Projects / Poland · Siting
OSGE Wloclawek BWRX-300
OSGE's project for up to six BWRX-300 units at Włocławek, Poland, is at the siting stage.
Current status
- How current
- General record check . Bounded evidence review . 4 of 12 listed sources have a publication or document date recorded here; the newest is 22 Oct 2026. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
No dated development is recorded. Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- No actual dated development is recorded.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Thermal output is not recorded on this project.
- No operator is recorded.
- The mapped point is not an exact surveyed coordinate.
- Same design
- 18 tracked: 1 construction, 4 licensing, 10 siting, 3 announced. 65 tracked at siting across all designs. Recorded stages, not proof of current activity.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
- Reactor type
- Boiling water reactor. How it works, with a 3D view.
View on the map · View on the 3D globe · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
Municipal cooperation agreement (Jun 2026); EIA scoping and site studies. Preparation is not a construction permit. The proposed units form one project. A June 2026 city agreement covers up to six reactors in Włocławek. OSGE's release of 29 June 2026 assumed the first unit would be commissioned there in 2032; its release of 22 October 2026 says the first unit is to be commissioned there in the mid-2030s. That release describes an umbrella agreement among Orlen, SGE and OSGE under which the project is to be carried out in stages by the special-purpose company BWRX-300 Włocławek sp. z o.o., which it describes as controlled by Orlen, with Orlen as lead investor at this site; the agreement sets out Orlen's share structure and how it takes control of the plant company. Detailed implementing agreements were still to be concluded.
Key facts
- Design
- BWRX-300 (SMR)
- Technology
- Boiling water reactor (BWR) · light water
- Reactor vessel of this design
- 27 m tall, 4 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 25.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
All vessels to scale - Operator(s)
- Not recorded
- Vendor for linked design
- GE Vernova Hitachi Nuclear Energy
- Design origin
- United States: where the design's vendor is recorded, not where parts are made · See designs from this origin on a 3D globe
- Location
- Wloclawek BWRX-300 project area · Poland · precision: town or locality only
NuclearChain reactors export point for the OSGE Włocławek entry (CC BY 4.0, derived from GEM's Global Nuclear Power Tracker), which the export marks as approximate; town-level point while site studies continue. - Coordinates
- 52.6718091, 19.0537634 · town-level point (approximate)
- Electrical capacity
- 300 MWe (net) · scope: module
- Thermal capacity
- Not recorded
- Modules planned
- Not recorded. Up to six reactors are proposed; this is an upper bound, not a selected six-unit configuration.
- Inclusion basis
- SMR by design class
- Confidence
- high
- Record reviewed
- 2 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes
OSGE Wloclawek BWRX-300 is recorded at Wloclawek BWRX-300 project area, Kuyavian-Pomeranian, Poland. Operator: No operator is recorded. Recorded vendor: GE Vernova Hitachi Nuclear Energy. Stage: Siting. Location precision: town or locality only; town-level point (approximate).
Coordinate source: NuclearChain reactors.csv export (unit coordinates), NuclearChain reactors.csv row 'w-oc-awek-nuclear-power-plant-1' (52.6718091, 19.0537634)
Recorded electrical output is 300 MWe (net), scope module. Module count is not recorded. Thermal output is not recorded on this project. The linked design record states 870 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Project proposer or applicant
- Project proposerORLEN Synthos Green Energy · source
- Reactor supplier
- Vendor for the linked designGE Vernova Hitachi Nuclear Energy
- Customer or offtaker
Source-backed project statement The GDOŚ scoping decision of 28 January 2025 identifies Anwil S.A.'s industrial plant as an intended recipient of part of the proposed plant's electricity. This establishes planned use, not an executed offtake contract, contractual quantity or price; no heat purchaser is identified. Postanowienie GDOŚ DOOŚ-WDŚI.420.47.2023.SP.36 (zakres raportu, BWRX-300 Włocławek)
- Funding and government decisions
Source-backed project statement OSGE reports a contract-for-difference application covering Włocławek, Stawy Monowskie and Stalowa Wola. An application is not an awarded contract, per-site allocation or payment. OSGE's 22 October 2026 release says each project stage will have its own schedule, budget and scope, with financing of later stages tied to delivery of earlier assumptions. No amount or commitment is stated. OSGE CfD application three sites; OSGE applies for the EU's first contract for difference for SMRs; OSGE news index reviewed 21 October 2026; Wloclawek and OSGE cooperation agreement
- Comparable schedule revision
Source-backed project statement OSGE's 29 June 2026 release assumed the first BWRX-300 unit would be commissioned at Włocławek in 2032. Its 22 October 2026 release says the first unit at Włocławek is to be commissioned in the mid-2030s (the same Polish verb, uruchomienie/uruchomiony, in both). Both are OSGE statements about the same milestone, and neither is a permit date. OSGE's 29 September 2026 release said the first BWRX-300 in Poland may start in 2032 without naming a site. OSGE applies for the EU's first contract for difference for SMRs; Orlen, SGE i OSGE zawarły Porozumienie Parasolowe dotyczące współpracy przy programie SMR BWRX-300; OSGE: BWRX-300 z pozwoleniem na budowę w USA
Not found in the sources we checked (2): Contractor; Fuel
- Contractor
The reviewed sources do not establish an additional project-specific engineering, preparatory-work or construction assignment. A supplier’s general capabilities or an industry-wide agreement do not establish a contract for this site. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Wloclawek and OSGE cooperation agreement; OSGE: Włocławek and OSGE sign cooperation agreement; OSGE news index reviewed 21 October 2026; OSGE six decisions in principle; OSGE: ARP and OSGE letter of intent for Stalowa Wola
- Fuel
- No fuel form or enrichment is recorded on the linked design profile.No project-specific fuel supply arrangement is recorded as a structured fact.
