Projects / United States · Announced

Penn State FRONTIER eVinci research proposal

University identifies a proposed eVinci research facility at University Park and initial NRC engagement.

Current status

Stage
Announced
How current
General record check . Bounded evidence review . None of the 2 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.
Same design
5 tracked: 1 siting, 2 announced. Separately: 2 canceled. 96 tracked at announced across all designs. Recorded stages, not proof of current activity.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Heat-pipe microreactor. How it works, with a 3D view.
Schematic of eVinci. A horizontal canister holds a graphite core block with rows of fuel compacts, with control drums above and below it and shutdown rods coming in from the left.
Schematic of eVinci.

Description

Campus placement remains under assessment. This is separate from the existing Breazeale reactor; no construction, operating status or selected capacity is inherited.

Key facts

Design
eVinci (Microreactor)
Technology
Other · other
Operator(s)
Not recorded
Vendor for linked design
Westinghouse Electric Company
Location
University Park campus, Penn State · United States · precision: site area (named plant, laboratory, base, port, campus or parcel)
Campus pin (RELLIS precedent) for the named University Park campus; Penn State says it will still determine possible locations for the facility on campus, so this is not a facility point. Geocode: Query 'Pennsylvania State University, University Park' -> amenity=university 'Penn State University, 201, Shamrock Avenue, Dalevue, Lemont, College Township, Centre County, Pennsylvania, 16802, United States'. Do not use the Breazeale react
Coordinates
40.812897, -77.871057 · site-area point (approximate)
Electrical capacity
Not recorded · scope: module
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Labeled microreactor
Confidence
medium
Record reviewed
2 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

Penn State FRONTIER eVinci research proposal is recorded at University Park campus, Penn State, Pennsylvania, United States. Operator: No operator is recorded. Recorded vendor: Westinghouse Electric Company. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: OpenStreetMap Nominatim geocoder, OpenStreetMap Nominatim result: 'Penn State University' (amenity=university), University Park

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Reactor supplier
Customer or offtaker

Source-backed project statement Penn State's 4 March 2025 article says the eVinci planned for the FRONTIER research facility offers a way of powering the university's own research facilities and buildings across the University Park campus. That is an intended use by the host itself, stated as a capability, with no quantity, terms or third-party buyer. Penn State University deployment announcement

Fuel
  • Fuel form stated for eVinciUCO TRISO
No project-specific fuel supply arrangement is recorded as a structured fact.

Penn State's 4 March 2025 article says the eVinci can provide power for more than eight years without refuelling, which is a design statement. It names no fuel supplier, fabrication or delivery for the FRONTIER facility. Penn State University deployment announcement

Site host or owner
Not found in the sources we checked (3): Contractor; Funding and government decisions; Comparable schedule revision
Contractor

Penn State's 4 March 2025 article says the university submitted a letter of intent to the NRC on 28 February 2025 as the first step towards installing a Westinghouse eVinci, continuing a research collaboration with Westinghouse, the vendor, begun in 2022. No engineering, licensing or construction contractor is named, and the facility location is still to be determined. Penn State University deployment announcement

Funding and government decisions

Penn State's 4 March 2025 article states no grant, appropriation, cost share, loan or other amount for the FRONTIER eVinci facility, and the Westinghouse research collaboration it mentions is not described as funding. Penn State University deployment announcement

Comparable schedule revision

Comparable schedule revision not established. Penn State's 4 March 2025 article dates only the 28 February 2025 letter of intent to the NRC and says the university will keep engaging the regulator and determine possible locations. It gives no construction or operation target, so no schedule revision is shown. Penn State University deployment announcement

Not recorded in SMRMap's reviewed evidence (2): Operator or intended licensed owner; Programs and agreements naming the project
Operator or intended licensed owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Assessments of the design (not of this site)

(1)
  • CNSC vendor design review, Phase 2 (eVinci) — applies to the design, not to a site
    Design assessment · On hold · CNSC
    CNSC's table of current vendor design review agreements lists Westinghouse's eVinci (about 5 MWe) for Phase 2, with the review starting in June 2023 and its status on hold; Phase 1 objectives are addressed within the Phase 2 scope. The Canadian status does not describe eVinci's separate US test and deployment paths. CNSC says a vendor design review does not certify a design, issue a license or bind later Commission decisions.
    Sources: CNSC: vendor design review service agreements and completed reviews

    Status confirmed on against CNSC: vendor design review service agreements and completed reviews. This confirms the recorded status only; the general record check date remains separate.

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(5 notes)
  • Evidence review. Penn State’s page, published 4 March 2025, says Penn State and Westinghouse are engaging the NRC on a new nuclear research facility at the University Park campus. Penn State submitted a letter of intent on 28 February as the first step toward installing an eVinci microreactor. The page says the university will determine possible locations for the facility. It does not name Penn State as the reactor operator. The stored eVinci design and Westinghouse vendor stay, and no capacity is stated. Penn State is recorded as the host and proposer, not the operator. Nothing is taken from the existing Breazeale reactor. Last checked 19 Oct 2026. Penn State University deployment announcement
    What would change this

    An NRC application for the FRONTIER eVinci facility that names the campus location and the applicant or operator. Next scheduled check: 19 Jan 2027.

  • Next decision and prerequisites. Penn State's March 2025 announcement says the next steps are continued NRC engagement and determining possible locations for the eVinci research facility, as part of an application process begun with a letter of intent. It gives no date for an application or construction, so these remain open steps rather than scheduled milestones. Last checked 23 Oct 2026. Penn State University deployment announcement
    What would change this

    A Penn State site decision or NRC application date for FRONTIER. Next scheduled check: 23 Apr 2027.

  • Permissions and public process. Penn State's March 2025 announcement says the university submitted a letter of intent to the NRC on 28 February, the first step in the application process to install a Westinghouse eVinci microreactor at a new research facility at University Park. A letter of intent is not an application or license, and the announcement describes no public hearing; it invites the public to learn more through the project website. Last checked 23 Oct 2026. Penn State University deployment announcement
    What would change this

    A Penn State construction permit or license application to the NRC for the FRONTIER facility. Next scheduled check: 23 Apr 2027.

  • Site dependencies (land, grid, water). Penn State's March 2025 announcement places the proposed research facility on the University Park campus but says the university will continue to engage with the NRC and determine possible locations for it. No specific campus site, utility connection or other site arrangement is identified. Last checked 23 Oct 2026. Penn State University deployment announcement
    What would change this

    Penn State's selection of a campus location for the FRONTIER facility. Next scheduled check: 23 Apr 2027.

  • Spent fuel, waste and closure. Penn State's FRONTIER project website says Westinghouse has developed a spent-fuel process that needs no on-site handling or storage: after operation the eVinci reactor is cooled and moved to a licensed facility where the spent fuel is removed and placed in cask storage at a licensed location, and the reactor is refuelled at a factory. This is the vendor's described process as presented by the university, not a signed take-back contract, and it names no specific facility. Last checked 23 Oct 2026. Penn State FRONTIER project website
    What would change this

    A Penn State NRC application or contract with Westinghouse specifying spent-fuel removal and storage for the FRONTIER reactor. Next scheduled check: 23 Apr 2027.

Evidence dates

(0 of 2 sources with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated recorded event: no date recorded.2 of 2 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(2)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Penn State FRONTIER eVinci research proposal — https://smrmap.com/projects/penn-state-frontier/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Penn State FRONTIER eVinci research proposal”. Record reviewed 2 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/penn-state-frontier/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.