eVinci
Westinghouse's technology page gives 5 MWe as a design capability. It describes a 13 MWth core, while the IAEA's September 2026 microreactor outlook lists eVinci at 15 MWth; this profile leaves a single thermal rating unstated rather than reconciling possibly different configurations without a source. University Park's proposed eVinci research facility is separate from the existing Breazeale reactor; no construction, operating status or project capacity is inherited. Westinghouse reported zero-power criticality testing at the National Criticality Experiments Research Center on 24 August 2026. That test is a design milestone, not a project deployment. Separately, the CNSC vendor-review listing, marked modified 3 March 2026, lists eVinci Phase 2 as on hold, with the review having started in June 2023. That dated Canadian review status is not a cancellation of eVinci or a decision on its separate US test and deployment paths. A vendor design review does not certify a reactor or issue a license. DOE reported on 16 September 2026 that NCERC testing reached criticality on 3 September at 663 °C and included a peak core temperature of 1,011 °C. Westinghouse’s 15 September release clarifies that the 1,011 °C result was a separate subcritical reactivity measurement, not criticality at that temperature. DOE describes the commercial design as transportable, heat-pipe-cooled and TRISO-fueled at 5 MWe; the experimental data support prototype design. The test is a critical experiment at an existing NNSA facility, not a deployment.
- Reactor type
- Heat-pipe microreactor. How it works, with a 3D view.
- Projects
- Siting: Westinghouse eVinci at Malmstrom Air Force Base (ANPI). Furthest recorded stage of 5 using this design, including 2 canceled. Development status as stated: Detailed design.
- Evidence
- 9 sources; first primary source: Penn State University deployment announcement. Record reviewed 8 Oct 2026.
Key facts · Tracked projects · Agreements · Sources · Evidence · Regulatory actions · Its projects in the table · Compare with other designs
Key facts
- Class
- Microreactor
- Technology
- Other (see description)
- Coolant
- Other (see description)
- Developer / vendor(s)
- Westinghouse Electric Company
- Module electrical
- 5 MWe (gross/net unspecified)
- Fuel form
- UCO TRISO
- Development status (as stated)
- Detailed design
- Inclusion basis
- Labeled microreactor
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Neutron spectrum (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 8 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Spectrum
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- Penn State FRONTIER eVinci research proposal — Announced · United States
- eVinci DOME nuclear test reactor — Canceled · United States
- Westinghouse eVinci at Fort Drum (Army Janus) — Announced · United States
- Westinghouse eVinci at Malmstrom Air Force Base (ANPI) — Siting · United States
- SRC initial eVinci demonstration proposal (canceled) — Canceled · Canada
Agreements naming this design (1)
Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.
- Saskatchewan Research Council microreactor demonstration program (installation paused) — Government program · Paused · announced 27 Nov 2023
Concerns Canada
Design sources
(9)
- Penn State University deployment announcement (company, accessed 1 Oct 2026)
- Westinghouse: eVinci microreactor achieves zero-power criticality (25 August 2026) (company, accessed 6 Oct 2026)
- IAEA: Microreactors: Advances in Technology Development (2026 Outlook), IAEA/PAT/016 (IAEA/NEA, accessed 6 Oct 2026)
- Westinghouse eVinci microreactor technology page (company, accessed 8 Oct 2026)
- IAEA ARIS design record: eVinci (IAEA/NEA, accessed 2 Oct 2026)
- Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition) (IAEA/NEA, published Jun 2025, accessed 2 Oct 2026)
- CNSC: vendor design review service agreements and completed reviews (regulator, page updated 3 Mar 2026, accessed 28 Oct 2026)
- DOE Office of Nuclear Energy: Westinghouse eVinci Microreactor Achieves Criticality Milestone (government, published 16 Sep 2026, accessed 16 Oct 2026)
- Westinghouse: eVinci high-temperature experiment (company, published 15 Sep 2026, accessed 17 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. The 2024 SMR Technology Catalogue (third edition, June 2025) describes the Westinghouse eVinci Microreactor from Westinghouse Electric Company LLC, USA, as a micro-modular heat-pipe reactor with sodium heat pipes and graphite, rated 5 MWe/15 MWth, for heat and electricity in remote, mining, military and data-center uses, with design status 'Detailed Design'. Westinghouse's current technology page instead says 5 MWe with a 13 MWth core design, so the thermal rating differs between sources. The CNSC vendor-review list (modified 3 March 2026) shows eVinci Phase 2 started in June 2023 and on hold. Westinghouse reported zero-power criticality at NCERC in August 2026, and DOE's 16 September 2026 article says the test reached criticality on 3 September 2026 at 663 degrees Celsius and that eVinci was selected in August 2026 for the next phase of the Army Janus Program. Penn State's announcement links the Penn State project (an NRC letter of intent filed 28 February); the DOE Janus mention matches the Fort Drum project only at program level, and no opened source names the DOME test, Malmstrom or the Saskatchewan proposal. Stored vendor, 'other' family and coolant, 5 MWe, TRISO fuel and the empty thermal rating stay; the neutron spectrum stays unknown because no source states it. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition); Westinghouse eVinci microreactor technology page; DOE Office of Nuclear Energy: Westinghouse eVinci Microreactor Achieves Criticality Milestone; CNSC: vendor design review service agreements and completed reviews; Penn State University deployment announcement
What would change this
An NRC pre-application or application document for eVinci (or the next ARIS/SMR catalog edition) that states the neutron spectrum and reconciles the 13 MWth and 15 MWth core ratings; or a CNSC update lifting the Phase 2 hold. Next scheduled check: 19 Jan 2027.
- Neutron spectrum: Not disclosed in the reviewed evidence. No opened source states eVinci's neutron spectrum. The ARIS record leaves its spectrum field empty, and the catalog gives only sodium heat pipes and graphite; inferring a thermal spectrum from that would go beyond the sources. Last checked 19 Oct 2026. IAEA ARIS design record: eVinci; Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
What would change this
A Westinghouse or NRC eVinci technical report (for example a pre-application topical report or a later ARIS record with the spectrum field filled) that explicitly states thermal or epithermal spectrum. Next scheduled check: 19 Jan 2027.
Regulatory actions
Compare reviews and approvals across designs
Design assessment
- CNSC vendor design review, Phase 2 (eVinci) — applies to the design, not to a site
Design assessment · On hold · CNSC
CNSC's table of current vendor design review agreements lists Westinghouse's eVinci (about 5 MWe) for Phase 2, with the review starting in June 2023 and its status on hold; Phase 1 objectives are addressed within the Phase 2 scope. The Canadian status does not describe eVinci's separate US test and deployment paths. CNSC says a vendor design review does not certify a design, issue a license or bind later Commission decisions.
Sources: CNSC: vendor design review service agreements and completed reviewsStatus confirmed on against CNSC: vendor design review service agreements and completed reviews. This confirms the recorded status only; the general record check date remains separate.