Projects / Czechia · Siting

Rolls-Royce SMR Dětmarovice candidate location

Named location under study in the ČEZ / Rolls-Royce SMR partnership.

Current status

Stage
Siting
How current
General record check . Bounded evidence review . 1 of 5 listed sources has a publication or document date recorded here: 27 Feb 2023. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

Newest recorded development . Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
Announced 21 Jul 2026 · Announcement: Rolls-Royce SMR Dětmarovice candidate location proposal documented. Named location under study in the ČEZ / Rolls-Royce SMR partnership. Source: ČEZ additional Czech SMR locations. Updates entry
More on this development

Site selection studies and a proposal do not establish construction or a committed unit count.

Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.
  • State or province is not recorded.
Same design
6 tracked: 5 siting. Separately: 1 suspended. 65 tracked at siting across all designs. Recorded stages, not proof of current activity.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Pressurized water reactor. How it works, with a 3D view.
Schematic of Rolls-Royce SMR. On the left, a reactor vessel holds a core of fuel assemblies, with control rod drives above its head.
Schematic of Rolls-Royce SMR.

Description

Site selection studies and a proposal do not establish construction or a committed unit count. A July 2026 memorandum between the industry ministry, ČEZ and Rolls-Royce SMR names Dětmarovice and Tušimice as sites being assessed, three sites in all for up to six units. ČEZ said in February 2023 that exploration of the Dětmarovice and Tušimice power-plant sites had begun and that their suitability was not yet established. Unlike Tušimice, no environmental-assessment filing for an SMR at Dětmarovice was found in web searches read on 28 October 2026; the Czech assessment register could not be searched by site or category, and the only Dětmarovice entry opened (OV9235) is a non-nuclear ČEZ Teplárenská project. The site is being evaluated, which is the Siting stage; no environmental assessment or nuclear license application is recorded.

Key facts

Design
Rolls-Royce SMR (SMR)
Technology
Pressurized water reactor (PWR) · light water. The 2024 SMR Technology Catalogue describes a three-loop pressurized water reactor, so no integral layout is recorded.
Reactor vessel of this design
7.82 m tall, 4.2 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 79.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
All vessels to scale
Operator(s)
Not recorded
Vendor for linked design
Rolls-Royce SMR
Design origin
United Kingdom: where the design's vendor is recorded, not where parts are made · See designs from this origin on a 3D globe
Location
Dětmarovice candidate location · Czechia · precision: site area (named plant, laboratory, base, port, campus or parcel)
Approximate coordinates for the named Dětmarovice candidate location from the NuclearChain reactors export (CC BY 4.0; derived from GEM's tracker).
Coordinates
49.9065, 18.4707 · site-area point (approximate)
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
28 Oct 2026
Site and capacity notes

Rolls-Royce SMR Dětmarovice candidate location is recorded at Dětmarovice candidate location, state or province not recorded, Czechia. Operator: No operator is recorded. Recorded vendor: Rolls-Royce SMR. Stage: Siting. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: NuclearChain reactors.csv export (unit coordinates), NuclearChain reactors.csv row 'detmarovice-nuclear-power-plant' (49.9065414, 18.4707066)

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project. The linked design record states 1358 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Reactor supplier
Fuel
  • Fuel form stated for Rolls-Royce SMRUO2
No project-specific fuel supply arrangement is recorded as a structured fact.

The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. MPO: Czech Republic will develop further SMR sites; ČEZ additional Czech SMR locations

Programs and agreements naming the project
Not found in the sources we checked (4): Customer or offtaker; Contractor; Funding and government decisions; Comparable schedule revision
Customer or offtaker

The reviewed sources do not establish a named project-specific power or heat purchaser, contractual quantity or completed offtake. Intended uses, host municipalities and general company customer plans are not buyer commitments. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. MPO: Czech Republic will develop further SMR sites; ČEZ additional Czech SMR locations; World Nuclear News: ČEZ submits EIA documentation for the Temelín Rolls-Royce SMR to the Ministry of the Environment

Contractor

The reviewed sources do not establish an additional project-specific engineering, preparatory-work or construction assignment. A supplier’s general capabilities or an industry-wide agreement do not establish a contract for this site. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. MPO: Czech Republic will develop further SMR sites; ČEZ additional Czech SMR locations; World Nuclear News: ČEZ submits EIA documentation for the Temelín Rolls-Royce SMR to the Ministry of the Environment

Funding and government decisions

The reviewed sources do not establish a project-specific financing commitment or amount. General company backing, ownership and policy support do not by themselves establish allocated or paid project funding. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. MPO: Czech Republic will develop further SMR sites; ČEZ additional Czech SMR locations

Comparable schedule revision

Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. MPO: Czech Republic will develop further SMR sites; ČEZ additional Czech SMR locations

Not recorded in SMRMap's reviewed evidence (2): Operator or intended licensed owner; Site host or owner
Operator or intended licensed owner
Reviewed 20 Oct 2026: not disclosed in the reviewed evidence.
Site host or owner

Timeline

Recorded developments

Permissions and applications

Assessments of the design (not of this site)

(2)
  • Rolls-Royce SMR Generic Design Assessment — applies to the design, not to a site
    Design assessment sought · Under review · ONR/EA (UK)
    Generic Design Assessment of the Rolls-Royce SMR design by the UK regulators. ONR's page (read 3 October 2026) shows Step 1 from April 2022 to April 2023, Step 2 to July 2024 with published Step 2 statements, and Step 3 under way since July 2024. A GDA assesses the generic design only; it is not permission for any site, construction or operation, and no Step 3 conclusion is recorded here. The reactors index, fetched 5 October 2026, still lists this as the active assessment and does not record a Step 3 conclusion. Re-read on 28 October 2026, ONR's page still describes the assessment as ongoing.
    Sources: ONR Generic Design Assessment: Rolls-Royce SMR

    Status confirmed on against ONR Generic Design Assessment: Rolls-Royce SMR. This confirms the recorded status only; the general record check date remains separate.

