear Project
    What would change this

    The CNSC Commission decision on OPG's March 2026 application for a license to operate the first Darlington BWRX-300, or an ONR/Environment Agency decision on whether the BWRX-300 proceeds to GDA Step 3 or a Design Acceptance Confirmation. Next scheduled check: 19 Jan 2027.

Regulatory actions

(10)

Compare reviews and approvals across designs

Design assessment

  • BWRX-300 UK Generic Design Assessment (two steps) — applies to the design, not to a site
    Design assessment · Review completed (not an approval) · ONR/EA (UK) · completed Dec 2025
    The UK regulators began a two-step Generic Design Assessment of the GE Vernova Hitachi BWRX-300 on 25 January 2024 at the government's request. Step 1 ran from January to December 2024 and Step 2 from December 2024 to December 2025, when ONR issued its Step 2 GDA statement and the Environment Agency and Natural Resources Wales their Step 2 summary of findings. ONR's page records no Step 3 and no Design Acceptance Confirmation. The assessment is not permission for any site, construction or operation.
    Sources: ONR, GE Vernova Hitachi BWRX-300 Generic Design Assessment; Environment Agency: assessing new nuclear reactor designs
  • CNSC vendor design review, Phases 1 and 2 (BWRX-300) — applies to the design, not to a site
    Design assessment · Review completed (not an approval) · CNSC · completed Mar 2023
    CNSC lists a combined Phase 1 and 2 pre-licensing vendor design review of GE Hitachi's BWRX-300 among its completed reviews, with an executive summary dated March 2023. CNSC entered into the agreement with GE Hitachi to conduct the review on 11 December 2019; that is an agreement date, not an application or a decision. CNSC says a vendor design review does not certify a design, issue a license or bind later Commission decisions. The Darlington license to construct is a separate, site-specific permission.
    Sources: CNSC: vendor design review service agreements and completed reviews; CNSC: GE Hitachi BWRX-300 vendor design review executive summary

Site applications and decisions

Construction applications and decisions

Operating-license applications and decisions