The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE: Orano regional SMR deployment framework; Wloclawek and OSGE cooperation agreement; OSGE CfD application three sites; OSGE six decisions in principle
Not recorded in SMRMap's reviewed evidence (3): Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
- Operator or intended licensed owner
- Reviewed 20 Oct 2026: not disclosed in the reviewed evidence.
- Site host or owner
- Programs and agreements naming the project
Timeline
Targets
Planned, target and estimated dates are not achievements or commitments.
- Target · Planned step
OSGE states first Włocławek BWRX-300 unit is to be commissioned in the mid-2030s
This project’s dated entries are in Updates, filtered to this project. New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Assessments of the design (not of this site)
(2)
- BWRX-300 UK Generic Design Assessment (two steps) — applies to the design, not to a site
Design assessment · Review completed (not an approval) · ONR/EA (UK) · completed Dec 2025
The UK regulators began a two-step Generic Design Assessment of the GE Vernova Hitachi BWRX-300 on 25 January 2024 at the government's request. Step 1 ran from January to December 2024 and Step 2 from December 2024 to December 2025, when ONR issued its Step 2 GDA statement and the Environment Agency and Natural Resources Wales their Step 2 summary of findings. ONR's page records no Step 3 and no Design Acceptance Confirmation. The assessment is not permission for any site, construction or operation.
Sources: ONR, GE Vernova Hitachi BWRX-300 Generic Design Assessment; Environment Agency: assessing new nuclear reactor designs - CNSC vendor design review, Phases 1 and 2 (BWRX-300) — applies to the design, not to a site
Design assessment · Review completed (not an approval) · CNSC · completed Mar 2023
CNSC lists a combined Phase 1 and 2 pre-licensing vendor design review of GE Hitachi's BWRX-300 among its completed reviews, with an executive summary dated March 2023. CNSC entered into the agreement with GE Hitachi to conduct the review on 11 December 2019; that is an agreement date, not an application or a decision. CNSC says a vendor design review does not certify a design, issue a license or bind later Commission decisions. The Darlington license to construct is a separate, site-specific permission.
Sources: CNSC: vendor design review service agreements and completed reviews; CNSC: GE Hitachi BWRX-300 vendor design review executive summary
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(7 notes)
- Evidence review. The 22 June 2026 agreement says OSGE plans to build up to six BWRX-300 reactors in Włocławek, that the 300 MWe module figure and the 2032 planned year remain; up to six is an upper bound, so no single module count is stored, and that site studies lead toward a construction-permit application. The special-purpose vehicle holds the decision in principle and the GDOŚ scoping decision. Stage stays siting. The Polish page uses the same up-to-six wording. The participating organizations retain only their source-supported roles; a reactor operator is not assigned from the study, proposer, parent, existing-fleet or proposed-owner relationship. Last checked 20 Oct 2026. Wloclawek and OSGE cooperation agreement; OSGE CfD application three sites; OSGE: Włocławek and OSGE sign cooperation agreement
What would change this
A Włocławek construction-permit application, or a notice that selects a unit count rather than an up-to-six plan. Next scheduled check: 20 Jan 2027.
- Operator or intended licensed owner: Not disclosed in the reviewed evidence. The reviewed sources establish other participant roles, but do not appoint the recorded party as this reactor’s operator. The operator remains unassigned; this does not assert that no operator exists. Last checked 20 Oct 2026. Wloclawek and OSGE cooperation agreement
What would change this
A project-specific filing, operating agreement or developer statement explicitly names the proposed reactor operator. Next scheduled check: 20 Jan 2027.
