Projects / Poland · Siting

OSGE Stawy Monowskie BWRX-300

Named OSGE BWRX-300 deployment location near Oswiecim in the three-site CfD application.

Current status

Stage
Siting
How current
General record check . Bounded evidence review . 3 of 8 listed sources have a publication or document date recorded here; the newest is 22 Oct 2026. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.
Same design
18 tracked: 1 construction, 4 licensing, 10 siting, 3 announced. 65 tracked at siting across all designs. Recorded stages, not proof of current activity.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Boiling water reactor. How it works, with a 3D view.
Schematic of BWRX-300. A tall reactor vessel with, from bottom to top, control rods and drives, the core, a tall chimney, steam separators and a steam dryer.
Schematic of BWRX-300.

Description

One project (not each unit). OSGE's 22 October 2026 release says SGE is to be responsible for this project as lead investor, on the same cooperation principles as Włocławek.

Key facts

Design
BWRX-300 (SMR)
Technology
Boiling water reactor (BWR) · light water
Reactor vessel of this design
27 m tall, 4 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 25.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
All vessels to scale
Operator(s)
Not recorded
Vendor for linked design
GE Vernova Hitachi Nuclear Energy
Design origin
United States: where the design's vendor is recorded, not where parts are made · See designs from this origin on a 3D globe
Location
Stawy Monowskie near Oswiecim SMR area · Poland · precision: town or locality only
NuclearChain reactors export point for the OSGE Stawy Monowskie entry (CC BY 4.0, derived from GEM's Global Nuclear Power Tracker); locality point near Oświęcim, not surveyed unit positions.
Coordinates
50.024621, 19.3339713 · town-level point (approximate)
Electrical capacity
300 MWe (net) · scope: module
Thermal capacity
Not recorded
Modules planned
Not recorded. The request covers 14 units across three locations and also names a 26-unit program.
Inclusion basis
SMR by design class
Confidence
medium
Record reviewed
1 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes

OSGE Stawy Monowskie BWRX-300 is recorded at Stawy Monowskie near Oswiecim SMR area, Lesser Poland, Poland. Operator: No operator is recorded. Recorded vendor: GE Vernova Hitachi Nuclear Energy. Stage: Siting. Location precision: town or locality only; town-level point (approximate).

Coordinate source: NuclearChain reactors.csv export (unit coordinates), NuclearChain reactors.csv row 'stawy-monowskie-nuclear-power-plant-1' (50.024621, 19.3339713)

Recorded electrical output is 300 MWe (net), scope module. Module count is not recorded. Thermal output is not recorded on this project. The linked design record states 870 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Reactor supplier
Funding and government decisions

Source-backed project statement OSGE reports a contract-for-difference application covering three locations, including Stawy Monowskie. The reviewed announcement does not establish an awarded contract, per-site allocation or payment. OSGE CfD application three sites; OSGE applies for the EU's first contract for difference for SMRs; OSGE news index reviewed 21 October 2026

Not found in the sources we checked (4): Customer or offtaker; Contractor; Fuel; Comparable schedule revision
Customer or offtaker

The reviewed sources do not establish a named project-specific power or heat purchaser, contractual quantity or completed offtake. Intended uses, host municipalities and general company customer plans are not buyer commitments. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE CfD application three sites; OSGE applies for the EU's first contract for difference for SMRs; OSGE six decisions in principle; OSGE: first locations presented

Contractor

The reviewed sources do not establish an additional project-specific engineering, preparatory-work or construction assignment. A supplier’s general capabilities or an industry-wide agreement do not establish a contract for this site. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE CfD application three sites; OSGE six decisions in principle; OSGE news index reviewed 21 October 2026

Fuel
No fuel form or enrichment is recorded on the linked design profile.No project-specific fuel supply arrangement is recorded as a structured fact.

The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE: Orano regional SMR deployment framework; OSGE CfD application three sites; OSGE six decisions in principle

Comparable schedule revision

Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE CfD application three sites; OSGE: first locations presented; OSGE six decisions in principle; OSGE: Orano regional SMR deployment framework

Not recorded in SMRMap's reviewed evidence (3): Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
Operator or intended licensed owner
Reviewed 20 Oct 2026: not disclosed in the reviewed evidence.
Site host or owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Assessments of the design (not of this site)

(2)
  • BWRX-300 UK Generic Design Assessment (two steps) — applies to the design, not to a site
    Design assessment · Review completed (not an approval) · ONR/EA (UK) · completed Dec 2025
    The UK regulators began a two-step Generic Design Assessment of the GE Vernova Hitachi BWRX-300 on 25 January 2024 at the government's request. Step 1 ran from January to December 2024 and Step 2 from December 2024 to December 2025, when ONR issued its Step 2 GDA statement and the Environment Agency and Natural Resources Wales their Step 2 summary of findings. ONR's page records no Step 3 and no Design Acceptance Confirmation. The assessment is not permission for any site, construction or operation.
    Sources: ONR, GE Vernova Hitachi BWRX-300 Generic Design Assessment; Environment Agency: assessing new nuclear reactor designs
  • CNSC vendor design review, Phases 1 and 2 (BWRX-300) — applies to the design, not to a site
    Design assessment · Review completed (not an approval) · CNSC · completed Mar 2023
    CNSC lists a combined Phase 1 and 2 pre-licensing vendor design review of GE Hitachi's BWRX-300 among its completed reviews, with an executive summary dated March 2023. CNSC entered into the agreement with GE Hitachi to conduct the review on 11 December 2019; that is an agreement date, not an application or a decision. CNSC says a vendor design review does not certify a design, issue a license or bind later Commission decisions. The Darlington license to construct is a separate, site-specific permission.
    Sources: CNSC: vendor design review service agreements and completed reviews; CNSC: GE Hitachi BWRX-300 vendor design review executive summary