  • Rolls-Royce SMR UK Generic Design Assessment, Step 2 — applies to the design, not to a site
    Design assessment · Review completed (not an approval) · ONR/EA (UK) · completed 30 Jul 2024
    The UK regulators completed Step 2 of their three-step Generic Design Assessment of the Rolls-Royce SMR on 30 July 2024 and issued Step 2 statements. Step 2 began on 3 April 2023, after Step 1 from April 2022 to April 2023. Step 3, the detailed assessment, began in July 2024 and is recorded separately as under way. Completing Step 2 is not a Design Acceptance Confirmation or permission for any site.
    Sources: Environment Agency: assessing new nuclear reactor designs; ONR Generic Design Assessment: Rolls-Royce SMR; Environment Agency and Natural Resources Wales: GDA Step 2 of the Rolls-Royce SMR

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(5 notes, 1 not yet reviewed)
  • Evidence review. The 21 July 2026 Ministry of Industry release says a memorandum among the ministry, ČEZ and Rolls-Royce SMR opens preparation of further sites, and that Dětmarovice in the Moravian-Silesian Region and Tušimice in the Ústí Region are being assessed. The same release quotes a ceiling of up to six Rolls-Royce SMRs across three Czech sites, and up to 3 GW from those reactors. That ceiling is not a Dětmarovice unit count. Each Rolls-Royce SMR plant is described as 470 MWe, which is not stored as this site's output. The first Czech small modular reactor is expected at Temelín, not here. The GEM capture does not name Dětmarovice and is not used. The participating organizations retain only their source-supported roles; a reactor operator is not assigned from the study, proposer, parent, existing-fleet or proposed-owner relationship. ČEZ's release of 27 February 2023 named Dětmarovice and Tušimice as tentatively preferred sites for further SMRs and said exploration of both power-plant sites, for active faults, hydrogeology and bedrock, began in the first half of February 2023, before their suitability was established. The stage is Siting because the named site is being evaluated and characterized, which the stage gate keeps at Siting; no environmental-assessment filing or nuclear license application is recorded. Last checked 28 Oct 2026. MPO: Czech Republic will develop further SMR sites; ČEZ additional Czech SMR locations; ČEZ: After preliminary assessment ČEZ has identified two preferred construction sites for small modular reactors, in addition to the Temelín pilot location, in Dětmarovice and Tušimice
    What would change this

    A ČEZ environmental-assessment notification for an SMR at Dětmarovice, or a statement dropping the site. Next scheduled check: 28 Jan 2027.

  • Operator or intended licensed owner: Not disclosed in the reviewed evidence. The reviewed sources establish other participant roles, but do not appoint the recorded party as this reactor’s operator. The operator remains unassigned; this does not assert that no operator exists. Last checked 20 Oct 2026. MPO: Czech Republic will develop further SMR sites
    What would change this

    A project-specific filing, operating agreement or developer statement explicitly names the proposed reactor operator. Next scheduled check: 20 Jan 2027.

  • Next decision and prerequisites. The July 2026 ministry release says the memorandum with ČEZ and Rolls-Royce SMR opens preparatory work on new locations, with Dětmarovice among those being assessed, and that the government will decide in 2028 on the schedule and construction of further units. It does not say whether that decision covers an SMR at Dětmarovice, and gives no Dětmarovice-specific decision date. Last checked 23 Oct 2026. MPO: Czech Republic will develop further SMR sites
    What would change this

    A 2028 government decision on further SMR units, or a ČEZ EIA notification for Dětmarovice. Next scheduled check: 23 Apr 2027.

  • Permissions and public process. The Ministry of Industry and Trade said on 21 July 2026 that a memorandum between the ministry, ČEZ and Rolls-Royce SMR opens the way to preparing new SMR locations, with Dětmarovice in the Moravian-Silesian region among those being assessed. A memorandum is not a permission, and the release does not mention any environmental assessment filing or license application for Dětmarovice. Last checked 23 Oct 2026. MPO: Czech Republic will develop further SMR sites
    What would change this

    An EIA notification for an SMR at Dětmarovice published in the national EIA information system, or a ČEZ project announcement. Next scheduled check: 23 Apr 2027.

  • Site dependencies (land, grid, water). The July 2026 ministry release names Dětmarovice as a location under assessment and says the grounds of existing coal power plants look suitable for SMRs that could also supply heat to nearby towns. That is a general suitability statement under a memorandum, not a site study, land arrangement or grid or water agreement for Dětmarovice. Last checked 23 Oct 2026. MPO: Czech Republic will develop further SMR sites
    What would change this

    An EIA notification or ČEZ site study for Dětmarovice describing the plot, cooling water and grid connection. Next scheduled check: 23 Apr 2027.

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(1 of 5 sources with a publication or document date)
Latest dated listed source publication: ČEZ: After preliminary assessment ČEZ has identified two preferred construction sites for small modular reactors, in addition to the Temelín pilot location, in Dětmarovice and Tušimice: 27 Feb 2023.Latest dated recorded event: Rolls-Royce SMR Dětmarovice candidate location proposal documented: 21 Jul 2026.4 of 5 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(5)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Rolls-Royce SMR Dětmarovice candidate location — https://smrmap.com/projects/rr-detmarovice/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Rolls-Royce SMR Dětmarovice candidate location”. Record reviewed 28 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/rr-detmarovice/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.