- Module/unit count: Not disclosed in the reviewed evidence. Up to six reactors are proposed; this is an upper bound, not a selected six-unit configuration. No single planned module count or derived plant total is recorded. Last checked 20 Oct 2026. Wloclawek and OSGE cooperation agreement
What would change this
A project-specific filing selects the number of reactor modules. Next scheduled check: 20 Jan 2027.
- Next decision and prerequisites. With its decision-in-principle, OSGE may apply for further permits for Włocławek, such as a siting decision and later a construction license. No application or date for those steps is recorded in the opened source. OSGE's 22 October 2026 release lists as next steps starting environmental and site studies, work on a support model with the Ministry of Energy, and preparing and filing a construction-permit application with the National Atomic Energy Agency, and says the parties want implementing agreements concluded this year. OSGE's June 2026 release had said those studies were already under way. Last checked 23 Oct 2026. OSGE six decisions in principle
What would change this
An OSGE application for, or issue of, a siting decision for the Włocławek project. Next scheduled check: 21 Jan 2027.
- Permissions and public process. OSGE reports that Poland's Ministry of Climate and Environment issued a decision-in-principle for a BWRX-300 plant at Włocławek, one of six issued on applications by OSGE's special-purpose companies. Under Polish law this is the first administrative decision for a nuclear investment. It is not a siting decision, environmental decision or construction license, and none is recorded for this site. Last checked 23 Oct 2026. OSGE six decisions in principle
What would change this
A siting decision, environmental decision or construction-license application for the Włocławek project. Next scheduled check: 21 Jan 2027.
- Site dependencies (land, grid, water). GDOŚ's 28 January 2025 decision setting the scope of the Włocławek environmental report describes a site of about 135 hectares in western Włocławek next to the Anwil chemical plant, with cooling water taken from the Vistula about 3 km away through pipelines crossing Anwil's land, and power lines to Anwil and the national grid. It requires open and closed cooling options to be assessed. These are the developer's planned arrangements under assessment, not secured permits or connection agreements. Last checked 23 Oct 2026. Postanowienie GDOŚ DOOŚ-WDŚI.420.47.2023.SP.36 (zakres raportu, BWRX-300 Włocławek)
What would change this
The Włocławek environmental impact report, the GDOŚ environmental decision or grid connection conditions. Next scheduled check: 23 Apr 2027.
- Spent fuel, waste and closure. GDOŚ's January 2025 scoping decision describes planned on-site buildings including a spent nuclear fuel store and a radioactive waste store, with each reactor's spent fuel pool holding eight years of fuel plus a full core. It requires the environmental report to set out current plans for Poland's new low- and intermediate-level waste repository and the waste expected from operating and decommissioning the plant. These are planned arrangements and reporting requirements, not a contracted storage or disposal route. Last checked 23 Oct 2026. Postanowienie GDOŚ DOOŚ-WDŚI.420.47.2023.SP.36 (zakres raportu, BWRX-300 Włocławek)
What would change this
The Włocławek environmental impact report or a license application setting the spent fuel and waste route. Next scheduled check: 23 Apr 2027.
Evidence dates
(4 of 12 sources with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(12)
- Wloclawek and OSGE cooperation agreement (company, accessed 1 Oct 2026)
- OSGE CfD application three sites (company, accessed 1 Oct 2026)
- OSGE: Włocławek and OSGE sign cooperation agreement (company, accessed 2 Oct 2026)
- OSGE applies for the EU's first contract for difference for SMRs (company, accessed 2 Oct 2026)
- OSGE six decisions in principle (company, accessed 1 Oct 2026)
- OSGE: first locations presented (company, accessed 2 Oct 2026)
- OSGE news index reviewed 21 October 2026 (company, accessed 21 Oct 2026)
- OSGE: ARP and OSGE letter of intent for Stalowa Wola (company, accessed 2 Oct 2026)
- OSGE: Orano regional SMR deployment framework (company, published 5 Nov 2025, accessed 21 Oct 2026)
- Postanowienie GDOŚ DOOŚ-WDŚI.420.47.2023.SP.36 (zakres raportu, BWRX-300 Włocławek) (government, published 28 Jan 2025, accessed 23 Oct 2026)
- Orlen, SGE i OSGE zawarły Porozumienie Parasolowe dotyczące współpracy przy programie SMR BWRX-300 (company, published 22 Oct 2026, accessed 11 Nov 2026)
- OSGE: BWRX-300 z pozwoleniem na budowę w USA (company, published 29 Sep 2026, accessed 11 Nov 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: OSGE Wloclawek BWRX-300 — https://smrmap.com/projects/osge-wloclawek-bwrx-300/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “OSGE Wloclawek BWRX-300”. Record reviewed 2 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/osge-wloclawek-bwrx-300/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.