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(7 notes)
  • Evidence review. The 14-unit request and the 26-unit program are not this site's module count, that Stawy Monowskie has a decision in principle, a GDOŚ scoping decision and grid-connection conditions, and that the stored 300 MWe module figure stays. The same page is dated 29/06/2026 and says the government will prepare European Commission notification documents. Fourteen and twenty-six remain fleet figures. The participating organizations retain only their source-supported roles; a reactor operator is not assigned from the study, proposer, parent, existing-fleet or proposed-owner relationship. Last checked 20 Oct 2026. OSGE CfD application three sites
    What would change this

    A Stawy Monowskie notice that states this site's unit count, or a construction-permit application. Next scheduled check: 20 Jan 2027.

  • Module/unit count: Not disclosed in the reviewed evidence. The request covers 14 units across three locations and also names a 26-unit program. Neither number is a count for Stawy Monowskie. Last checked 19 Oct 2026. OSGE CfD application three sites
    What would change this

    A Stawy Monowskie application that states how many BWRX-300 units are proposed at that site. Next scheduled check: 19 Jan 2027.

  • Operator or intended licensed owner: Not disclosed in the reviewed evidence. The reviewed sources establish other participant roles, but do not appoint the recorded party as this reactor’s operator. The operator remains unassigned; this does not assert that no operator exists. Last checked 20 Oct 2026. OSGE CfD application three sites
    What would change this

    A project-specific filing, operating agreement or developer statement explicitly names the proposed reactor operator. Next scheduled check: 20 Jan 2027.

  • Next decision and prerequisites. With its decision-in-principle, OSGE may apply for further permits for Stawy Monowskie, such as a siting decision and later a construction license. No application or date for those steps is recorded in the opened source. Last checked 23 Oct 2026. OSGE six decisions in principle
    What would change this

    An OSGE application for, or issue of, a siting decision for the Stawy Monowskie project. Next scheduled check: 21 Jan 2027.

  • Permissions and public process. OSGE reports that Poland's Ministry of Climate and Environment issued a decision-in-principle for a BWRX-300 plant at Stawy Monowskie, one of six issued on applications by OSGE's special-purpose companies. Under Polish law this is the first administrative decision for a nuclear investment. It is not a siting decision, environmental decision or construction license, and none is recorded for this site. Last checked 23 Oct 2026. OSGE six decisions in principle
    What would change this

    A siting decision, environmental decision or construction-license application for the Stawy Monowskie project. Next scheduled check: 21 Jan 2027.

  • Site dependencies (land, grid, water). OSGE's June 2026 release says it holds grid connection conditions from the transmission operator PSE for the Stawy Monowskie site near Oświęcim, and World Nuclear News reported that GDOŚ's February 2024 scoping decision requires the environmental report to identify possible cooling-water sources and how the plant will connect to the transmission network. Connection conditions are terms, not a built connection, and the cooling-water source and plot are not yet fixed in the sources reviewed. Last checked 23 Oct 2026. OSGE CfD application three sites; Environmental permitting of Polish SMR plant progresses
    What would change this

    The environmental impact report for Stawy Monowskie or a signed grid connection agreement. Next scheduled check: 23 Apr 2027.

  • Spent fuel, waste and closure: Not disclosed in the reviewed evidence. OSGE's November 2025 release says it signed a framework agreement with Orano covering fuel-cycle services for its BWRX-300 program, including spent fuel reprocessing and recycling, transport and storage, and decommissioning. The agreement is fleet-wide and does not name Stawy Monowskie; it is a framework, not a contract for specific services, and no site-specific spent fuel storage or disposal arrangement for Stawy Monowskie is described in the sources reviewed. Last checked 23 Oct 2026. OSGE: Orano regional SMR deployment framework
    What would change this

    An environmental impact report, license application or services contract setting spent fuel and waste arrangements for the Stawy Monowskie plant. Next scheduled check: 23 Oct 2027.

Evidence dates

(3 of 8 sources with a publication or document date)
Latest dated listed source publication: Orlen, SGE i OSGE zawarły Porozumienie Parasolowe dotyczące współpracy przy programie SMR BWRX-300: 22 Oct 2026.Latest dated recorded event: no date recorded.5 of 8 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(8)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: OSGE Stawy Monowskie BWRX-300 — https://smrmap.com/projects/osge-stawy-monowskie-bwrx-300/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “OSGE Stawy Monowskie BWRX-300”. Record reviewed 1 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/osge-stawy-monowskie-bwrx-300/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.